You are on page 1of 7

Hydrological Survey Works for Engineering

Services for Jakarta Mass Rapid Transit


(MRT) East-West Line Project (Phase 1)

APPROVAL SHEET ................................................................................................................. ii


FOREWORD ............................................................................................................................. iii
TABLE OF CONTENTS ............................................................................................................ iv
LIST OF FIGURES.................................................................................................................... vi
LIST OF TABLES ..................................................................................................................... viii
CHAPTER 1. INTRODUCTION ............................................................................................. 1-1
1.1. Understanding of Work .......................................................................... 1-1
1.1.1 Objectives ............................................................................... 1-1
1.1.2 Scope of Work ........................................................................ 1-1
1.1.3 Location Work Area ................................................................ 1-1
1.1.4 Standards and Design Criteria ................................................ 1-4
1.1.5 Work Days .............................................................................. 1-5
1.2. Overview on The Outline of Report ........................................................ 1-6
CHAPTER 2. HYDROLOGICAL SURVEY WORKS.............................................................. 2-1
2.1. SCOPE OF WORK ................................................................................ 2-1
2.1.1 Preparatory Work.................................................................... 2-1
2.1.2 Survey of Historical Flood Record .......................................... 2-1
2.1.3 Study of Probable Flood Water Lavel ..................................... 2-8
2.1.4 Summarization of Drainage System ....................................... 2 - 14
2.1.5 Study of Probable Water Level ............................................... 2 - 51
2.1.6 Survey of River Cross Section (Cideng River, BKB River ....... 2 - 59
and BKT River)
2.1.7 Rainfall Data ........................................................................... 2 - 86
2.2. EXPECTED OUTPUTS ......................................................................... 2 - 90
2.2.1 Survey of Historical Flood Record .......................................... 2 - 90
2.2.2 Study of Probable Flood Water Level ..................................... 2 - 91
2.2.3 Summarization of Drainage System ....................................... 2 - 91
2.2.4 Study of Probable Water Level in Cideng River, Banjir ........... 2 - 91
Kanal Barat River, and Banjir Kanal Timur (BKT) River
CHAPTER 3. AN OVERVIEW OF GIS SYSTEM IN THE MRT PROJECT ........................... 3-1
3.1. Terminology of Geographic Information System (GIS) .......................... 3-1
3.1.1. Introduction to GIS .................................................................. 3-1
3.1.2. How GIS Works ...................................................................... 3-6
3.2. Implementation GIS in the MRT Project................................................. 3 - 17
3.2.1. Data Collection ....................................................................... 3 - 17
3.2.2. Data Processing ..................................................................... 3 - 25
3.3. Manual for Application GIS .................................................................... 3 - 76

CHAPTER 4. STUDY OF PROBABLE WATER LEVELS .............................................. 4-1


4.1. STUDY OF PROBABLE WATER LEVELS ............................................ 4-1
4.1.1. Scenario of Simulation Model ................................................. 4-1
4.1.2. Methodology of the Study of Possible Water Levels ............... 4-1
4.1.3. Data Used For Model.............................................................. 4-2
4.2. Hydrologic and Hydraulic Model For Flood Analysis .............................. 4-4
4.2.1. Hydrologic Model .................................................................... 4-4

Table of Contents - 1
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

4.2.2. Hydraulic Model ...................................................................... 4 - 11


4.2.3. Calibration Model .................................................................... 4 - 22
CHAPTER 5. NEXT WORK PLAN ........................................................................................ 5-1
5.1. Work Plan .............................................................................................. 5-1
5.2. Schedule For Submitting Reports .......................................................... 5-3
APPENDIX :
Appendix 1. Rainfall Data
Appendix 2. Historical Flood Record Survey :
a. Certificate Of Work Implementation
b. Tabel of Content Historical Flood Record
c. Drawing
d. Tabulation of Data Based on Survey Result
Appendix 3. MOM Weekly Meeting dan Documentation

Table of Contents - 2
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

Figure 1.1. Location Map Of Entire Section Of Jakarta MRT East-west Line ..................... 1-2
Figure 1.2. Station Location of Stage 1 of Phase 1 of MRT E-W Line................................ 1-3
Figure 1.3. River Line Survey on Banjir Kanal Timur (BKT) Floodway ............................... 1-4
Figure 1.4. River Line Survey on Banjir Kanal Barat (BKB) Floodway ............................... 1-4
Figure 1.5. River Line Survey on Cideng River .................................................................. 1-4
Figure 2.1. Survey Radius Boundary Example .................................................................. 2-3
Figure 2.2. Example of a Historical Map of the Highest Water Level ................................. 2-5
Figure 2.3. Documentation of Inundation Survey Implementation ...................................... 2-7
Figure 2.4. Illustration of Tidal Observation Board ............................................................. 2-9
Figure 2.5. Map of Countour Land Subsidence Measurement Results With GPS ............. 2 - 13
Figure 2.6. DKI Jakarta PHB Channels System (Connection Channels) ........................... 2 - 15
Figure 2.7. Map of PHB Channels, Grogol Petamburan District, West Jakarta City........... 2 - 17
Figure 2.8. Map of PHB Channels, Kebon Jeruk District, West Jakarta City ...................... 2 - 18
Figure 2.9. Map of PHB Channels, Pulogadung District, East Jakarta City ........................ 2 - 19
Figure 2.10. Map of PHB Channels, Kelapa Gading District, North Jakarta City ................. 2 - 20
Figure 2.11. Map of PHB Channels, Gambir District, Central Jakarta City ........................... 2 - 21
Figure 2.12. Map of Micro Drainage in DKI Jakarta ............................................................. 2 - 22
Figure 2.13. NEDECO Masterplan 1973 .............................................................................. 2 - 31
Figure 2.14. JICA Masterplan 1997...................................................................................... 2 - 31
Figure 2.15. NEDECO and JICA Masterplan Scheme ......................................................... 2 - 32
Figure 2.16. Schematics of Jakarta Flood Control System .................................................. 2 - 34
Figure 2.17. River Dynamics From Upstream to Downstream and Related to the ............... 2 - 36
Ciliwung River
Figure 2.18. Calibration Results and Simulation of Hecras Model for Ciliwung .................... 2 - 37
River Flood Conditions February 2017
Figure 2.19. Distribution of Flood Points in January 2020 .................................................... 2 - 38
Figure 2.20. Krukut Watershed Flood Hydrograph Simulation for Various Curve ................ 2 - 39
Numbers
Figure 2.21. The Effect of Tides on the Process of Deposition and Erosion in Estuary ....... 2 - 40
Areas
Figure 2.22. Integrated Flood Management Concept ........................................................... 2 - 42
Figure 2.23. Components of Integrated Flood Management ................................................ 2 - 43
Figure 2.24. Pump House Location Plan in DKI Jakarta ...................................................... 2 - 44
Figure 2.25. Examples of Pump Houses & Mobile Pumps ................................................... 2 - 47
Figure 2.26. Ria Rio Reservoir in East Jakarta .................................................................... 2 - 49
Figure 2.27. Sluice Gate Pulogadung & Sluice Gate Manggarai .......................................... 2 - 51
Figure 2.28. Illustration of the Relative Measurement of Flood History Survey Points to ..... 2 - 52
BMP JMCA
Figure 2.29. Illustration of GPS RTK NTRIP Measurements Between BASE (BMP ............ 2 - 53
JMCA) and Historical Flood and Obstacle Survey Points in the Field
Figure 2.30. Google My Map Application for the Flood Point Survey Team as .................... 2 - 54
a Navigation Tool in Measuring GNSS RTK
Figure 2.31. Navigation Via Googlemap on Android Phone ................................................. 2 - 54
Figure 2.32. Setting Base Station (Static) and Rover GNSS RTK, Location of BMP ........... 2 - 55
88 BKT Cakung Bridge

Table of Contents - 3
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

Figure 2.33. Base Station GNSS RTK at BMP 123 .............................................................. 2 - 55


