Professional Documents
Culture Documents
Request for Proposal for Authority’s Engineer for Design, Engineering, Procurement, Supply and Construction for Construction of Four Lane Bridge including approaches
over River Brahmaputra between Dhubri on North Bank and Phulbari on South Bank in the State of Assam / Meghalaya on NH-127B (Length: 19.282 km)
NHIDCL
Position: Chief Resident Engineer (Main Bridge) - Execution Team (International/National)
Name: Indra Nath Mishra
Maximum Score
Sl No. Criteria Evaluation Basis
Mark secured
(4)
(1) (2) (3) (5)
Total Score 100
1) General Qualification 25
i) Graduate in Civil Engineering 21 B.E. (Civil Engineering) from JawaharLal Nehru National College of Engineering, Shimoga 21
(Karnataka) under Kuvempu, University, India in 1997
ii) Additional Desirable Qualification: 4 MTech in Structural Engineering from Anna University in 2006 4
Postgraduate in Construction
Management / Highway
Engineering / Transportation
Engineering / Structural
Engineering /Soil Foundation
Engineering
2 Adequacy for the Project 60
a) Professional Experience in 10
Bridge projects:
i) Aggregate minimum 20 years of 7 Indra Nath Mishra having a total professional experience above 25 years in design, execution, and 7
professional experience in rehabilitation of various types of highways bridges.
minimum 3 countries (which may
include their home country) with UAE – 1 year 7 months
minimum two years in foreign Bangladesh – 2 years 2 months
country (other than home Saudi Arabia – 2 years 11 months
country). India - 18 years 4 months
Total 25 years
Request for Proposal for Authority’s Engineer for Design, Engineering, Procurement, Supply and Construction for Construction of Four Lane Bridge including approaches
over River Brahmaputra between Dhubri on North Bank and Phulbari on South Bank in the State of Assam / Meghalaya on NH-127B (Length: 19.282 km)
NHIDCL
Maximum Score
Sl No. Criteria Evaluation Basis
Mark secured
(4)
(1) (2) (3) (5)
lane for highway/ expressway/rail
cum road bridge) with well
foundation and piles over Sea/
Creek/ Perennial River/ Estuary
i) 5 years or more 10 1. Construction of Cable Stayed Bridge Including Its Approaches Across River Anji Khad 10
Between Tunnel T2 And T3 On Katra Banihal Section of Udhampur Srinagar – Baramulla Rail
Link Project in the State of Jammu and Kashmir (BOQ)
Time period –Oct 2020 – July 2023 (2 years 10 months)
2. Project Management Consultancy Services for Design and Construction of Cable Stayed
Bridge across Durgam Cheruvu Lake at Madhapur in Hyderabad. (EPC)
Time period – March 2017 – August 2020 (3 years 5 months)
3. Detailed Design & Construction supervision of Hodariyat Cable Stayed Bridge Project, Abu
Dhabi, UAE (1.3km long marine crossing single plane Cable Stayed Bridge project having a
central span 200m with the stay pylons extending some 40m above the deck level) (EPC)
Time period – Nov 2009 - June 2011 (1 year 7 months)
4. Construction supervision & design of 950m long 4 lane single plane Extra dosed Third
Karnaphuli Bridge over Karnaphuli river in Bangladesh (EPC)
Time period – Sept. 2007 - Nov. 2009 (2 years 2 months)
5. Construction and designing of 5.6-km-long, eight-lane Cable-Stayed Bandra-Worli Sea Link
(BWSL) project in Mumbai.
Time period – July 2005 – Sept 2007 (2 years 2 months)
Request for Proposal for Authority’s Engineer for Design, Engineering, Procurement, Supply and Construction for Construction of Four Lane Bridge including approaches
over River Brahmaputra between Dhubri on North Bank and Phulbari on South Bank in the State of Assam / Meghalaya on NH-127B (Length: 19.282 km)
NHIDCL
Maximum Score
Sl No. Criteria Evaluation Basis
Mark secured
(4)
(1) (2) (3) (5)
iv) Additional 1 Marks for each 2 2
additional bridge project
c) Experience in Design of bridge 10
projects
i) Experience in at least 2 Bridge 8 1. Project Management Consultancy Services for Design and Construction of Cable Stayed 8
Projects either Cable stayed or Bridge across Durgam Cheruvu Lake at Madhapur in Hyderabad.
Cable suspension or extra dosed 2. Detailed Design & Construction supervision of Hodariyat Cable Stayed Bridge Project, Abu
or prestressed bridge of 2/4/6 Dhabi, UAE (1.3km long marine crossing single plane Cable Stayed Bridge project having a
lane for highway/expressway/rail central span 200m with the stay pylons extending some 40m above the deck level)
cum road bridge with minimum 3. Construction supervision & design review of 950m long 4 lane single plane Extra dosed Third
bridge length of 500 mtrs Karnaphuli Bridge over Karnaphuli river in Bangladesh
having span not less than 125 4. Construction and designing of 5.6-km-long, eight-lane Cable-Stayed Bandra-Worli Sea Link
metres each over Sea/ Creek/ (BWSL) project in Mumbai.
