You are on page 1of 1

Work Breakdown Structure (WBS)

Project Name: Project GreenThumb


Project Manager: Alex Thompson
Date: 11.08.2023
Project
GreenThumb

Project Equipment System Design Installation and Reporting and


Initiation and Procurement Testing Documentation
Planning

Define Project Identify Create Detailed Install Irrigation Collect Water


Scope and Equipment Design Plan Components in Consumption
Objectives Needs Parks Data

(Develop Project Ensure Timely Collaborate with Conduct Initial Prepare Project
Plan and Delivery Project Engineer Testing Reports
Timeline

Allocate Budget Plan Automation Adjust and Document


and Resources Features Optimize System System
Performance

You might also like