The World Bank Implementation Support Mission conducted a review of the Strengthening Urban Resilience Project (SupRB) in several districts of Bangladesh. In a meeting, the mission presented its report and findings to additional chief engineer of LGED. The mission observed that:
(1) Infrastructure developed under SupRB is benefiting local communities and increasing local resilience.
(2) LGED project director and staff are properly implementing and monitoring project activities.
(3) Some arrangements need to be made for better implementation of one infrastructure after identifying issues in design and quality.
(4) Land acquisition in some cases is causing delays in project implementation.
(5) Occupational health and safety in
The World Bank Implementation Support Mission conducted a review of the Strengthening Urban Resilience Project (SupRB) in several districts of Bangladesh. In a meeting, the mission presented its report and findings to additional chief engineer of LGED. The mission observed that:
(1) Infrastructure developed under SupRB is benefiting local communities and increasing local resilience.
(2) LGED project director and staff are properly implementing and monitoring project activities.
(3) Some arrangements need to be made for better implementation of one infrastructure after identifying issues in design and quality.
(4) Land acquisition in some cases is causing delays in project implementation.
(5) Occupational health and safety in
The World Bank Implementation Support Mission conducted a review of the Strengthening Urban Resilience Project (SupRB) in several districts of Bangladesh. In a meeting, the mission presented its report and findings to additional chief engineer of LGED. The mission observed that:
(1) Infrastructure developed under SupRB is benefiting local communities and increasing local resilience.
(2) LGED project director and staff are properly implementing and monitoring project activities.
(3) Some arrangements need to be made for better implementation of one infrastructure after identifying issues in design and quality.
(4) Land acquisition in some cases is causing delays in project implementation.
(5) Occupational health and safety in
Mahilaon Ki Swasthy Sambandhi Mithak Dharnayen: 100 Se Aadhik Swasthy Sambandhi Yesi Galatfahmiyan Jo Mahilaon Ke Swasthy Jeevan Jeene Mai Badhak Banti Hai