With the help of Open Access Mechanism, Industrial Consumers (ICs) can procure
electricity from source of their choiceinstead of their existing supplier/distributor. (e.g.
UGVCL/ MGVCL/ DGVCL/ PGVCL) to save purchase cost of electricity.
No need to establish fresh transmission lines for this purpose, power flow will be from
same lines as existing lines from which ICs are receiving power. ICs will pay
transmission charges for use of these established transmission lines.
Best possible options as per current market scenario for Power Procurement are as
follows (For Gujarat)
→ ABT Meter ~Rs 5.5 lakh (Main and Check for 11kV & 66kV)
→ CT/PT unit ~Rs 1.75 lakh (for 11kV)
→ RTU Installation expenditure ~Rs.5.5 lakhs (for 66 kV and above Connectivity)