Contents:
2.0 Components
2.1 Parts in the components
2.0 Components
U
HIAB BOSS system "Components" Appendix 1
Spool indicator
5/6
Spool switch
Dump valve
4
1
Control box I
2
Control box II
3
Pressure transducer
12/24 V DC
23.02.96
Pos. 1 Control box I, which is situated near the crane control valve.
Pos. 2 Control box II, which is situated near the cross control handles.
Control box II is only fitted to cranes with cross control.
Pos. 4 Dump valve, which is installed on the control valve (only PTO
driven cranes).
5
3 2
4
Pos. 3 Buzzer.
Control box II, which is an extra box for cranes which are controlled from both
sides of the vehicle, consist of the following main parts:
2
1
3 2
4
Pos. 3 Buzzer.
The dump valve, which has two different executions, which is the build in type
and the external type.
Pos. 1 Solenoid.
1
2
Spool indicators/spool switches are mounted onto the inner boom and the
extension valve sections on the control valve.
Spool indicator
Spool switch
Spool switch
3.1.1. Start the truck and engage the PTO pump, or switch on the main switch for the
12/24V power pack.
3.1.2. Start the crane by pressing the on/off button on one of the control boxes.
3.1.3. The crane can now be operated normally until 90 % of maximum pressure is
reached in the inner boom cylinder. When the capacity exceed 90 % the nine
red signal lamps will flash intermittent and the buzzer will buzz intermittent.
3.1.4. If the load on the crane reaches maximum capacity, the nine red lamps will
light constantly and the buzzer will buzz constantly.
3.1.6. To move the crane out of this locked position, you can now choose
between the following alternatives:
A. Retract the extension cylinder.
B. Lower or raise the inner boom. This can only be done with
within approx. 105 % of the normal capacity, and it can only be
done at a very slow speed.
C. Press the release button and move the crane in any direction
(extending the extension cylinder is not possible) for a period
of five seconds (no more is possible). This operation can be
repeated after thirty seconds.
3.1.7 When the job is finished, stop the crane by pressing the
on/off button. Switch off the 12/24V power pack or disengage
the PTO pump.
OR
OR
OR
OR
RELAY
OR
OR
OR MOUNTING DESCRIPTION
HIAB STIFF-BOOM WITH
ELECTRICAL POWERPACK
CABLES FROM BOSS
U
HIAB
OR
OR
OR
NOTE!
EXTEN LIFT OR
OR OR
12 OR 24 V DC
OR
MOUNTING DESCRIPTION
HIAB STIFF-BOOM
PTO
U
BLUE + BLACK TERMINALS IS OLP FUNCTION
PRESSURE SENSOR
HIAB
BROWN + YELLOW/GREEN IS ROPE END FUNCTION
1
DUMP-VALVE
OR
OR OR
3
4 3 2 1
OR OR 1 OR OR OR OR
12 OR 24 V DC
OR OR
2 OR
OR OR OR 2 OR
4
54 3 2 1 54 3 2 1
WINCH BOX
24 V DC
EXTEN
1 OR
WINCH
2 OR 3 OR EXTEN LIFT
OR OR OR OR
WINCH
2 1
WINCH
LIFT
DRAINHOLE DOWNWARDS
BOSS MK 2.1
WIRE CONNECTING DIAGRAM
HIAB 027/035/045/052
WINCH
U
BLUE + BLACK TERMINALS IS OLP FUNCTION
BROWN + YELLOW/GREEN IS ROPE END FUNCTION PRESSURE SENSOR HIAB
DUMP-VALVE
OR
OR 12 OR 24 V DC
OR
OR
OR
OR
WINCH BOX
24 V DC
OR OR
EXTEN WINCH
WINCH
LIFT
DRAINHOLE DOWNWARDS
HIAB
1
OR
2
OR
COLUMN
SEEN FROM ABOVE
OR
3
OR
4
CLOCKWISE SENSOR
OR
4 3 2 1
OR OR OR OR
12 OR 24 V DC
OR OR
OR
54 3 2 1 54 3 2 1
LIFT
SLEWING
1 OR EXTEN
2 OR 3 OR EXTEN
SLEWING
DRAINHOLE DOWNWARDS
LIFT
BOSS MK 2.1
WIRE CONNECTING DIAGRAM
HIAB 027/035/045/052
OLP STABILITY
U
HIAB
OR
12 OR 24 V DC
OR OR
OR
NOTE!