Figure 2.34. Rover GNSS RTK and Base Station GNSS RTK at BMP 88 for Ujung............ 2 - 56
Menteng Station
Figure 2.35. Coordinates of the Position of the Flood Survey Point Around Depot .............. 2 - 57
Rorotan to BMP 123
Figure 2.36. JMCA Field Picking Test at BMP 64 Kwitang ................................................... 2 - 59
Figure 2.37. Current Meter Flowatch FL-03 ......................................................................... 2 - 60
Figure 2.38. Plastic Rope ..................................................................................................... 2 - 61
Figure 2.39. Measuring Rods / Measuring Signs ................................................................ 2 - 61
Figure 2.40. Preparation (Installation Of Supporting Equipment) ......................................... 2 - 64
Figure 2.41. Measure water depth with an interval of 2 m .................................................... 2 - 64
Figure 2.42. Measur the Depth at the Midpoint of Cross-Section (at Depths of 0.2, 0.6 ...... 2 - 65
and 0.8)
Figure 2.43. Illustration Basic Principles of Bathymetry ....................................................... 2 - 69
Figure 2.44. Location of the East Canal Flood River (BKT) ................................................. 2 - 69
Figure 2.45. Location of the West Canal Flood River (BKB) ................................................ 2 - 70
Figure 2.46. Location of Cideng River .................................................................................. 2 - 70
Figure 2.47. Total Station and Bathymetry Work Tools Used .............................................. 2 - 70
Figure 2.48. Planning of the River Cross-Section Path and the Nearest BMP for ................ 2 - 71
Reference
Figure 2.49. Implementation of GNSS RTK Static for additional CP in BKB ........................ 2 - 72
Figure 2.50. Preparation of Measurements and Calibration of On-Site Echosounder .......... 2 - 73
Figure 2.51. Cideng River Bathymetric Acquisition .............................................................. 2 - 73
Figure 2.52. Flood Control Bathymetric Acquisition (West Canal Flood).............................. 2 - 74
Figure 2.53. BKT Flood Control Bathymetric Acquisition (East Canal Flood) ....................... 2 - 75
Figure 2.54. Raw Data Bathymetry BKT Controlled Basemap JMCA 20220422 ................. 2 - 77
JKT-EW_BD.dwg
Figure 2.55. Raw data of Cideng and BKB Bathymetry is controlled JMCA ......................... 2 - 77
Basemap 20220422 JKT-EW_BD.dwg
Figure 2.56. Implementation of JMCA Field Supervision on 23 May 2022 at BKT ............... 2 - 78
(6°10'48.67"S, 106°58'18.90"E) by Mr. Khaidri and Mr. Biqi
Figure 2.57. BKB Flood Control Cross Section Layout (Full Image Attached - .................... 2 - 79
Point A4-A6)
Figure 2.58. Layout Cross Section Cideng River (Full Image Attached - Point C1-C2)........ 2 - 80
Figure 2.59. Layout Cross Section Cideng River (Full Image Attached - Point C16-C17).... 2 - 81
Figure 2.60. Layout Cross Section BKT Flood Control (Full Image Attached - .................... 2 - 82
Point B1-B2)
Figure 2.61. Layout Cross Section BKT Flood Control (Full Image Attached - .................... 2 - 83
Point B29-B29)
Figure 2.62. Layout Cross Section BKT Flood Control (Full Image Attached) ..................... 2 - 84
Figure 2.63. Product File Attachments ................................................................................. 2 - 85
Figure 2.64. Location Map of Observation Stations in Jabodetabek Area (BMKG) .............. 2 - 86
Figure 3.1. Example of Map Display and Its Elements ....................................................... 3-7
Figure 3.2. Map Element Relationship Display with Attributes ........................................... 3-8
Figure 3.3. Layer(s) Relationship View , Attribute Tables, and GIS Database ................... 3-9
Figure 3.4. Example Display Model.................................................................................... 3 - 10
Figure 3.5. Example of a Line Descending View ................................................................ 3 - 12
Figure 3.6. Example of a Raster Data Model Structure Display ......................................... 3 - 13
Figure 3.7. Example of Map View ...................................................................................... 3 - 14
Figure 3.8. Example of Raster Data Coordinate System Before and After......................... 3 - 15
Transformation

