Sr.
No Question Answer
Irradiance is-
8. a) Measured in sun hours per day
b) Measure in Watts
c) Measured in watts per square meter
As per Shams Dubai standard, the component that shall include the ability to receive
signals with protocol IEC 61850, finalised to remote tripping:
9. a) Interface Protection unit
b) Solar Generation Smart meter
c) Solar Combiner box
10. Perimeter roof-edge protections systems help in:
a) Against danger of cut due to sharp edge
b) Against danger of fall from height
c) Against danger of electric shock
When dealing with testing and inspection of photovoltaic plants it should always be
reminded that even if opening all dc and ac switches/fuses:
11. a) DC voltage is always present in the day light
b) DC current is always present in the day light
c) No hazard present
PV modules with Voc more than 40V each, under sunlight with connection of 20 panels in
12. series. Which safety practice is required before doing maintenance electrically:
a) First disconnect DC breaker
b) First disconnect the plug in connector of the 10th solar module in the string
c) First disconnect the string fuse
With LVRT it is meant:-
a) The ability of the inverter to ride through for a fault in the network
13. b) The ability of the inverter to rapidly disconnect for a fault in the network
c) None of the above
14. During maintenance or installation of a PV array, assuming any part touched is live
confirm who is safe among below people (Dashed line indicate multiple modules in
series):
Confidential Page 2 of 2