GENERAL NOTES

1. ALL MECHANICAL WORKS SHALL BE DONE IN ACCORDANCE WITH


THE LATEST REQUIREMENTS OF THE PHILIPPINE NATIONAL
BUILDING CODE AND REGULATION OF THE LOCAL MUNICIPALITY
2. THE TOTAL SCOPE OF WORK SHALL INCLUDE ALL WORKS
DESCRIBED IN PLANS AND LISTED IN THE TECHNICAL
SPECIFICATION FOR MECHANICAL WORKS.
3. THE WORK SHALL BE EXECUTED IN CLOSE COORDINATION WITH
ALL TRADES.
4. ALL AIR CONDITIONED SPACES SHALL BE MAINTAINED AT 27oC AND
19oWB.
5. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, MANUFACTURES
EQUIPMENT SPECIFICATION AND MATERIAL SAMPLES TO INCLUDE
VIBRATION ISOLATORS, INSULATION, DAMPERS, ETC.
6. CONTRACTORS/SUPPLIER SHALL INSTALL ALL EQUIPMENT IN
ACCORDANCE WITH MANUFACTURERS RECOMMENDATION.
7. ALL POWER WIRINGS UP TO SPLICE BOX SHALL BE BY
ELECTRICAL CONTRACTOR AND FROM SPLICE BOX TO
EQUIPMENT BY MECHANICAL CONTRACTOR.
8. VERIFY LOCATION OF CONTROLLERS AND SWITCHES IN THE
ELECTRICAL PLANS.
9. ALL PIPE EQUIPMENT CONDENSATE DRAIN LINE TO THE NEAREST
FLOOR DRAIN STUB-OUT PROVIDED BY THE PLUMBING
CONTRACTOR.

AIR CONDITIONING AND VENTILATION EQUIPMENT SCHEDULE


FAN SCHEDULE
EQUIPMENT
EXHAUST
FAN

QTY

LOCATION

12

ALL
TOILETS

TSP
IN
H20

CAPACITY
CFM

WATTS/HP

MOTOR DRIVE
VOLTS

PH

HZ

0.25

110

50

230

60

TYPE
WALL
MOUNTED
EXHAUST
FAN

REMARKS
PENN OR
APPROVE
D EQUAL

WINDOW TYPE AIR CONDITIONING UNIT SCHEDULE


EQUIPMENT

LOCATION

CAPACITY
KJ/HR

VOLTAGE/
PHASE/HZ

AIR
FLOW
CM/MIN

WATTS

STARTING
CURRENT

OPERATING
CURRENT

WAC-1HP

ALL
BEDROOM

9,280

230/1/60

750

15

WAC-1.5 HP

OFFICES

13,000

230/1/60

9.60

1210

21.5

5.4

REMARKS
CARRIER OR
APPROVED EQUAL
CARRIER OR
APPROVED EQUAL