A). Eligibility criteria for sole applicant firm.

Sr. Experience of the firm in last 7 years Annual Remarks


No Preparation of DPR Project Supervision/IC Turnover***
. (NH/SH/Equivalent) (NH/SH/Equivalent)
1 The firm should have The firm should have minimum Annual turnover Qualified for
(a). minimum experience of experience of Project Supervision (updated average of Aggregate DPR,
preparation of detailed / Independent Engineer last 3 years) of Supervision and
Project Report/ Feasibility / Authority’s Enginee r/ PMC of the firm from Average
Study cum Preliminary Design 2/4/6**- laning / Bridge project of consultancy business Turnover.
Report of (i) 2/4/6**- aggregate length equal to 3 times should be equal
laning/Bridge project of (i.e.56.31 km) or more. to or more than
aggregate length equal to 2 2% of Estimated
times (i.e. 37.6 km) or more.
Project Cost (i.e.
Rs.10.78 cr.)
1 Firm should also have experience of Qualified
(b) Project Supervision/ Independent
Engineer/ Authority’ Engineer of at
least one project of similar category
of two/four/six** laning/bridge work
of length equal to 40% of project
length (i.e.7.51 km).
Sub criteria for Experience in use of technology for road inspection
Sr. Maximum
Description Sub-Points Remarks
No. Points
Experience in Network Survey Vehicle (NSV) or better
1 7 7
technology for pavement inspection
1.1 Equipment 4
4
(a) Equipment on MOU with Associate or on hiring basis 2
(b) Own Equipment 4
1.2 Experience 3
3
(a) 1-2 projects 1
(b) 3-5 projects 2
(c) >5projects 3
Experience in Falling Weight Deflectometer (FWD) or better
2 4 4
technology for pavement strength measurement
2.1 Equipment 2
2
(a) Equipment on MOU with Associate or on hiring basis 1
(b) Own Equipment 2
2.2 Experience 2
2
(a) 1-3 projects 1
(b) > 3 projects 2
Experience in Mobile Bridge Inspection Unit or better
3 5 5
technology for bridge inspection
3.1 Equipment 2
2
(a) Equipment on MOU with Associate or on hiring basis 1
(b) Own Equipment 2
3.2 Experience 3
3
(a) 1-2 projects 1
(b) 3-5 projects 2
(c) 5 projects 3
4 Experience in Retro reflectometer technology 4
3
4.1 Equipment 2
2
a) Equipment on MOU with Associate or on hiring basis 1
(b)Own Equipment 2
4.2 Experience 2
(a)1-3 projects 1
1
(b)> 3 projects 2
Total 20 19
1. Evaluation Criteria for Assessment of Experience of the Firm.

Reference/Details of Marks self-


S. No. Description Max.
projects Claimed for assessed by
Marks
self-assessment the bidder
1 Average Annual Turnover (last 3 years) from 2 Turnover more than 2
consultancy business 40 Cr.
< 10.78 cr (2% of TPC) – 0 marks Rs.
10.78 cr – 1.5 marks
Add for additional turnover 0.25 (Zero point two
five) marks for every Rs. 5.39 cr (1% of TPC) of
above Rs.10.78 cr (2% of TPC) subject to
maximum 0.5 marks.
2 Nos. of Highway Professionals with the firm * 10 15 Nos. of Highway
2.1 <10 0 Professionals on
2.2 10-20 8 Infracon 8
2.3 >20 but ≤30 9
2.4 >30 10
*The professionals who possess degree in Civil Engineering/Transport Planning /Transport
Economics/Traffic Management / Geology/ Environment Science or Engineering and 8 years
experience in highway/bridge /tunnel with employment in the firm for more than one year. The
current Employment Certificate shall be uploaded by Key Personnel on INFRACON.
3 Experience as Independent Engineer/ Authority 10 5 projects 10
Engineer/ Construction Supervision in Number of
Highway Projects of 2/4/6-laning** of length equal
to 40% i.e. 7.51 km of project length of similar
category for which RFP invited of 2/4/6** laning
or more in last 7 years.
1 project – 8 marks
Add 0.5(zero pint five) mark extra for completed
assignment of supervision consultancy subject to
maximum 2 (Two) marks.
4 Experience in DPR/Feasibility Study cum 5 5 projects 5
Preliminary Design Report preparation for
Number of Highway Projects of 2/4/6-laning**
of length (40% i.e. 7.51 km of project length)
or more in last 7 years.
1 project – 4 marks
Add 0.5 (Zero point five) marks extra for each
additional project subject to maximum 1 mark.
5 In hand DPRs of Highway/Bridge/Tunnel Projects 10
(presently under progress)
5.1 <2 0 2 Nos in hand
DPR 5
5.2 2-5 5
5.3 >5 10
6 Experience in Construction Supervision/DPR/Design 3 3
Review of Major structures having length of more
than 500 meter in last 7 years.
1 project – 2.0 marks Add 0. 5 (Zero point five)
marks extra for each additional project subject to
maximum
1.0 marks
Total 33