Perennial River/ Estuary with
well foundation and piles Total 4 projects.
Request for Proposal for Authority’s Engineer for Design, Engineering, Procurement, Supply and Construction for Construction of Four Lane Bridge including approaches
over River Brahmaputra between Dhubri on North Bank and Phulbari on South Bank in the State of Assam / Meghalaya on NH-127B (Length: 19.282 km)
NHIDCL
Maximum Score
Sl No. Criteria Evaluation Basis
Mark secured
(4)
(1) (2) (3) (5)
ii) Additional 0.50 Marks for each 2 0
additional year
f) Experience in Similar Capacity* of 5
Bridge Project funded by
Multilateral/ Bilateral Funding
Agency(ies).
i) Experience of 2 years in at least 3 1. Construction of 8.124 km Elevated Viaducts and extradosed major bridge and 8 Stations for 3
one Project Ahmedabad Metro Rail Project Phase - II from Motera Stadium to Mahatma Mandir and GNLU
to GIFT City Package - C1
Funded by: JBIC (Japan Bank of International Corporation)
Time period – Oct 2023 – till date (5 months)
2. Construction supervision of 950m long 4 lane single plane Extra dosed Third Karnaphuli Bridge
over Karnaphuli river in Bangladesh
Funded By - KFAED (Kuwait Fund for Arab Economic Development and Governments)
Time period – Sept. 2007 - Nov. 2009 (2 years 2 months)
3. Bridge- Construction Supervision of 552.5-meter bridge over the Yamuna River and 3 Minor
Bridges, includes the Special & Complex Work for DND (Delhi Noida Direct) Flyway.
Funded by: JBIC (Japan Bank of International Corporation)
Time period – Nov 1999 – Jan 2001 (1 year 2 months)
Total 3 projects.
Request for Proposal for Authority’s Engineer for Design, Engineering, Procurement, Supply and Construction for Construction of Four Lane Bridge including approaches
over River Brahmaputra between Dhubri on North Bank and Phulbari on South Bank in the State of Assam / Meghalaya on NH-127B (Length: 19.282 km)
NHIDCL
Maximum Score
Sl No. Criteria Evaluation Basis
Mark secured
(4)
(1) (2) (3) (5)
Time period –Oct 2020 – July 2023 (2 years 10 months)
3. Project Management Consultancy Services for Design and Construction of Cable Stayed
Bridge across Durgam Cheruvu Lake at Madhapur in Hyderabad. (EPC)
Time period – March 2017 – August 2020 (3 years 5 months)
4. Construction of Elevated Road Corridor from AIIMS (on NH-98) to Digha (on Ganga Path)
(12.27Km) at Patna on (EPC)
Time period – May 2014 – March 2017 (2 years 11 months)
5. Construction and designing of 5.6-km-long, eight-lane Cable-Stayed Bandra-Worli Sea Link
(BWSL) project in Mumbai.
Time period – July 2005 – Sep 2007 (2 years 2 months)
6. Construction Supervision of Allahabad Bypass Bridge Project of length 1010.2 m over river
Ganga; Erected by balance cantilever method with varying segment depths in Allahabad.
Time period – March 2001 - March 2003 (2 years 1 months)
7. Construction Supervision of 552.5-meter bridge over the Yamuna River and 3 Minor Bridges,
includes the Special & Complex Work for DND (Delhi Noida Direct) Flyway.
Time period – Nov 1999 – Jan 2001 (1 year 2 months)
8. Construction of Major Bridge at Bhandara across River Wainganga and at Nashik across River
Godavari, Phase-III, APSH-8, Length 88 Km
Time period – Aug 1996 - Nov 1999 (3 years 4 months)
Request for Proposal for Authority’s Engineer for Design, Engineering, Procurement, Supply and Construction for Construction of Four Lane Bridge including approaches
over River Brahmaputra between Dhubri on North Bank and Phulbari on South Bank in the State of Assam / Meghalaya on NH-127B (Length: 19.282 km)
NHIDCL
Maximum Score
Sl No. Criteria Evaluation Basis
Mark secured
(4)
(1) (2) (3) (5)
(BWSL) project in Mumbai.
Time period – July 2005 – Sep 2007 (2 years 2 months)
6. Construction Supervision of Allahabad Bypass Bridge Project of length 1010.2 m over river
Ganga; Erected by balance cantilever method with varying segment depths in Allahabad.
Time period – March 2001 - March 2003 (2 years 1 months)
7. Construction Supervision of 552.5-meter bridge over the Yamuna River and 3 Minor Bridges,
includes the Special & Complex Work for DND (Delhi Noida Direct) Flyway.
Time period – Nov 1999 – Jan 2001 (1 year 2 months)
8. Construction of Major Bridge at Bhandara across River Wainganga and at Nashik across River
Godavari, Phase-III, APSH-8, Length 88 Km
Time period – Aug 1996 - Nov 1999 (3 years 4 months)