You are on page 1of 1

Draft Final Report of Hydrological Survey Works For Engineering Services For Jakarta

Mass Rapid Transit (MRT) East-West Line Project (Phase 1) was prepared based on the
Work Agreement / Contract between PT. Barunadri Engineering Consultant with the Jakarta
Metro Consultant Association (JMCA) consisting of Nippon Koei Co. Ltd., Oriental
Consultants Global Co., Ltd., SYSTRA SA, PT. Matra Engineering International, PT.
Dardela Yasa Guna, PT. Jaya CM, and PT. Perentjana Djaja.
As stated in the TOR, this Draft Final Report covers the following matters. : Description of
all required result of study.
We thank you very much for the attention and assistance of all parties who helped in the
completion of this Interim Report.

Jakarta, 12 September 2022

PT. Barunadri Engineering Consultant

Leonarda Ibnu Said


Team Leader

Foreword - iii

You might also like