1. The document outlines eligibility criteria for sole applicant firms for preparation of Detailed Project Reports (DPRs) and project supervision. It includes requirements for experience in DPR preparation and project supervision, annual turnover, use of technology, and qualifications of highway professionals.
2. Firms must have minimum experience preparing DPRs and supervising projects of specific lengths. They are also evaluated based on annual turnover amounts, number of highway professionals employed, in-hand DPR projects, and experience with major bridge structures.
3. Firms are awarded points based on meeting and exceeding criteria for experience, staffing, technology use, and project workload. The maximum total points a firm can receive is 33.
1. The document outlines eligibility criteria for sole applicant firms for preparation of Detailed Project Reports (DPRs) and project supervision. It includes requirements for experience in DPR preparation and project supervision, annual turnover, use of technology, and qualifications of highway professionals.
2. Firms must have minimum experience preparing DPRs and supervising projects of specific lengths. They are also evaluated based on annual turnover amounts, number of highway professionals employed, in-hand DPR projects, and experience with major bridge structures.
3. Firms are awarded points based on meeting and exceeding criteria for experience, staffing, technology use, and project workload. The maximum total points a firm can receive is 33.
1. The document outlines eligibility criteria for sole applicant firms for preparation of Detailed Project Reports (DPRs) and project supervision. It includes requirements for experience in DPR preparation and project supervision, annual turnover, use of technology, and qualifications of highway professionals.
2. Firms must have minimum experience preparing DPRs and supervising projects of specific lengths. They are also evaluated based on annual turnover amounts, number of highway professionals employed, in-hand DPR projects, and experience with major bridge structures.
3. Firms are awarded points based on meeting and exceeding criteria for experience, staffing, technology use, and project workload. The maximum total points a firm can receive is 33.
Sr. Experience of the firm in last 7 years Annual Remarks
No Preparation of DPR Project Supervision/IC Turnover*** . (NH/SH/Equivalent) (NH/SH/Equivalent) 1 The firm should have The firm should have minimum Annual turnover Qualified for (a). minimum experience of experience of Project Supervision (updated average of Aggregate DPR, preparation of detailed / Independent Engineer last 3 years) of Supervision and Project Report/ Feasibility / Authority’s Enginee r/ PMC of the firm from Average Study cum Preliminary Design 2/4/6**- laning / Bridge project of consultancy business Turnover. Report of (i) 2/4/6**- aggregate length equal to 3 times should be equal laning/Bridge project of (i.e.56.31 km) or more. to or more than aggregate length equal to 2 2% of Estimated times (i.e. 37.6 km) or more. Project Cost (i.e. Rs.10.78 cr.) 1 Firm should also have experience of Qualified (b) Project Supervision/ Independent Engineer/ Authority’ Engineer of at least one project of similar category of two/four/six** laning/bridge work of length equal to 40% of project length (i.e.7.51 km). Sub criteria for Experience in use of technology for road inspection Sr. Maximum Description Sub-Points Remarks No. Points Experience in Network Survey Vehicle (NSV) or better 1 7 7 technology for pavement inspection 1.1 Equipment 4 4 (a) Equipment on MOU with Associate or on hiring basis 2 (b) Own Equipment 4 1.2 Experience 3 3 (a) 1-2 projects 1 (b) 3-5 projects 2 (c) >5projects 3 Experience in Falling Weight Deflectometer (FWD) or better 2 4 4 technology for pavement strength measurement 2.1 Equipment 2 2 (a) Equipment on MOU with Associate or on hiring basis 1 (b) Own Equipment 2 2.2 Experience 2 2 (a) 1-3 projects 1 (b) > 3 projects 2 Experience in Mobile Bridge Inspection Unit or better 3 5 5 technology for bridge inspection 3.1 Equipment 2 2 (a) Equipment on MOU with Associate or on hiring basis 1 (b) Own Equipment 2 3.2 Experience 3 3 (a) 1-2 projects 1 (b) 3-5 projects 2 (c) 5 projects 3 4 Experience in Retro reflectometer technology 4 3 4.1 Equipment 2 2 a) Equipment on MOU with Associate or on hiring basis 1 (b)Own Equipment 2 4.2 Experience 2 (a)1-3 projects 1 1 (b)> 3 projects 2 Total 20 19 1. Evaluation Criteria for Assessment of Experience of the Firm.
Reference/Details of Marks self-
S. No. Description Max. projects Claimed for assessed by Marks self-assessment the bidder 1 Average Annual Turnover (last 3 years) from 2 Turnover more than 2 consultancy business 40 Cr. < 10.78 cr (2% of TPC) – 0 marks Rs. 10.78 cr – 1.5 marks Add for additional turnover 0.25 (Zero point two five) marks for every Rs. 5.39 cr (1% of TPC) of above Rs.10.78 cr (2% of TPC) subject to maximum 0.5 marks. 2 Nos. of Highway Professionals with the firm * 10 15 Nos. of Highway 2.1 <10 0 Professionals on 2.2 10-20 8 Infracon 8 2.3 >20 but ≤30 9 2.4 >30 10 *The professionals who possess degree in Civil Engineering/Transport Planning /Transport Economics/Traffic Management / Geology/ Environment Science or Engineering and 8 years experience in highway/bridge /tunnel with employment in the firm for more than one year. The current Employment Certificate shall be uploaded by Key Personnel on INFRACON. 3 Experience as Independent Engineer/ Authority 10 5 projects 10 Engineer/ Construction Supervision in Number of Highway Projects of 2/4/6-laning** of length equal to 40% i.e. 7.51 km of project length of similar category for which RFP invited of 2/4/6** laning or more in last 7 years. 1 project – 8 marks Add 0.5(zero pint five) mark extra for completed assignment of supervision consultancy subject to maximum 2 (Two) marks. 4 Experience in DPR/Feasibility Study cum 5 5 projects 5 Preliminary Design Report preparation for Number of Highway Projects of 2/4/6-laning** of length (40% i.e. 7.51 km of project length) or more in last 7 years. 1 project – 4 marks Add 0.5 (Zero point five) marks extra for each additional project subject to maximum 1 mark. 5 In hand DPRs of Highway/Bridge/Tunnel Projects 10 (presently under progress) 5.1 <2 0 2 Nos in hand DPR 5 5.2 2-5 5 5.3 >5 10 6 Experience in Construction Supervision/DPR/Design 3 3 Review of Major structures having length of more than 500 meter in last 7 years. 1 project – 2.0 marks Add 0. 5 (Zero point five) marks extra for each additional project subject to maximum 1.0 marks Total 33