Crank Pulley marking 60A 60 Fitment of Crank pulley, Oil sump & 43
Masking of Engines Exhaust side Wiring of
Bumping clearance check 0 530 Engine/Breather pipe fitment
Fitment of Leak off pipe, HP pipes, 47 Final Painting Gear & Starter end side Passing
100 570
rocker cover & Engine unloading 0
Compressor S/A, Alternator Fitment of Oil filter, Starter, Air 48 Demasking of Engine 580 FIP & Flywheel end side Passing
S/A 110A 110 cleaner bracket, Alternator, Oil drain 0
pipe, Diffuser support bracket, CAC
pipe, Compressor & 'V' belt
Symbol Description
Storage
Operation
Flow
Inspection
Decision making
Delay
Man
Machine Method Environment (Process Parameter)
Material ( Indirect) :
OUTPUT
INPUT
Unintended
Output
Process Function & Product Requirements to the product: Impact of changed Product General Process
Characteristics/ Requirements (Interface to Design) Characteristics Requirements
Subsystem: 20
System: 30
40
50
60
110A
Structure Analysis (P2)
2.Process Steps 3.Process Work Element
Station number and Name of Focus element Man,Machine,Material Environment etc.
Man - :
Machine-
Method- :
Material- :
Environment:
Man - :
Machine- :
Method- :
Material- :
Environment:
Man - :
Machine- :
Method-:
Material- :
Environment: