Quality Management system – System Life Cycle
Processes for any Project
guru
CIVIL CONSTRUCTION
Comments
PROJECT NAME:
Quality Management system – System Life Cycle Proce
Monitor
Initiat Executin ing & Closi
ing Planning g Control g
Proce Processes Process ling Proc
ss es Proces ses
s
Award of Receive Contract Review Negotiate Scope Signing
Contract Letter of against Tender terms of Change Contrac
Contract Documents conditions Control Agreem
and final
agreement
Agree Scope
Requirements
award
& any
Variations
Finalize
Technical
clarification
Finalize Bill of
Quantities
Site
Possession
Tender Asses
Progress & Progres
Stage Activity project
Productivity Producti
Const. Definition Performanc
Measurement y Repor
Program e
2
Analyze
Activity Subcontractor
Project
Resource program Co-
performanc
Estimate ordination
e
Activity Duration
Estimate
Constructi Project
Receive Scope &
on Construction Start Comple
Tender & Productivity
Managem Schedules Mobilization & Hand
Contract Control
ent over
Comple
Documen Scope Change Control Site
Milestone of Snag
ts Management Resource
Items
Establish Const.
Detailed Const. Substan
Production Progress
Program Comple
Systems Reporting
Control
3 – Monthly Final
Site Logistics Safety
Const. Schedule Comple
Measures
Management
Systems
of Control
Weekly look Testing
Subcontractor Product
ahead Commis
s and Quality
ning
coordination
3
& Const. Process
Inputs ( FM –
D35 )
Prepare Method
Statements
Quality Study
Managem and
ent analysis
Issue Systems Client Correcti
of System Planning
Documents Satisfaction Action
contract
Requirem
ents
Conduct
Prepare Quality Systems Internal Preventi
Plan Implementati Audits Action
on Program
Monitoring
Commence
Prepare PM &
System
systems Measureme
Implementati
Procedrues nt of
on
Product
Monitoring
Define
&
Contractual System
Measureme
responsibnilites Maintenance
nt of
& authorities
Processes
Quality Control of
Resources Non-
4
conforming
Planning
Product
Analysis of
Data
Resources Re-
Managem allocatio
ent – of
Tender Acquisition of
Constructi Manpower/Labo Status Resourc
Stage planned
on r Histograms Reporting on
Proposal resources
comple
of the
Project
Provide
Organization Time
resource
chart Keeping
infrastructure
Establish
Performanc
Responsibilities Establish
e
& Authorities training needs
Evaluation
(RACSI)
Manage Non-
personnel
resources
Allocate
resources to
activities
5
Maintain
Resources
Manage
conflicts
Define format
and media for
capture
Identify valid
source of
information
Establish
Document &
Data Control
system
Establish DC
distribution
Matrix
Establish
Contract
6
coordination
matrix
Review Subcontract
Prepare & Subcon
Condition Procurement Agreement
Issue Bid tors Fin
s of Planning – administrati
Packages Paymen
Contract on
Tender
Evaluation & Control
Stage a)
Selection of S/ Procuremen
Quotatio Subcontractors
C t Schedule
ns
Subcontract /
Suppliers Control
b) Materials Approval – Procuremen
Procureme Prequalificatio t Budget
nt n
Managem
Product &
ent Subcontract
Processes
Agreement –
Quality
Orders
Control
Performanc
e Reporting
Supplier /
Subcontract
ors
Performanc
e Evaluation
7
Shop- Design
Planning
drawings Changes Drawing
Docume
Receive Control handing
Shop-drawings – Request Form
Tender & Engineering over
Including Information
Contract Schedule
Control
Technical MEP Status of
Submittals Coordination Technical
g
Submittals
Managem
ent
Perform QA
Configuration
a) Materials on
Management
Submittals
Technical
Document
Submittals &
b) Documents & Data
coordination
Control
for approval
Configuration
Management
8
{Payment
Certificates} Cash flow out Rep
MAR – SC
Establish
Cost Control
Cost Estimation Contract
&
& Budgeting Administratio
Reporting
n procedure
Valuation &
Control
Claims
Quantities
Management
Risk
Risk
Monitoring
Management
& Control
Requisition – Receiving
Transfe
Placing Inspection
Materia
Orders & Testing
Inventory /
Receipt of
Stock
Materials
Control
Materials Inventory
9
Status
Issuance
Reporting
Materials
Transfer to
other sites
Control Demob
Mobilize Site
Site Offices Consumable Site
Facilities
Definition Materials Facilitie
Site
of Site
Administra Control
Requirem
tion Facilities Labor Camps Camp
ents
Welfare
Computers – IT
Mobilize Plant
/ Equipment
Control Demob
Plant Plant Equipment Install Plant /
Maintenanc Plant /
Schedule Schedule Equipment
Plant e Program Equipm
Equipment
Maintenance Perform Demob
Program Maintenance Formwo
Formwork
Design
Updated: November 23, 2016 — 2:31 pm
← Previous Post
Next Post →
Leave a Reply
Top of Form
Your email address will not be published. Required fields are marked *
10
Comment
Name *
Email *
Website
Notify me of follow-up comments by email.
Notify me of new posts by email.
Bottom of Form
The Search Box
Top of Form
Bottom of Form
Recent Posts
1. CONSTRUCTION MACHINERIES, EQUIPMENTS AND INSTRUMENTS / HANDLING AND
MAINTANANCE
Recent Comments
Meta
1. Register
2. Log in
3. Entries RSS
4. Comments RSS
5. WordPress.org
11