October 12,2023
Good day!
The GCL88 Builders & Commercial Trading Corp., together with ZTE PHILS., Inc. and ILECO 2 Inspection Team,
headed by Engr. Jose Belicina conducted an ocular inspection on the electric poles selected and identified by our
ZTE Team last October 10,2023.
This is to report to you that we have covered ten (10) barangays of five (5) municipality, to wit:
Municipality Barangay Electric Poles
Dumangas Barasan 7
Cayos 10
Bantud Fabrica 19
Pototan Lopez Jaena Ward 20
Ubang 17
Cahaguichican 6
Ledesma Ward 12
Janiuay Sta. Rita (Poblacion) 2
Captain Tirador 7
Duenas Cabudian 17
Dingle Bongloy 17
For your validation of our request for RTA and eventually the released of NTP. These identified barangays are
subject for the implementation of PLDT/ZTE Fiber Gen Project now for your approval.
Rest assured that we will do our utmost care with your facilities. Thank you very much.
Sincerely yours,