Unikom - Winni Octaviyani Djohar - Jurnal Dalam Bahasa Inggris
Unikom - Winni Octaviyani Djohar - Jurnal Dalam Bahasa Inggris
No Symbol Definition
1 Project
activity
Figure 1. Research method
2 Event at
project work
1.3. Information Systems
The system is a collection of several elements that
work together to solve a problem. These elements can 3 Dummy
be conventional systems (data, people, and Activity
procedures) and modern system elements (data,
people, procedures, hardware, and software).
For calculations, there will be three
Information is the result of processing data that has a
calculations, namely the count forward, countdown
form that is beneficial for the recipient to make
and total float.
decisions.
1. Forward Pass
Based on the previous understanding, it can be
This calculation starts from the Initial Event to
concluded that the information system is a component
the Terminal Event to calculate the completion time
in the form of data, people and software that work
of the activity (EF), the fastest time the activity is
together to solve a problem and produce information
carried out (ES). Forward pass rules as follows:
that will be used to solve a problem and support
a. The time for a new activity can start if the
business activities in an organization. [2]
predecessor activity has been completed
except for the initial activity.
1.4. Project Management
b. The earliest finish time for an activity is the
Based on the previous understanding, it can be same as the initial start time, plus the time
concluded that the information system is a component period of the activity that preceded it. The
in the form of data, people and software that work equations for advanced calculations can be
together to solve a problem and produce information seen in 1
EF(i − j) = ES(i − j) + D(i − j) (1)
TYPE OF
ID RISK
RISK
The schedule is not
R1
according to plan
Estimation Costs not according to
R2
budget plan
R3 Increase in material prices
Cost Sched
CV= ule
R10 work safety, one of which uses physical CPI= ule ETC EAC
EV- SV=E
security equipment. EV/P SPI=E (Rp.) (Rp.)
AC V-PV
V V/AC
(Rp.) (Rp.)
2.13
1.161.2 1.171.1
1 8.55 - 1.217 1.000
2.4. Project Control Analysis 75.782 13.133
4
1.28
2.5.1. Calculation of Work Weight 1.036.0 1.039.5
2 3.13 - 1.372 1.000
The calculation of work weight is calculated 54.250 08.016
3
based on the unit price of the work in accordance with 1.28
1.036.0 1.039.5
the contract value and does not include VAT of 10%. 3 3.13 - 1.372 1.000
54.250 08.016
Details of the weight calculation results for each job 3
1.71
can be seen in Table 10. 4 0.84 - 1.027 1.000
1.324.5 1.388.6
52.676 23.257
4
1.71 Use cases can be seen in Figure 4.
1.324.5 1.388.6
5 0.84 - 1.027 1.000
52.676 23.257
4
1.56
1.302.4 1.404.0
6 8.27 0 1.015 1.000
39.866 28.216
3
-
997. 1.321.4 1.409.7
7 13.82 1.011 0.866
992 45.240 74.553
9.319
1.56 -
1.306.9 1.402.7
8 8.27 5.859. 1.016 0.943
94.160 22.871
3 639
1.85
5.859. 1.294.3 1.401.4
9 3.41 1.017 1.057
639 01.349 64.198
4
3.13
1 1.282.3 1.382.3
6.54 - 1.031 1.000
0 33.411 53.488
6
1.56 -
1 1.329.4 1.389.3
8.27 8.126. 1.026 0.883
1 26.227 31.097
3 507
1.71
1 1.322.7 1.390.6
0.84 - 1.025 1.000
2 68.636 57.442
4
1.28
1 8.126. 1.325.7 1.402.1
3.13 1.017 1.117 Figure 4. Use case diagram
3 507 23.879 66.903
3
1.85
1 13.82 1.314.2 1.392.8 2.6. Interface Design
3.41 1.024 1.207
4 9.319 10.684 92.062
4 An example of interface design can be seen in
2.28
1
1.12 - 1.072 1.000
1.298.1 1.329.8 Figure 5.
