Address: 480/B Mogbazar Chairman goli, Dhaka 1217, Shantinagr TSO, Ramna, Dhaka 1217
Primary Mobile No: 01922202791
Secondary Mobile No :01779552949
Primary Email : ahadrahman15@gmail.com
Career Objective:
Dedicated and detail-oriented Civil Engineer with 7.5 years of experience engineering operations management. Seeking a
challenging position .Capable of managing multiple projects at a time and motivated to provide the highest quality of services.
Career Summary:
1. Site Engineer at Tekken Corporation -Abdul Monem Ltd.-Abenikko JV ( Dhaka Metro Rail Project)
2. Asst. Project Engineer at Snowtex Group ( RMG Factory Building )
3. Civil Engineer at China Railway Major Bridge Engineering Group Co., Ltd (Padma Multipurpose Bridge Project )
4. Assistant Project Engineer at Discreet Architectural Consultant ( Commercial building + basement Project)
Special Qualification:
I have special qualifications on bridge construction, Steel structure work, industrial LEED certified green building, garments
factory related civil construction. Auto Cad (2D),MS Office , safety maintain, QC factors .
Employment History:
Total Year of Experience : 7.7 yrs
Duties/Responsibilities
Construction of Karwanbazar elevated metro rail's station building & viaduct.
Client : Dhaka Mass Rapid Transit Company Limited .
Consultant : NKDM Association
1. Oversee all the construction activities of substructure works & 3 storied elevated Station building of Dhaka Metro Rail?s
Karwanbazar Station ( 180 m X 25 m ), piling, pile cap, pier body, pier head and portal pier, seismic buffer, bearing base,
station building, pump room etc.
2. Review and prepare method statement, shop drawing and all other related construction documents. 3. Guide all the subcon
manpower engaged in station building , pier Body and pier head, structure surface Repair works for handover purpose.
4. Prepare Work Plan for effective use of resources (Manpower, formwork, scaffoldings, equipment, materials etc.
5. Supervise and troubleshoot all the works regarding station building, site management, estimation, BOQ, piling, rebar work,
rebar fabrication formwork installation, concreting, seismic buffer, bearing base, portal pier, station building, stair, brick wall,
pump room, septic tank etc.
6. Making all site construction related documents, rise RIW and close this.
7. Prepare indent monthly basic for site requirement.
8. Bill prepare.
9. Wastage control of rebar , concrete and other materials.
10. Ensure safety issue & proper PPE in all work sectors.
11. Report to the Project Manager regarding Progress of the work.
12. Superstructure work like :
- Parapet wall erection
- Cable though wall casting
- OCS casting
13. Substructure & Viaduct finishing & handover work to DMTCL.
14. Mcdonald`s Steel work monitor in station like,
- Anchor bolt fixing
- Non-shrink grout work supervison
- Truss,purlin ,Roof sheet fixing on platform floor ,monitor quality of work .
15. Architectural work supervision in station building :
- Brick tiles & ceramics tiles
- Granite installation
- Internal & external window doors ,frame
- Glazed skylight
- Raised access floor
- T-grid & buffle ceiling
- Aluminium Composite Pannel (ACP)
16. Office & site team work coordinate.
17.Measurment sheet prepare for bill prepare .
18. Materials approval document prepare .
19. RIW raise , prepare measurement sheet & close RIW .
Snowtex Group
Dhamrai, Dhaka-1350
Project name: Snowtex Sportswear 6 storied garments building & Utility buildings construction.
Duties/Responsibilities
Duties/Responsibilities
Client: Bangladesh Bridge Authority.
Consultant : Construction Supervision Consultant (CSC).
Alignment length :6.15 k.m.
1. Accommodation work supervision inside the project area by composite materials.
2. Sand filling, brick soling road work supervision.
3. Supervision of pile driving work (Dia 3m, Length 117m-121m).
4. Cofferdam setting work supervision.
5. Soil boring work supervision.
6. Pile top & bottom plug casting.
7. Steel cage setting inside pile .
8. Base grouting work supervision.
9. Pile cap rebar placement and casting.
10. Pier rebar work , casting supervision (13m to 17 m height ).
11. Pierhead and plinth bearing pad construction.
12.Pier , pier head(400-585 cubic meters) and plinth casting.
13. Formwork installation of Pile cap, pier, pier head work supervision .
14.Pier body repair work for hand over purposes.BR15.Official documents control.
16.Meeting with the consultant team.
17. Document control,RFI report update for next day`s work., RFI approval from consultancy team.
Training Summary:
Specialization:
-Result oriented
-Leadership
-Work experience in JAICA project, Chinese project .
-Green building, garments factory building & high rise building project work experience.
- Mega projects work experience
- Familiar with corporate & foreign cultures in work sectors .
Language Proficiency:
Reference (s):
Reference: 01 Reference: 02
Name : Mahamud Hasan Tushar Kawsik Ahammed
Organization : NKDM Association Tekken Corporation -Abdul Monem Ltd.-Abenikko JV
Designation : Project Engineer Lead Engineer
CP 06 Contractor`s office, Farmgate Park, CP 06 Contractor`s office, Farmgate Park,
Address :
Khamarbari, Dhaka Khamarbari, Dhaka
Mobile : 01923803520 01710458160