You are on page 1of 6
LLLP LINCS SCM Web - www subbulldingcontractorn [Proiect Name = LOGOS \Address -Ajc Bose Road, Kolkata, 1 [Providing and laying proprietary water proofing system to all type waterproofing work., contractor has to execute the work as per approved methodology, (approved SIKA Camicals), in accordance to the manufaturer's specificationand and to the satisfaction of PMC/EIC/Owner. 2 |All the work has to be carried out by the approved specialist agency no sublet of works permitted. 3 | Provide 22 years written warranty given stamp paper for the all water proofing application. 4 |Measurement will be made on actual area application of water proofing treatment, relevant is codes /Approved manufacturer's specification needs to be followed, or as desired by the engineer-in-charge/ ‘Structural consultant. ‘CONSULTANT SIGNATURE SUE UU Pl SOWA |CONSTRCUTION JOINT: DURING CONSTRUCTION: Supply and installing Sika Swell A 2010-a hydrophilic, water stop of |(20.x 10) mm fixed with adhesive Sika Swell A 2010, having good all-round chemical resistance, capable of delayed initial swelling and reversible swelling in case of wet-dry cycles. When in contact with water the Idrostop 10 Waterbars will stowly increase in volume (swell) without changing the homogeneous structure of the polymer matrix.The pressure of the swelling action will cause the Idrostop 10 Waterbar to profile itself exactly into the joint filing all cavities and effectively stopping water seepage, even at high external water pressure. a |Construction joint treatment:- Construction Joint treatment after construction :- All the construction joints needs to be| Jgroove cut unto a min depth & width of 25mmmx25mm. The groove shall be cleaned free from dust loose particles and lany other flaky material which restricts the bonding of the new system to the old concrete. Then the groove is also 2.1 cleaned with water and once the groove is in SSD condition, Sika Monotop 122 F-a medium strength (40 Mpa), shrinkage-compensated,fibre-reinforced, thixotropic mortar of R3 category of EN 1504-3 shal be filled tight |completely into the groove. All the joints once treated in this manner shall be ready for coating after 48 hrs. All he tie- rod holes shall be grouted with a shrinkage-compensated medium strength grout. [Tie-rod cutting & filling:- All the tie-rod holes shall be cut 25 mm depth and filed with a shrinkage-compensated Jmedium strength(M40) mortar Sika Monotop 122F ~ and level the surface. | WATERPROOFING TREATMENT:- Supply and applying two coats of a single-component, water-based, palymer= |modified, polyurethene-asphalt hybrid or equivalent waterproofing liquid applied membrane called Sikalastic 450- which cures to form a tough and highly elastic membrane with an elongation of >800% (ASTM D 412-98), with a static & dynamic erack-bridging ability of 2mm & Imm (ASTM C 836:00) respectively when applied with 0.S0kg/m2/coat, The Product shall have the solid contents approximately upto 60%. The product when applied with the mentioned coverage| |should exhibit Tensile strength of >2 Mpa (ASTM D 412-98) & a Tear strength of 1.08 Mpa (CNS 6986, CNS 6988). The Jproduct is applied in two coats. When the second coat is still tacky ,seieved sand ( 0.5 MM) shal be sprinkeled all over the coated surface which shall act as a mechanical key between the coating and plaster. The coating shall be applied after priming the surface by coating Plastimul PUW diluting itn 1:3 ratio with water. DFT -0.8-1 mm. Termination- Pu [coating will be terminated at grove (30 mm) below the 100 mm of finish retaining wall length grove filed with PIM |CONSTRCUTION JOINT: DURING CONSTRUCTION:-Supply and installing Sika Swell A 2010- a hydrophilic, water stop of (20 x 10) mm fixed with adhesive Sika Swell A 2010- oF (alling), having good all-round chemical resistance, capable of delayed initial swelling and reversible swelling in case of wet-dry cycles. When in contact with water the Idrostop 10 Watertars will slowly increase in volume (swell) without changing the homogeneous structure of the polymer Imatrix.The pressure of the swelling action will cause the Idrostop 10 Waterbar to profile itself exact into the joint iting al cavities and effectively stopping water seepage, even at high external water pressure. Protective Plaster :- The waterproofing coating shall be protected with a plaster of 1:3 mixed with an Integral waterproofing admixture such as Sika Plastocrete Plus @ 200gms/50 kg cement. 