ESHER
EMR A
LHe
Guideline for
Periodic Inspection,
Testing and Certification
(PITC) Work
CL we
RD)
Fs)REMEM Ril MSALBAR
FRHEMAOOR AY
EBEALIE
Low voltage electrical
‘work not exceeding ARS
400A BEALE
Low voltage electrical
‘work of any capacity
FRR 250030H0
BEALE
Low voltage electrical
‘work not exceeding
25004
REPS tee
Arrange power suspension *notes. wane | @) Fe
Tica EMRE RUE
1 RRBRALRARMBARS BR DER AR DRED
NORDRR ERSS LASERS ARETE
BNL ROME HAZE «
2 R201 2A ARTE ee PRE AS
Se NS «PPE APA EN
EZ LAR se =
3 dhs PRAHA SAANMASTRCRARER EMO AUS Ra
WRAAMRE - REVRAMRAMTRADRHAE HETAAME ERA PERE
BRM » LOREAL HAR Ee ERE °
*Notes : Power Suspension Arrangement fer PITC Work
1 In order to ensure personal safety of the electrical workers and avoid affecting building
power supply in case of electrical accident, the power company's electricity supply
shall be cut off in carrying out PITC work on main switchboard that is connected to
power company’s transformer.
2. For WR2 submission Involving the above-mentioned main switchboard on or after
1 December 2011, the power company’s record for temporary disconnection of
electricity supply shall also be submitted for EMSD's vetting.
3 Furthermore, as the temperary disconnection of power company's electricity supply
will affect the building users for a short period of time, the Registered Electrical
Contractor shall also closely collaborate with the building owners, Incorporated
‘Owners and properiy management companies to work out the power suspension
‘arrangement and temporary measures that meet the building operational needs with
the aim to minimizing disturbance to the building users resulting from the PITC work.EMRASARE
PITC Work for Distribution Circuit
‘sual inspection
32 AeLMRiCIE AS
Continuity test for protectve conductors
38 AUER MIMO AREA,
Continuity teat for ring final
luctors
Soul cond
34 SmRRa
} Insdation resstance test
tt ~ 35 SHER
Polarity test:
36 Sem RES
Earth elactode reistanca est
37 SEA
Earth fault loop impedance test
(| 22 Ramen
Functonal est for protective vicesCULCCECCEL
PITC Work for Low Voltage Switchboard
44
42
43.
44
45
46
AZ
48
VkEwe
fame
Isolation and proved dead
aR
Cleaning
BRE
Visual inspection
STARS
‘Contact resistance test
Be Saws
Insulation resistance test
RROLAAR
Secondary injection test
PRR E HEAT BE
Functional test for protective devices
RRR ET
Check indication devicessuet ila ae
Record all inspection and
testing results.
aahS
Resume powerRe Ae BAB Al ace
Issue periodic test certificate and
testing records
MERARE wAiMstieRR Ba
eee Testing Record Checklist
Schematic
diagram
EREPAAE AS RAAT eS Les
Submit periodic test certificate and testing records for
EMSD's endorsement
S040) wetes
Beamon
Electricity Legislation Division
Electrical and Mechanical Services Department
3 Kai Shing Steet, Kowtoon, Hong Kong
FES Tal 1829 (BH Fax: (852) 2995 4929
BRE Website: wan emad gok hc
FE Ernallinfo@emsd.gouhk