KOORDINAT UTM
FID CODE HI TITIK ARAH RH DATE TYPE ELEVASI
UTM NORTHING
1 STNPT1 1,5 m 1/20/2024 STNMEAS 198.8 49.S 9171370,85974476
2 P1 1,470 m 1/20/2024 MEAS 200.756 49.S 9171392,60601301
3 UP1 1,470 m 1/21/2024 MEAS 200.478 49.S 9171387,57302922
4 P2 1,470 m 1/22/2024 MEAS 199.831 49.S 9171383,23625449
5 P3 1,470 m 1/23/2024 MEAS 199.026 49.S 9171381,48702392
6 P4 1,52 m 1/24/2024 MEAS 199.009 49.S 9171377,33202316
7 P5 1,52 m 1/25/2024 MEAS 197.975 49.S 9171373,45505884
8 P6 1,52 m 1/26/2024 MEAS 197.301 49.S 9171369,67722904
9 P7 1,52 m 1/27/2024 MEAS 197.156 49.S 9171356,06253701
10 P8 1,52 m 1/28/2024 MEAS 196.972 49.S 9171348,64484724
11 P9 1,52 m 1/29/2024 MEAS 197.386 49.S 9171342,27117724
12 P10 1,52 m 1/30/2024 MEAS 197.287 49.S 9171339,61708914
13 P11IP 1,52 m 1/31/2024 MEAS 197.379 49.S 9171331,41012592
14 P12 1,52 m 2/1/2024 MEAS 197.146 49.S 9171321,67878499
15 P13 1,52 m 2/2/2024 MEAS 197.008 49.S 9171312,38221782
16 P14 1,52 m 2/3/2024 MEAS 196.961 49.S 9171298,52760052
17 P15 1,52 m 2/4/2024 MEAS 196.655 49.S 9171292,31639587
721785263.xlsx
2
721785263.xlsx
KOORDINAT UTM
DATUM/
NORTHING EASTING LINTANG BUJUR
ELLIPSOID