9/21/2023(Thursday)

Activities

1. MDX-L12M (intermitted dc power fault).

Update and Delivered 2 Unit


Assessment
9/21/2023(Thursday)

Remarks

(i). Clean the Main Breaker with sand paper. "(mentor by Hor Chan KoK)"
(ii). Clean the Relay Module 5A,24V and after cleaning the relay tested.
(iii). Cable take out. IGBT Check.
(iv). Unit testing steps by steps.
(v). Calibration Process. Check Vtg and Current by using RF calibrator.
(vi). Checked the "ON" and "OFF" time cycle.
(vii). Disassemble the unit and prepared wrap with Kash.

(GHW-50A), (MDX-L12M)