Table of Contents - 4
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

Figure 3.9. Example of Raster Data Coordinate System Display After Transformation ..... 3 - 15
Figure 3.10. All Vector.......................................................................................................... 3 - 18
Figure 3.11. Vector in Zoom ................................................................................................. 3 - 18
Figure 3.12. Description of Legend Data Vector .................................................................. 3 - 19
Figure 3.13. Planned Area Satellite Image Map ................................................................... 3 - 20
Figure 3.14. Satellite Image Map of Planned Area With Maximum Zoom (Zoom Level 21) . 3 - 20
Figure 3.15. The Geological Data Image is Zoomed in for the Required Area Only ............ 3 - 21
Figure 3.16. The KLHK Data Image Is Zoomed in for the MRT Phase 1 Area ..................... 3 - 22
Figure 3.17. DKI Flood Point Data ....................................................................................... 3 - 23
Figure 3.18. National DEM Image Resolution 7 m per Pixel Area MRT (Balaraja to ............ 3 - 23
Ciracas)
Figure 3.19. 12 cm DEM Data With A Resolution Of 1-2 cm Per Pixel (More Dense ........... 3 - 24
And Detailed For Each Area)
Figure 3.20. Example 2 cm DEM Data Cut Crosswise / Longitudinally ................................ 3 - 24
Figure 3.21. Field Survey Points Regarding Inundation ....................................................... 3 - 25
Figure 3.22. Example Image Combined With 2 cm DEM Data + All Vector Data + ............. 3 - 26
Drainage Network + Contour Data + Building Data
Figure 3.23. Example of a Merged Image in 3D Format ...................................................... 3 - 26
Figure 3.24. Sample Image Satellite Image Created in 3D Format ...................................... 3 - 27
Figure 3.25. Combined Data Image of the 1Batu Mulia St. With a Scale of 1 : 3.500 .......... 3 - 28
Figure 3.26. Combined Data Image of the 1Technology St. With a Scale of 1 : 3.500 ........ 3 - 29
Figure 3.27. Combined Data Image of the 1Kebon Jeruk St. With a Scale of 1 : 3.500 ....... 3 - 30
Figure 3.28. Combined Data Image of the 1Tanjung Duren St. With a Scale of 1 : 3.500 ... 3 - 31
Figure 3.29. Combined Data Image of the 20. Arjuna Selatan St. With a Scale of 1 : 3.500 3 - 32
Figure 3.30. Combined Data Image of the 2Tomang St. With a Scale of 1 : 3.500 .............. 3 - 33
Figure 3.31. Combined Data Image of the 2Grogol St. With a Scale of 1 : 3.500 ................ 3 - 34
Figure 3.32. Combined Data Image of the 2Roxy St. With a Scale of 1 : 3.500 ................... 3 - 35
Figure 3.33. Combined Data Image of the 2Petojo St. With a Scale of 1 : 3.500 ................. 3 - 36
Figure 3.34. Combined Data Image of the 2Cideng St. With a Scale of 1 : 3.500 ................ 3 - 37
Figure 3.35. Combined Data Image of the 2Thamrin St. With a Scale of 1 : 3.500 .............. 3 - 38
Figure 3.36. Combined Data Image of the 2Kebun Sirih St. With a Scale of 1 : 3.500 ........ 3 - 39
Figure 3.37. Combined Data Image of the 2Kwitang St. With a Scale of 1 : 3.500 .............. 3 - 40
Figure 3.38. Combined Data Image of the 2Senen St. With a Scale of 1 : 3.500 ................. 3 - 41
Figure 3.39. Combined Data Image of the 30. Galur St. With a Scale of 1 : 3.500 .............. 3 - 42
Figure 3.40. Combined Data Image of the 3Cempaka Putih St. With a Scale of 1 : 3.500... 3 - 43
Figure 3.41. Combined Data Image of the 3Sumur Batu St. With a Scale of 1 : 3.500 ........ 3 - 44
Figure 3.42. Combined Data Image of the 3Pakulonan Barat St. With a Scale ................... 3 - 45
of 1 : 3.500
Figure 3.43. Combined Data Image of the 3Pakulonan Timur St. With a Scale ................... 3 - 46
of 1 : 3.500
Figure 3.44. Combined Data Image of the 3Perintis St. With a Scale of 1 : 3.500 ............... 3 - 47
Figure 3.45. Combined Data Image of the 3Pulo Gadung St. With a Scale of 1 : 3.500 ...... 3 - 48
Figure 3.46. Combined Data Image of the 3Penggilingan St. With a Scale of 1 : 3.500 ...... 3 - 49
Figure 3.47. Combined Data Image of the 3Cakung Barat St. With a Scale of 1 : 3.500 ..... 3 - 50
Figure 3.48. Combined Data Image of the 3Pulo Gebang St. With a Scale of 1 : 3.500 ...... 3 - 51
Figure 3.49. Combined Data Image of the 40. Ujung Menteng St. With a Scale .................. 3 - 52
of 1 : 3.500
Figure 3.50. Combined Data Image of the 4Medan Satria St. With a Scale of 1 : 3.500 ...... 3 - 53
Figure 3.51. Combined Data Image of the Rorotan Depot With a Scale of 1 : 3.500 ........... 3 - 54
Figure 3.52. Combined Data Image of the BKB 01 With a Scale of 1 : 3.500 ...................... 3 - 55
Figure 3.53. Combined Data Image of the BKB 02 With a Scale of 1 : 3.500 ...................... 3 - 56

