The document reports pylon shifting measurements for two pylons (P4-14 and P4-15) after stay cable stressing. It provides the x and z coordinates in meters for each stay cable on the left and right hand sides of the two pylons, comparing the as-built design coordinates to the post-stressing measurements. Significant shifts up to 10-50 meters were observed for some cables on both pylons after stressing.
Original Description:
Original Title
Pylon shifting after stay cable stressing with Respect to As built-1
The document reports pylon shifting measurements for two pylons (P4-14 and P4-15) after stay cable stressing. It provides the x and z coordinates in meters for each stay cable on the left and right hand sides of the two pylons, comparing the as-built design coordinates to the post-stressing measurements. Significant shifts up to 10-50 meters were observed for some cables on both pylons after stressing.
The document reports pylon shifting measurements for two pylons (P4-14 and P4-15) after stay cable stressing. It provides the x and z coordinates in meters for each stay cable on the left and right hand sides of the two pylons, comparing the as-built design coordinates to the post-stressing measurements. Significant shifts up to 10-50 meters were observed for some cables on both pylons after stressing.