Professional Documents
Culture Documents
TITLE
. NO. COMBINED CYCLE POWER PLANT SHEET 1 OF 9
TCE-3837A-H-500-001 SCOPE
1.0 SCOPE:
1.1 One (1) Gas Turbine Generator set to meet the specification
requirements with regard to site power output, each consisting of gas
turbine, electric generator, turning gear, fuel injection skid, Dry Low Nox
Combustor/ deNOx steam injection skid if required, lubricating and
hydraulic system, GTG start-up system, excitation system, generator
cooling system, enclosure, compartment ventilation system, fire
detection, protection and alarm system, lagging, off-line and on-line
washing system, etc.
1.2 Gas turbine inlet air filtration system for each gas turbine consisting of
inlet screen, pre filters, cannister type self cleaning filters, ducting with
necessary expansion joints, air processing skid(if required), etc.
1.4 Independent dual or triple pressure and reheat or non - reheat, natural
circulation Heat Recovery Steam Generator(HRSG) for each gas
turbine with necessary condensate preheater, individual insulated steel
stack, ducting with necessary expansion joints, CBD tank, IBD tank,
integral piping, supporting structure, roofing with side cladding, access
staircase, walkways and platforms, insulation with cladding, HRSG fill
pump, etc.
OR
TITLE
. NO. COMBINED CYCLE POWER PLANT SHEET 2 OF 9
TCE-3837A-H-500-001 SCOPE
1.6 Steam and water cycle as per “Steam and water cycle scheme for
combined cycle power plant” (dwg. no. TCE.3837A-540-SK-0001-R0
consisting of axial or side mounted lateral or bottom mounted steam
surface condenser, two(2) X 100% liquid ring type mechanical vacuum
pumps, condensate extraction pumps, gland steam condenser,
condensate pre-heater, deaerating feedwater heater, HP/IP and LP
HRSG feedwater pumps, 100% HP-IP-LP bypass system consisting of
electro-hydraulically operated HP bypass valve, IP bypass valve and
LP bypass valve, necessary spray control valves, necessary piping,
insulation with cladding, etc.
1.7 One emergency diesel generator using HSD along with its auxiliaries
and HSD storage tank. The DG set shall be housed in a building with
necessary handling facility.
1.9 River water intake system including river water intake pumps (located
in the river water pumphouse), expansion joints, butterfly valves, stop
logs, coarse screens and river water chlorination system (of cylinder
mounted type).
1.11 Auxiliary cooling water (ACW) system for auxiliaries of gas turbine
generator and steam turbine generator system consisting of ACW
TITLE
. NO. COMBINED CYCLE POWER PLANT SHEET 3 OF 9
TCE-3837A-H-500-001 SCOPE
1.13 Two Nos. above ground raw storage tank each having storage capacity
of one lakh cu.m total plant raw water storage requirement and raw
water pumps located adjacent to the raw water reservoir conveying
water to the raw water clarification system. Clarification system
consisting of two numbers clarifiers (raw water clarifier and DM plant
clarifier) complete with clarifier sludge treatment plant. Above ground
storage tank (clarified water storage tank) to store water from the raw
water clarifier, divided into two compartments with adequate storage for
fire protection system. DM plant clarifier water storage tank adjacent to
the above tank to store the clarified water from DM plant clarifier.
Clarified water pumphouse to house various pumps drawing water from
these storage tanks.
1.17 Water treatment plant - WT plant supply pumps , pressure sand filters,
activated carbon filters, ion-exchange units, degasser system, filtered
water storage tanks and DM water storage tanks.
1.18 DM water system for generation of DM water along with its DM water
storage tanks and condensate storage tank consisting of two(2) stream
demineralisation plant along with ion-exchange units, air-blowers,
regeneration water pumps, common regeneration system comprising of
mixing tanks, ejectors, dilution tanks for acid and dilution tanks for
alkali, bulk acid and alkali storage tanks, common neutralisation system
consisting of neutralising (recirculation/disposal) pumps , air agitation
piping, pH monitors, chemical dosing system and effluent disposal
TITLE
. NO. COMBINED CYCLE POWER PLANT SHEET 4 OF 9
TCE-3837A-H-500-001 SCOPE
1.19 Effluent treatment plant consisting of oil water separator, guard pond,
effluent discharge pumps, piping , chemical dosing system ,etc.
1.21 Fire protection system consisting of fire water pumps located in clarified
water pump house, hydrant system for all areas, HVWS for all
transformers and its auxiliaries, MVWS for cable galleries, portable fire
extinguishers, mobile fire tender, gas flooding system for control rooms,
various enclosures of gas turbines, computer rooms of administration
building, etc.
1.22 Separate central air conditioning system (Chilled water system) for
main control building, analyser room, and switchyard relay room,
separate packaged air conditioning system of water cooled type for
chemical lab, DM plant control room, administration building with
cooling towers, window/split air conditioning system for other areas and
any other area as recommended by respective equipment
manufacturer.
1.23 Evapourative coolers( air washer) system for GTG and STG building
and for other areas as specified. The ambient air ventilation system
shall consist of supply air fans, exhaust air fans/ power roof extractors
(with covering), air distribution system etc as specified elsewhere in the
specification.
1.24 Instrument air and service air system consisting of compressor unit, air
drier, air receiver, piping, necessary handling facility etc.
1.25 Service water and potable water system consisting of storage tanks,
piping, etc.
1.29 Necessary laboratory for testing of fuel oils, turbine oils, transformer
oils, ambient air quality, stack emission, steam and water and all other
TITLE
. NO. COMBINED CYCLE POWER PLANT SHEET 5 OF 9
TCE-3837A-H-500-001 SCOPE
1.32.2 Generator circuit breakers for each of the GTG and STG with series
disconnector, current and voltage transformers, grounding switches,
surge arrestors and protective capacitors in three single phase
enclosures.
1.32.3 One (1) no. unit auxiliary transformer (UAT) and accessories for
each GTG and STG.Two (2) nos UAT for single shaft configaration
1.32.7 6.6kV switchgear with synchronising, manual change over and auto
change over schemes.
TITLE
. NO. COMBINED CYCLE POWER PLANT SHEET 6 OF 9
TCE-3837A-H-500-001 SCOPE
1.32.11 Isolated phase bus ducts and accessories for connection between
Generators , GCBs , UATs and generator transformers.
TITLE
. NO. COMBINED CYCLE POWER PLANT SHEET 7 OF 9
TCE-3837A-H-500-001 SCOPE
1.32.26 AC, DC motors for all the auxiliaries and valve actuators.
1.32.27 Local control panels for all the mechanical and electrical systems as
indicated in relevant equipment / system chapters.
1.32.28 Elenators
1.33. Civil works
TITLE
. NO. COMBINED CYCLE POWER PLANT SHEET 8 OF 9
TCE-3837A-H-500-001 SCOPE
1.33.10 Raw water reservoir, raw water pump house , fire water pumps;
cooling towers and CW channel from cooling tower to CWPH
forebay, chlorination room; guard pond.
1.34 Painting (shop paint and final paints at site after erection) of all the
equipment / systems as per the approved colour scheme of
Owner / Owner’s Representatives.
1.36 All necessary lifting and handling equipment to facilitate the handling
of complete plant systems / equipment / components during
erection/ maintenance/overhaul for entire life of the plant.
1.37 Temperary site buildings
1.39 Spares
TITLE
. NO. COMBINED CYCLE POWER PLANT SHEET 9 OF 9
TCE-3837A-H-500-001 SCOPE
1.39.5 All Performance test /unit characteristic test/ reliability test and test
instrumentation as required on loan basis.