B3 FUEL SYSTEM
Fuel gas piping from source to gas header at power house 2 X X
Please make sure gas regulator asset
2 X X
Citra Tubindo refer to scope C1
Fuel gas header and piping from header to gas train
Fuel gas flow metering system 2 X X
Pressure Regulator to drop gas pressure to 5 Bar 2 X X
Check Packing List. If not available
2 X
Fuel Pre-Pressure Gas Train (inlet pressure max 5 Bar) will be provided by HA
Fuel Gas Train (Zero Pressure Regulator) 2 X Incl. in core genset
Fuel gas piping from gas train to engine 2 X X
Fuel gas piping support (from gas train to engine) 2 X X
B4 STARTING SYSTEM
4 x Caterpillar battery.
2 X Check Packing List. If not available will
24VDC starting battery set including cable be provided by HA
Battery support / rack 2 X
B5 EXHAUST SYSTEM
Exhaust gas piping, BSP sch 10, 18"ID, incl. emission sampling point 2 X
Existing exhaust dismantle by existing
2 X
Exhaust gas silencer, 18"ID, residential grade incl. exhaust compensator vendor
Exahust pipe heat insulation (rockwool 100 kg/m3, 50 mm thickness) covered with 0.6
2 X
mm aluminium cladding (inside genset enclosure)
Exhaust piping & muffler support (incl. platform for emission sampling) 2 X
B6 VENTILATION SYSTEM
Powerhouse existing. Request As-
2 X X
Fresh air intake fan, 0.5" static pressure Built Drawings from customer.
Ducting for intake fan 2 X X
Intake air dust filter 2 X X
Intake air attenuator 2 X X
Discharge air attenuator 2 X X
Louvre for intake & discharge air 2 X X
Ventilation system support 2 X X
B8 LUBRICATION SYSTEM
Oil make up tank (500 liters) 2 X Oil filter 4000jam
Oil make up tank filling line (from oil drum) 2 X
Oil make up tank filling pump 1 X
First Fill of Engine Lube Oil (Caterpillar NGEO) 2 X
C4 DC SYSTEM
24 VDC power charging supply for genset starting battery 2 X Include in control panel MCC
D. WORKSHOP
D3 INSPECTION
1 Citra Tubindo do not plant to visit SIN.
Ticket & accomodation for genset witness test at factory
E3 LOADING / UNLOADING
Equipment unloading at site (incl. lifting / unloading equipment) 1 X
Genset n auxiliaries moving to foundation 1 X
F4 MANUAL
Genset operation & maintenance manual (OMM) 1 X
Mechanical equipment OMM 1 X Trakindo supplied only
Electrical equipment OMM 1 X Trakindo supplied only
G. PROJECT MANAGEMENT
G1 PROJECT MANAGEMENT
Project management 1 X X
Installation supervision 1 X X
G2 SITE PREPARATION
Site survey 1 X X
G3 DOCUMENTATION
Project documentation 1 X
G4 PERMITS
Site working permit 1 X
H2 FOUNDATION
Foundation modification. Request As-
1 X X
Power House foundation detail design Built Drawings from Citra Tubindo
Genset & Auxiliaries foundation detail design 1 X X
H3 CIVILWORKS
Construction of power house foundation 1 X
Construction of genset & auxiliaries foundation 1 X
I. SITE INSTALLATION
I1 LABOUR
Mechanical installation 1 X Trakindo supervision only
Electrical installation 1 X Trakindo supervision only
I2 ACCOMODATION
Labour accomodation (housing & meal) 1 X
Labour transportation from camp to site 1 X
I3 SITE FACILITY
Site security during construction 1 X
Equipment lay down area during construction 1 X
I6 CONSUMABLE
Installation consumables & utilities (electricity by genset including fuel, etc) 1 X
J. COMMISSIONING
J1 PRE COMMISSIONING
Pre-commissioning of genset mechanical system 1 X X
Pre-commissioning of genset electrical system 1 X X
J2 COMMISSIONING
Commissioning of genset (note : load / loadbank to be provided by Customer) 1 X X
J3 TEST
Genset performance test (note : load to be provided by Customer) 1 X X
Reliability run test (note : using site load) 1 X X
J4 REPORTS
Genset test reports 1 X
J5 TRAINING
Operation & maintenance training 1 X