GENERAL NOTES

1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED IN


ACCORDANCE WITH THE PROVISION OF THE PHILIPPINE PLUMBING CODE, THE
NATIONAL BUILDING CODE.
2. ALL DRAWINGS AND SPECIFICATIONS SHALL BE CORRECTLY REVIEWED BY
THE CONTRACTOR AND THE PROJECT MANAGER SHALL IMMEDIATELY BE
INFORMED IN CASE OF DISCREPANCY FOUND HEREIN.
3. ALL PLUMBING LAYOUTS ARE ONLY DIAGRAMMATIC. ACTUAL LAYOUT OF
PIPES AND FITTINGS, UNLESS OTHERWISE REQUIRED, SHALL BE PROPERLY
CONCEALED.
4. ALL PIPES SHALL BE INSTALLED AS INDICATED IN THE PLANS. ANY
RELOCATION REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL
BE WITH PRIOR APPROVAL OF THE PROJECT MANAGER.
5. ALL MAINTENANCE FITTINGS SUCH AS GATE VALVES, BALL VALVES, UNIONS,
CLEANOUTS, SHALL BE EXPOSED AND ACCESSIBLE. ALL CLEANOUTS SHALL BE
FLUSH MOUNTED TO FLOOR OR WALL AS INDICATED IN THE PLANS.
6. NO PIPE SHALL BE EMBEDDED IN STRUCTURAL MEMBERS UNLESS
OTHERWISE SPECIFIED OR ALLOWED.
7. INSTALLATION OF WATERLINE SYSTEM, PUMPS AND OTHER EQUIPMENTS
SHALL ONLY BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS AND SPECIFICATIONS.
8. ALL WATERLINE DISTRIBUTIONS PER FLOOR SHALL RUN THRU THE CEILING
BEFORE DROPPING TO INDIVIDUAL SUPPLY UNITS.
9. MINIMUM SLOPE FOR SEWER LINES SHALL BE 2% AND THE DRAINAGE SHALL
BE 9%.
10. ALL FIXTURES SHALL BE INDIVIDUALLY VENTILATED. VENTS THRU EAVES
SHALL BE DISCHARGED AT EAVES VENT SLATS. ALL VENT THRU ROOF BE
PROVIDED WITH DOWNWARD ELBOWS AND SCREEN.
11. ALL WORKS SHALL BE TESTED AND COMMISSIONED AS INDICATED IN THE
SPECIFICATIONS PRIOR TO CONCEALING OF PIPES AND SHALL BE CONDUCTED
WITH THE PRESENCE OF THE OWNER, THE DESIGNER, THE PROJECT
MANAGER, THE CONTRACTOR OR THEIR DULY AUTHORIZED
REPRESENTATIVES. RESULTS SHALL BE PROPERLY DOCUMENTED.
12. ALL PLUMBING WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION
OF A DULY LICENSED SANITARY ENGINEER OR MASTER PLUMBER.