5 75.521 09.018
5
2.28
1 1.298.1 1.329.8
1.12 - 1.072 1.000
6 75.521 09.018
5
2.28
1 1.298.1 1.329.8
1.12 - 1.072 1.000
7 75.521 09.018
5
1.99
1 1.306.8 1.336.8
5.98 - 1.066 1.000
8 10.512 36.529
4
1.99
1 1.306.8 1.336.8
5.98 - 1.066 1.000
9 10.512 36.529
4
2
2.28
1.311.1 1.380.0
Figure 5. scheduling interface design
1.12 - 1.033 1.000
0 08.434 23.350
5
2.28 2.7. Testing Conclusion
2 1.311.1 1.380.0
1.12 - 1.033 1.000 2.7.1. Black Box Testing Conclusions
1 08.434 23.350
5 Software testing uses the black box method. Tests
2.13
2
8.55 - 1.046 1.000
1.316.5 1.363.2 carried out by providing test data that is right and
2 78.235 93.768 wrong then see the truth of the output results. [10]
4
2
2.42
1.260.5 1.282.2
Based on the results of the black box testing system
3.69 - 1.112 1.000 that has been carried out as a whole it is concluded
3 94.814 60.746
5
2.42
that the process that occurs in the project time
2 1.260.5 1.282.2 management information system using the critical
3.69 - 1.112 1.000
4 94.814 60.746
5 path method at PT. Matrix Primatama is correct and
2.56 as expected. Display an error message, a warning is
2 1.258.8 1.281.6
6.26 - 1.112 1.000 quite maximal and functionally the system built can
5 08.393 38.650
5
2.56 produce an expected output.
2 1.258.8 1.281.6 2.7.2. Conclusion of Beta Testing
6.26 - 1.112 1.000
6 08.393 38.650
5 Based on the results of beta testing, it can be
2.56 concluded that the project time management
2 1.258.8 1.281.6
6.26 - 1.112 1.000
7
5
08.393 38.650 information system uses the critical path method at
PT. Matrix Primatama is in accordance with the
expected goals.
1. The project time management information system
2.5. Functional Requirements Analysis
built has helped monitor scheduling, manage
2.5.1. Use Case Diagram
evaluation data with recommended costs and time [6] Sufa'Atin, “Implementasi Probability Impact
per week and control risk. Matriks (PIM) untuk mengidentifikasi
2. The project time management information system kemungkinan dan dampak risiko proyek,” vol.
that was built can help to schedule and make VIII, p. 44, 2017.
project progress reports. [7] T. H. Jesaya Hasadungan, “Sistem Informasi
3. The project time management information system Manajemen Proyek di CV RIAPRIMA PUTRI
that was built can already help to create a project AMBAR,” 2016.
RAB.
4. The project time management information system [8] Sufa'atin, “Penerapan Metode Earned Value
that was built can assist the administration to Management (EVM) dalam Pengendalian
manage project data. Biaya Proyek,” pp. 315-320, 2017.
5. The project management information system that [9] R. Miles dan K. Hamilton, Learning UML 2.0:
was built can help the admin to manage user data. A Pragmatic Introduction to UML, Sebastopol,
CA: O'Reilly Media, 2006.
[10] L.Williams, “Testing Overview and Black-Box
3. CLOSING Testing Techniques,” pp. 34-35, 2006.
3.1. Conclusion
Based on the results obtained in the final project
research that has been done, it can be concluded that:
1. The project time management information system
that was built can help the project manager determine
the focus of the work by providing information on
which jobs can be postponed and cannot be
postponed..
2. The project time management information system
that has been built can assist the project manager in
evaluating project costs and time which will be a
reference for controlling time and costs.
3. The project time management information system
that has been built can assist the project manager in
carrying out risk control by preparing the handling to
be carried out from the identification of risks in
accordance with the level of risk and the influence of
risks that can be a reference for risk control.
3.2. Suggestion
Based on the results that have been done on the
project time management information system using
the critical path method at PT. Matrix Primatama
obtained advice, namely the need for development
and maintenance in accordance with the needs for the
future.
BIBLIOGRAPHY
[1] P. D. Sugiyono, Metode Penelitian Kombinasi,
Yogyakarta: alfabeta, 2015.
[2] I. d. W. A.Yulianto, Analisis dan Desain Sistem
Informasi, Bandung: Politeknik Telkom, 2009.
[3] A. Husein, Manajemen Proyek, Yogyakarta:
Andi Offset, 2011.
[4] I. Widiasanti dan L. , Manajemen Konstruksi,
Bandung: PT. Remaja Rosdakarya, 2013.
[5] P. M. Institute, PMBOK A Guide to the Project
Management Body of Knowledge Fifth
Edition, USA: Project Management Institute,
Inc., 2013.