23 24 |Nozzle Grouting :- injecting cement slurry with NSG compound by pressure grouting on RCC raft after 28 days using |12mm dia, 75 mm long PVC/GI nozzles 1.0m C/C in the concrete sealing the nozzles with the quick set compound, Extra nozzles are to be provided along the construction joint. Grouting at pressure of 2-3 kg/ cm2 through the nozzal with [coment & Sika intraplus EP slurty admixed with 0.5 ke/ cement bag. 3a 4a su EUVILDUIsE SONIA Cl [Substrate Condition & Surface Pr - [All substrates, whether new or old, must be soli, clean using chiping and grinding, dry and free of all traces of oil, lgrease, old paint, rust, mould and any other material which could affect adhesion, a2 [coving ; Providing and Applying at the junction of stab and vertical offsets with Cement Mortar 1:4 and admixed with - Sika Latex SBR at dosage of 5 litre per SOkg cement. (cement and sand shall be supplied by the client) Making cova of [20°20 mm size. 43 [Bore Packing:- Providing and laying of the shrinkage compensated thixotropic mortar for the pipe cut outs at drain outlets & bore packings. The pipes to be fixed should be profiled rough to provide a proper bond and the same to be aligned. Minimum of 20-25 mm all-round gap to be provided between the pipe and the care applying non- shrink |thixotropic mortar-sikaMonotop 122F and than Sikagurd 694 Fi) apply. 44 [Nozzle Grouting :- Injecting cement slurry with NSG compound by pressure grouting on RCC raft after 28 days using '12mm dia, 75 mm long PVC nozzles 1.0m C/C in the concrete sealing the nozzles with the quick set compound. Extra nozzles are to be provided along the construction joint. Grouting at pressure of 2-3 ke/ cm2 through the nozzal with lcement & Sika intraplus EP slurry admixed with 0.5 ke/ cement bag. a5 [Food Grade Epoxy for UGT & OHT [Supply and application of two-component epoxy paint made from epoxy resins and special pigments with high covering| |capacity called Sikagurs 67 HC-produced by Sika ) for anti-acid and non-toxic coatings on cancrete surfaces. Apply two |coats of the product on a soli, clean substrate treated with primer with a brush, roller or by airless spray. Wait Jbetween 6 and 24 hours between each coat, according to surrounding conditions. The product must comply with the lorinciples defined in EN 1504-2/-9 and have the following characteristics: Haber abrasion resistance (g):0.1 viscosity - rotor 5, 20 revs (mPas}: 1500 46 [Acid & Chemical resistant Epoxy for STP. [Supply and application of two-component epoxy paint made from epoxy resins and special pigments with high covering| capacity having anti-acid coatings called Sikagurd 63 N on concrete surfaces. Apply two coats of the product in Jcompliance to comply with the principles defined in EN 1504-2/-9 on a solid, clean substrate treated with primer with a brush, roller or by airless spray with a waiting time of 6 and 24 hours between each coat. The product must exhibit, abrasion resistance (EN !SO 5470-1 of 919 mg, permeability to CO2 (EN 1062-6) of SD 1255 m, permeability to water vapour (EN 150 7783-1-2) should be class Il, capillary absorption and permeability to water (EN 1062-3) of 0.02 kg/m*«h0.5, resistance to thermal shock (EN 13687-5) of 3.5 MPa, resistance to severe chemical attack (EN 13529) Jshould have no alteration, impact strength (EN 1SO 6272-1)should be class I, direct traction adherence (EN 1542) of 13.89 MPa & reaction to fire complying to Euro class Ef sa sULE UL Olin COKUMMCHK [Surface Preparation : The entire surface shall be cleaned free from dead mortar, by chipping, grinding and any other |mechanical means approved by the engineer in-charge. It shall be made free from loose particles, dust and any other laitance that shall impair the adhesion of the waterproofing membrane to the substrate. 5.2 [Coving : Providing and Applying at the junction of slab and vertical offsets with Cement Mortar 1:4 and admixed with - ika Latex SBR~ at dosage of 5 litre per SOkg cement. (cement and sand shall be supplied by the client) Making cova of 120*20 mm size. 53 Bore Packing:- Providing and laying of the shrinkage compensated thixotropic mortar for the pipe cut outs at drain Joutlets & bore packings. The pipes to be fixed should be profiled rough to provide a proper bond and the same to be igned. Minimum of 30-35 mm all-round gap to be provided between the pipe and the core applying non- shrink thixotropic mortar SikaMonotop 122F and then Sikagurd 694F(i) appl 54 |CRACK TREATMENT : All the cracks found in the slab shall be cut open into a width of at least 6 mm and depth of 6 mm. The chased open crack shall be cleaned free from dust and shall be filled with a solvent free epoxy resin called sikadur SSLP IN- which is pourable and shall fil the crack for monolithic sealing, [Waterproofing coating : Supply and application of two-component normal setting cementitious coating for waterproofing and protecting concrete called Sika Top Seal 109 Hi for waterproofing a concrete slab. Apply the mortar after adequate preparation of the substrate, which must be clean, solid and degreased. Apply the product on the surface of clean, dry substrates with a roller/brush at least two criss-cross coats of product @ 2 ke/sqm/per 2 coats to {form a seamless coating. [Compressive strength (MPa) EN12190 : (after 28ays) >15,Elongation 10-20%, Flexural strength (MPa) EN196/1:: (after 28 days) > 6 Adhesion to concrete after 28 days (MPa) EN1542: >> 1.8 Mpa Water absorption reduction vs. reference concrete (94) after 7 days at 1,5 bar EN 14891-285 [Water ponding Test:- Once the waterproofing is done, the slab shall be ponded with water of 100 mm for up to 48 hours. 