Pylon Shifting After Stay Cable Stressing with Respect to Pylon As-built

P4-14 (LHS) at Lvl. -104.5 P4-14 (RHS) at Lvl.- 104.5


As Per Site Design As Per Site Design
Stay Cable Stay Cable
X Z X Z X Z X Z
C1 , M1 -3 -10.2 C1 , M1 1 3 -3 10.5
C2 , M2 -6.3 -11.8 C2 , M2 1 2 -6.3 12.2
C3 , M3 -6 -13.6 C3 , M3 4 5 -6 14
C4 , M4 -16 -9 -6.5 -35.1 C4 , M4 4 19 -6.5 35.9
C5 , M5 -18 -16 -9.8 -47.4 C5 , M5 6 26 -9.8 48.4
C6 , M6 C6 , M6
C7 , M7 C7 , M7
C8 , M8 C8 , M8
C9 , M9 C9 , M9

P4-15 (LHS) at Lvl.- 104.5 P4-15 (RHS) at Lvl.- 104.5


As Per Site Design As Per Site Design
Stay Cable Stay Cable
X Z X Z X Z X Z
C1 , M1 3 0 3.4 -10.2 C1 , M1 -3 3 3.4 10.5
C2 , M2 0 1 6.7 -11.8 C2 , M2 3 2 6.7 12.2
C3 , M3 4 0 6.5 -13.6 C3 , M3 4 5 6.5 14
C4 , M4 -4 -31 6.8 -35.8 C4 , M4 12 21 6.7 36.6
C5 , M5 -4 -37 7.7 -39.6 C5 , M5 9 24 7.7 40.4
C6 , M6 10 45 10.4 -52.8 C6 , M6 11 31 10.4 53.6
C7 , M7 C7 , M7
C8 , M8 C8 , M8
C9 , M9 C9 , M9