Table of Contents - 5
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

Figure 3.54. Combined Data Image of the BKB 03 With a Scale of 1 : 3.500 ...................... 3 - 57
Figure 3.55. Combined Data Image of the BKB 04 With a Scale of 1 : 3.500 ...................... 3 - 58
Figure 3.56. Combined Data Image of the BKB 05 With a Scale of 1 : 3.500 ...................... 3 - 59
Figure 3.57. Combined Data Image of the BKB 06 With a Scale of 1 : 3.500 ...................... 3 - 60
Figure 3.58. Combined Data Image of the BKB 07 With a Scale of 1 : 3.500 ...................... 3 - 61
Figure 3.59. Combined Data Image of the Cideng 01 With a Scale of 1 : 3.500 .................. 3 - 62
Figure 3.60. Combined Data Image of the Cideng 02 With a Scale of 1 : 3.500 .................. 3 - 63
Figure 3.61. Combined Data Image of the Cideng 03 With a Scale of 1 : 3.500 .................. 3 - 64
Figure 3.62. Combined Data Image of the Cideng 04 With a Scale of 1 : 3.500 .................. 3 - 65
Figure 3.63. Combined Data Image of the Cideng 05 With a Scale of 1 : 3.500 .................. 3 - 66
Figure 3.64. Combined Data Image of the BKT 01 With a Scale of 1 : 3.500 ...................... 3 - 67
Figure 3.65. Combined Data Image of the BKT 02 With a Scale of 1 : 3.500 ...................... 3 - 68
Figure 3.66. Combined Data Image of the BKT 03 With a Scale of 1 : 3.500 ...................... 3 - 69
Figure 3.67. Combined Data Image of the BKT 04 With a Scale of 1 : 3.500 ...................... 3 - 70
Figure 3.68. Combined Data Image of the BKT 05 With a Scale of 1 : 3.500 ...................... 3 - 71
Figure 3.69. Combined Data Image of the BKT 06 With a Scale of 1 : 3.500 ...................... 3 - 72
Figure 3.70. Combined Data Image of the BKT 07 With a Scale of 1 : 3.500 ...................... 3 - 73
Figure 3.71. Combined Data Image of the BKT 08 With a Scale of 1 : 3.500 ...................... 3 - 74
Figure 3.72. Combined Data Image Around MRT Project Phase 1 With a Scale ................. 3 - 75
of 1 : 3.500
Figure 4.1. Flow Chart Study of Possible Water Levels ..................................................... 4-2
Figure 4.2. Data Used For Model ....................................................................................... 4-4
Figure 4.3. Model Network & Parameter in HEC HMS ....................................................... 4-5
Figure 4.4. Illustration Of Flow/Structure Diagram in The Simulation of The Rain ............. 4-7
Flow Transformation Process
Figure 4.5. Example Summary of Modeling Results .......................................................... 4-9
Figure 4.6. Example of Modeling Flood Inundation Graph Scenario 1 ............................... 4 - 10
Figure 4.7. Example HEC Ras Model Result ..................................................................... 4 - 13
Figure 4.8. Example of Modeling Areas Affected by Floods ............................................... 4 - 14
Figure 4.9. Examples 1D 2D Flow Model East Banjir Canal Rorotan Station Return ......... 4 - 16
Period Of 100 Years
Figure 4.10. 3D Flow Model West Flood Canal Return Period of 300 Years ....................... 4 - 17
Figure 4.11. Tools For Us As Users To Draw ...................................................................... 4 - 18
Figure 4.12. Sample Worksheet for Filling in River Components and Characteristics ......... 4 - 18
Figure 4.13. Unstable Flow Analysis Worksheet Example ................................................... 4 - 19
Figure 4.14. Example Output HEC-RAS Modelling .............................................................. 4 - 20
Figure 4.15. Example Output HEC-RAS Modelling (a) Without (b) With Countermeasure .. 4 - 21
Figure 4.16. Example Output Bathymetric Acquisition 1 ...................................................... 4 - 21
Figure 4.17. Example Output Bathymetric Acquisition 2 ...................................................... 4 - 21
Figure 4.18. Example Output Bathymetric Acquisition 3 ...................................................... 4 - Error!
Bookmark not defined.
Figure 4.19. Example Calibration Model East Flood Canal (BKT) ....................................... 4 - 23

