You are on page 1of 1

Company: Archirodon Construction (Overseas)

Project: Asab Field Devt.: Phase 2 (Stage 2)


Offer No.: 340-005873-PQ4 R1/2023 dated 14.12.2023
Our General Terms and Conditions (Schedule 8) are applicable and constitute an integral part of our Offer/Agreement

SCHEDULE 1 - BILL OF QUANTITY


Scope of Delivery with Prices

Pos. Net Unit Price Total Price


Article No. Description Quantity
No. [AED] [AED]

TOTAL OFFER VALUE [AED] 328,917.48


VALUE ADDED TAX (VAT) AT 5% [AED] 15,662.74

TOTAL NET PURCHASE PRICE + SERVICES [AED] 313,254.74

1 WALL FORMWORK COMPONENTS 313,254.74

1.1 189931000 Doka beam H20 eco P 3.90m 300 136.50 40,950.00

1.2 189936000 Doka beam H20 eco P 2.45m 300 85.75 25,725.00

1.3 839902007 Multi-purpose waling WS10 M 2.00m 125 300.00 37,500.00

1.4 839902017 Multi-purpose waling WS10 M 6.00m 65 900.00 58,500.00

1.5 587533000 Formwork element connector FF20/50 Z 50 103.05 5,152.50

1.6 580035000 Internal angle plate H20 Top50 10 319.13 3,191.30

1.7 580135000 Flange clamp H20 2134 44.51 94,984.34

1.8 580201000 Connecting pin 10cm 300 9.30 2,790.00

1.9 580201000 Connecting pin 10cm 160 9.30 1,488.00

1.10 580204000 Spring cotter 5mm 300 1.06 318.00

1.11 580204000 Spring cotter 5mm 160 1.06 169.60

1.12 580460000 Lifting bracket 50 160.48 8,024.00

1.13 580603000 Corner connecting plate 90/50 20 277.52 5,550.40

1.14 580604000 Universal angle tie bracket 20 133.08 2,661.60

1.15 189939000 Doka beam H20 eco P 1.25m 600 43.75 26,250.00

2 SERVICES -

2.1 Freight - Materials to be collected by Client -

Important Notes:
1) Price change: Prices mentioned in this offer are subject to change if the global price index for raw materials increases by 5% or more.
2) By reading and accepting this quotation and consequently issuing a Purchase Order containing a reference to DOKA9s quotation,
the client undertakes that they accept in totality DOKA9s General Terms and Conditions, which are attached with this quotation.

You might also like