54 3 2 1 54 3 2 1
1 OR
NOTE!
EXTEN
2 OR
EXTEN LIFT
3 OR OR
LIFT
DRAINHOLE DOWNWARDS
BOSS MK 2.1
WIRE CONNECTING DIAGRAM
HIAB 027/035/045/052
U
HIAB
OR
12 OR 24 V DC
OR OR
OR
NOTE!
54 3 2 1 54 3 2 1
NOTE!
EXTEN
LIFT
DRAINHOLE DOWNWARDS
HIAB 027/035
U
HIAB
OR
12 OR 24 V DC
OR OR OR
OR NOTE!
OR
NOTE!
NOTE!
DRAINHOLE FORWARDS
EXTEN
LIFT
HIAB 022/027/032/035 LT
U
5.0 Adjustment of BOSS MK II system.
HIAB
The system has 2 multi-turn adjustments, where only"P" is in use (the"A"is a spare one for
additional functions).
Both are situated in the metal box close to the terminals 28 and 29.
Since the 90 % level automaticly follows the OLP level there is only one adjustment nessesary,
that is the OLP level (100 % ).
The multi-turn adjustment to be turned is the"P" which is farest away from the emergency stop
switch.
ADJUSTMENT:
There are two ways in which the system can be adjusted:
1) Exactly as the BOSS MK I system, that is by loading the crane and turning the
adjustment slowly until the OLP cuts you off.
2) When connecting the external power cable to the main box press the on/off button
simultanuously. This places the system in “adjustment mode”
removing all filters anddampers. This makes it possible
to adjust the system very exactly. After finishing
the adjustment just disconnect the power cable
and connect again. This brings the system back
to normal mode.
SELF TEST:
When the system is switched on it is automaticly
testing itself to see if there are any missing or faulty functions.
If there is any faults, the system will not start, and there is a quick intermittent warning
signal.
TEST FUNCTIONS:
If there is a fault on the system, it can easilly be located in the following way:
1) Press the emergency button.
2) Press or move any function containing switches or indicators (Including ON/OFF button)
The system will now make a quick “beep” when the function is activated/deactivated, if
the function is without faults.
RELEASE FUNCTION:
When using this function the crane can be operated in 5 sec. (Except function “extension out”)
The release function can only be used once. After that the operator has to wait 30 sec. if it is
nessesary to use the function a second time. During the waiting time the light in the green LED is
cut off to indicate that the crane can not be operated.
Green light
Less than 90 %
of
Max Load
23.02.96
= Possible to move in that direction for
5 sec.
HIAB BOSS system "90 % Load Position" Appendix 3
Buzz!Buzz!
90 %
of
Max Load
23.02.96
= Possible to move in that direction for
5 sec.
HIAB BOSS system "Max Load Position" Appendix 4
Constant Buzz !
Max Load
23.02.96
= Possible to move in that direction for
5 sec.
HIAB BOSS system "Release Position" Appendix 5
Buzz!Buzz!
Max Load
23.02.96
= Possible to move in that direction for
5 sec.
U
HIAB
BOSS MK 2.1
El sistema HIAB BOSS MK 2.1 es el nuevo desarrollo del sistema HIAB BOSS
MK 2. Para las instalaciones estándar no habrá diferencia en el sistema de control
ni en los diseños de las cajas, etc. comparándolas con los sistemas HIAB BOSS
MK 2.
Fusible
Página 1 of 3
- Los sensores de corredera han sido rediseñados, son finales de carrera axiales
en las grúas articuladas y radiales en las grúas de brazo rigido.
Página 2 of 3
Tipo externo
Página 3 of 3