55 [Protection Screed (Horizontal Suerface): Protection Screed Concrete using M20 Grade Screed Concrete using 12mm down size towards downtake pipe. Additive Sika Plastocrete Plus - @ Dosage of 200 gms/Bag of cement. Thickness SOmm average thickness 56 Protection plaster (vertical surface): Protection Plaster over waterproofing for vertical surface with plaster (plaster thickness 12 to 15mm) Additive Sika Plastocrete Plus - @ Dosage of 200 gms/Bag of cement. 61 Stee LEUTTEATTINGS CONMEBOL Surface preparation : The entire surface shall be cleaned free from dead mortar, by chipping and grinding and any lother mechanical means approved by the engineer in-charge. It shall be made free from loose particles, dust and any lother laitance that shall impair the adhesion of the waterproofing membrane to the substrate. 62 ‘coving: Providing and Applying at the junction of slab and vertical offsets with Cement Mortar 1:4 and admixed with-— Isika Latex SBR at dosage ofS litre per SOkg cement. (cement and sand shall be supplied by the client)Making cova of 12020 mm size. 63 Bore Packings- Providing and laying of the shrinkage compensated thixotropic mortar for the pipe cut outs at drain outlets & bore packings. The pipes to be fixed should be profiled rough to provide a proper bond and the same to be aligned, Minimum of 20-25 mm all-round gap to be provided between the pipe and the core applying non shrink thixotropic mortar SikaMonotop 122 F and than Sikagurd 694 Fli) apply. 64 Water Ponding: Once the coving is done, the slab shall be ponded with water for up to 48 hours. Any weak areas round, shall be pressure grouted from the top. Any cracks in the slab shall be treated with crack treatment. CRACK TREATMENT; All the cracks found in the slab shall be cut open into a width of at least 6 mm and depth of 6 mm. The chased open crack shall be cleaned free from dust and shall be filled with a solvent free epoxy resin called sikadur SUP IN which Is pourable and shall fil the crack for monolithic sealing, Priming:- Supply and application ofa coat of two-component Sika floor 161HC epoxy primer with fillers using a smooth metal trowel or spreader, made from solvent-free epoxy resin called Primer SN and mixed with dry quartz sand of l.Smm, if required, at a ratio of up to 1:0.5 and applying it @ 0.5-0.7 kg/sqm according to the surrounding Itemperature, depending on the surface absorbtion. moisture must be below 4 %. [Waterproofing coating:- Supply and application of two-component, solvent-free, Pure Polyurea membrane called sikalastic 853 RAP, with immediate permeability and rapid set to foot traffic, for waterproofing flat roofs. Apply a2 mm thick layer of the product @ 2.2kg/sqm with a high-pressure, bi-mixer industrial spray gun with flow and temperature control, fitted with a self-cleaning spray gun, on solid clean substrates treated beforehand with primer. thus applied Polyurea membrane shall exhibit a ElongatB65:866ion of >300%, Tensile strength of >20 N/mm2 and Tear resistance of >80 N/mm, Shore Hardness (A) of 90 or more and quick reaction of product when applied by spray: gel time at +70°C < 6 seconds. moisture must be below 4 %. coating Dft 1.8- 2mm. Termination- Above 300 mm grove of 40 mm will be cut and Polyurea coat will be terminated then fill the grove with polymer modified motar. At podium level coating will be cover the podium slab and the retaining wall joint and down word 100 mm below the joint then protected with plaster. later ponding Test;- Once the waterproofing is done, the slab shall be ponded with water of 100 mm for up to 48 hours. 6s Protection plaster (vertical surface): Protection Plaster over waterproofing for vertical surface with plaster (plaster thickness 12 to 15mm) Additive sika plastocrete plus - @ Dosage of 200 gms/Bag of cement. 