Table of Contents - 6
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

Table 2.1. Number of Survey Points ................................................................................. 2-2


Table 2.2. Flood Incident at Survey Location .................................................................... 2-3
Table 2.3. Example Tabulation of Data Based on Survey Results .................................... 2-4
Table 2.4. List of PHB Channels in DKI Jakarta (Connection Channels) .......................... 2 - 16
Table 2.5. List of Micro Drainage in DKI Jakarta ............................................................... 2 - 23
Table 2.6. Historical Masterplan, Study and Implementation of Flood Control in Jakarta . 2 - 30
Table 2.7. Distribution of Flood Control Pump Locations in DKI Jakarta ........................... 2 - 45
Table 2.8. Lake / Swamp at Survey Location .................................................................... 2 - 48
Table 2.9. List of Sluice gate Locations at Survey Locations ............................................ 2 - 50
Table 2.10. Coordinates of the Position of the Flood Survey Point Around Depot .............. 2 - 57
Rorotan to BMP 123
Table 2.11. Result of GNSS RTK Measurement Using GPS RTK NTRIP for Flood ........... 2 - 58
Point Survey Locations
Table 2.12. Upstream Point BKT ........................................................................................ 2 - 66
Table 2.13. Downstream Point ............................................................................................ 2 - 66
Table 2.14. Upstream Point BKB ........................................................................................ 2 - 66
Table 2.15. Downstream Point ............................................................................................ 2 - 66
Table 2.16. Upstream Point ................................................................................................ 2 - 67
Table 2.17. Downstream Point ............................................................................................ 2 - 67
Table 2.18. Equipment Survey ............................................................................................ 2 - 68
Table 2.19. Reference Point ............................................................................................... 2 - 71
Table 2.20. Reference Point for Polygon Cross-Section Streams ...................................... 2 - 72
Table 2.21. Data Log and Preliminary Verification of Bathymetric Data.............................. 2 - 75
Table 2.22. ARR Stations Location ..................................................................................... 2 - 86
Table 2.23. Rainfall Data from Cengkareng BMKG Station ................................................ 2 - 87
Table 2.24. Rainfall Data from Halim Perdana Kusuma BMKG Station .............................. 2 - 88
Table 2.25. Rainfall Data from Kamayoran BMKG Station ................................................. 2 - 89
Table 2.26. Rainfall Data from Citeko BMKG Station.......................................................... 2 - 90
Table 3.1. GIS Operating System Menu ....................................................................... 3 - 77
Table 4.1. Scenario of Simulation Model .......................................................................... 4-1
Table 4.2. Data Need ........................................................................................................ 4-2
Table 4.3. Modeling Included In The HEC-HMS Program ................................................ 4-6
Table 4.4. Perfomance Rating for Evaluation Metrics ....................................................... 4 -11
Table 5.1. Time Schedule ................................................................................................. 5-2
Table 5.2. Type and Time of Report Submission .............................................................. 5-3

Table of Contents - 7

You might also like