66 PROTECTIVE SCREED ; The coated surface shall be protected with a 75mm thick screed with grade as per the design requirement, maintaining a slope of 1 in 100 or as per drawing. The screed that shall be aid is admixed with Sika plastocrete plus an integral waterproofing admixture @ dosage of 250 gms per 50 kg cement.. The curing shall be done as for a minimum of 7 days. 6a 2U. LULL Edis SOMA [surface Preparation: The entre surface shal be cleaned free from dead mortar, by chipping, wire-rushing and any other mechanical meen aporoved by te enginaerin charge. It shal be made fre rom lose parties, dust and any ote tance tht shal impale adhesion of the waterproofing membrane to the substrate, 62 Bore Packing Providing and laying ofthe srinkage compensated thhotrope mortar fr the ppe eat outs a arin outets& bore packings The pipes tobe fixed shouldbe profiled rough to provdea proper bond andthe same to be signed, tinimum of 20.25 mm all ound gap to be provided between te pipe and the core applying non shrink ixctropie mortar SkaMonotop 122 Fand Skagurd 694 F) apply. 63 [Goving Proving and Applying at he Junction of slab and vertical oes with Cement Marat 18 and edied wi - sia atex Power at dosage of litre por SOkg coment. [aterarooting catia: SupoW & apolcation ofa two-component sync palin modified mortar with = lelongation of 120%, crack biden aby of>2-5mm & 2 bond strength to concrete more than 1.3 Mpa called ik |ropses! 309 Mi in two coats. The coating shal be carried out in two coats @ a coverage of 1.6 k/sqn/coat. The two coats shall be in opposite directions to eachother with a brush or aller. The area once coated shal be ready to take ine protection seed onthe heizotal surface and plaster on the vertical surface 65 JPROTECTIVE SCREED: The costo surface shallbe protected with a 7Smm tick creed with grade as pe the desen requirement, maintaining slope of in 100 or a5 pe drawing. The screed that shale nid is admixed with Sika Jolstocrete plus an Integral waterproofing admixture @ dosoge of 250 gms per SO kg cement. The curing shal be |done a ora minimum of 7d Protection plaster (vertical surface [substrate Condition & Surface Preparation = [a substrates, whether new or ld, must be sod clean using cing and grinding, dry and free of al races of ol, ease, old pat, ust, mould and any other material which could affect adhesion, 1a [construction Joint eatment after construction Al the construction joints needs tobe groove cut unto amin depth a width of25m25mrn. The groove shall be cleaned fre from dust ote parties and any eter flaky material which restricts the bonding ofthe new system to the old concrete. Then the groove is also cleaned with water and once the lercove sin SSE condi, saewell A 2010 a medium strength (40 Ma), shrinkage-compensate, oe-einforced, thixotropic mortar of 3 category of EM 15043 shall be filed ght completely into the groove. Al the Joints once leat in this manner shal be ready fr coating aftr 48h. 73 [Bore Packing: Proving and laying ofthe svikage compensated thikatropic mortar forthe pipe ct outs a ran foutet & bare packings. The pipes to be fied shouldbe profiled rough to provide proper bond andthe same to be [signed Minimum of 2025 mm al-ound gap tobe provided between the pipe and the core applying non shrink hnxotropic mortar sikaMonotop 122 and Shagurd 634 F) apy. od INozle Grouting necting cement slurry with NSG compound by oessure grouting on RCC rat alter 8 day wing lx2mm da, 75 mm lang PYC/GI noszes 1.0m CIC nthe concrete sealing the nozzes with the quick set compound. Era Jnozles ae tobe provided along the construction joint. Grouting at pressure of 2-3 ky m2 through the nozal with coment sks intrapus EP slury adrined with 05 ky cement bag. 75| [coving Providing ac Applying 3 the junction of sab and vertical offsets with Cement Mortar 14 and awed wih sia Latex Power SOR at dosage oF tre per SOkg coment. (coment and sand shal be supote bythe cent) [eming- Supply and aplication of coat of Wwecomponent ska floor 161NC epory primer wih ilers using a smoot) meta trowel or spreader, made from slven-re epoxy resin called Prim SN and uke with dry quart sand of losmm, required, at ratio of upto 10.5 and applying it @ 0.5.0.7 ka/sqm according to the surrounding lempersture, depending onthe surface absorbtion moisture must be below 4%. [Waterproofing coating Supply and application of two-component, solvent fee, Pure Pourea membrane caled skalastic #S3R AP, with immediate permeabllty and rapid sett foot ttf for waterproofing fat roofs. Aly a2 rm hick ayer of the product @ 2.2eg/sqm with ahh pressure, bimixerindustral spray gun with low and temperature control, tes with a sel-300%, Tensile strength of °20 N/mm? and Tear resitanc of 80 N/mm, Shore Hardness (A) of 90 oF more and quick reaction of product when applied By orey el lime at +70°C< 6 seconds moisture must be below 8%. "W Jerotection Screed (HrizontalSuerface) Protection Sered Concrete using M20 Grade Screed Concrete using 12mm down size jelly sloping towards downtake Poe. Addtive Ska plastocrete plus @ Dosage of250gms/838 of cement. Thickness SOmm average thickness 18 Protection plaster (vertical surface) Protection Pacter over potyrestuace wil not bond so at the time of construction of RCC te swimming poo wall rust ben ine lable,

You might also like