Project Title- Online Condition Monitoring System for Raw Mill Gearbox
We have installed planetory Gear Box of tyes KMPS656 and KMPS396 in VRM'S -Raw
mills.These are heavy duty gear box and are MOST CRITICAL equipment directly affec
Brief
.Maintenance of theseGear Box is complex and time consuming .These type of Gear B
Justification
Monitoring System to continuous monitor ,trend and evalute vital parameters like tem, F
with tripping and interlocks in order to identify abnormalities timely and avoid Breakdow
Impact Assessment
Benefit /
(attach separate Sheet for detailed calculation / Payback etc., if an
Results
Impact on Environment NIL
Any adverse Effect NIL
control measure for adverse
NIL
effect
Minimal lead times for proper
Source for defining
absorption of new technological N.A.
lead time
changes
Scope for Horizontal Replication In Clinker Mills and Coal Mills
Sources * In-house Modification / Magazine, Internet / Supplier / Why-Why / Sister Unit etc.
ment Ltd.
ment Works
FICATION SHEET
Equipment /Area: Raw Mill Gear Box
Date 25.07.13
10
11
REVIEWED APPROVED
UltraTech Cement Ltd.
Unit : Kotputli Cement Works
PROPOSAL FOR BLOCK SANCTION
Subcommittee- Technology Management Date
DEPARTMENT/AREA Mechanical-1
LINE NO (I or II) 1
DETAILS & JUSTIFICATION We have installed planetory Gear Box of tyes KMPS656 and KMPS396 in VRM'S
These are heavy duty gear box and are MOST CRITICAL equipment directly affe
Gear Box is complex and time consuming .These type of Gear Box Must have O
monitor ,trend and evalute vital parameters like tem, Flow ,Vibration Torque w
identify abnormalities timely and avoid Breakdown.
Social impact
(Please state if the project has any NA
adverse impact on Community )
Without CDM
ESTIMATED COST (Net Block) Rs/lacs 5600000.00
GROSS SAVING Rs/lacs 0.00
.. 2..
Breakup of cost estimates
2 EXECUTION COST
a Consultancy
b Contractor cost
Mechanical
Electrical
Instruments
Civil
Any other (to specify)
Total 'b' 0.00
d Hiring of Resources
Cranes/Transport
Any other
e Contingency
Total 2 (a to e) 0.00 0
5 Declaration :
i) Included in Purta/Not included in Purta NO
ii) Shutdown Period required for commissioning N.A.
iii)Additional power consumption _____________ Unit/P. A. NIL
iv) This block will comply with new Enviornmental Norms YES
v) This Block will not create any saftey Hazards. YES
SCHEDULE
a. Sanction
b. Ordering period 25.8.2013
c. Expected date of receipt at site 20.02.2014
d. Civil work N.A.
e. Erection and commissioning 31.03.2014
( FUNC- HEAD -TECHNICAL) (FUNC- HEAD (F&C)) (UNIT HEAD) (CMO (MFG.))
…03…
COST ESTIMATION SHEET
1 MATERIAL COST
(a) Mechanical
SN Item Description and qty Supplier Basic cost ED
0.00
Total
(b) Electrical
SN Item Description and qty Supplier Basic cost ED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(c) Instrumentation
SN Item Description and qty Supplier Basic cost ED
0.00
(d) Others
SN Item Description and qty Supplier Basic cost ED
0.00
0.00
(e) Civil
SN Item Description Qty Amt (Rs/lacs)
Total 0.00
CALCULATION OF SAVINGS
Gross Saving
Enclosed
Total
ent Ltd.
nt Works
CK SANCTION
Date:-05.08.2014
ystem
D TECH. CELL)
(CMO (MFG.))
Amount Rs/lacs
Sales tax Frt & Ins. Less modvat Net Cost
0.00 0.00 0.00
5600000.00
Amount Rs/lacs
Sales tax Frt & Ins. Less modvat Net Cost
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00
Amount Rs/lacs
Sales tax Frt & Ins. Less modvat Net Cost
0.00 0.00 0.00
0.00
Amount Rs/lacs
Sales tax Frt & Ins. Less modvat Net Cost
0.00 0.00 0.00
0.00 0.00 0.00
0.00
Mechanical
Electrical
Instrumentation
Civil
Total 0.00
* Details sheet can be attached.
Rs/lacs
0.00
CO2 in Tons
0.00
UltraTech Cement Ltd.
Unit : Kotputli Cement Works
BAR CHART
Subcommittee- Technology Management
Project Title:-
Sr no Activity 1 2 3 4 5 6 7 8
P
1 Ordering of Material A
P
2 Recipt of material from Supplier A
P
3 Installatiuon and commisssioning A
P
4
A
P
5
A
P
6
A
P
7
A
P
8
A
P
9
A
P
10
A
P
11
A
Cement Ltd.
li Cement Works
CHART
Date:- 15.08.2014
Month
Aug-13
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5
Month
Feb-14
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
Month
Mar-14
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
30 31
UltraTech Cement Ltd.
Unit : Kotputli Cement Works
SAVING CALCULATION
Subcommittee- Technology Management Date:-15.08.2014
Project Title:- Online Condition Monitoring System
Description
NOT APPLICABLE
08.2014
UltraTech Cement Ltd.
Unit : Kotputli Cement Works
TRAINING IDENTIFICATION AND IMPLEMENTATION
Subcommittee- Technology Management Da
Project Title:-Online Condition Monitoring System
Training Identified:- Training about DALOG system and its diognasis.
Sr. No Employee name Designation/Grade
1 Satish Bakliwal Sr. Manager
2 Suraj Sharma Sr. Manager
3 Ranjeet Kumar Engineer
4 Lalit Pokharna Sr. Engineer
5 Prashant Sharma Engineer
6 Kulvinder Singh Supervisor
7 Dharmesh Thakur Sr. Manager
8 Ajay Roy Sr. Manager
9
10
11
12
13
14
Tech Cement Ltd.
Kotputli Cement Works
CATION AND IMPLEMENTATION
Date:-19.03.2014
s diognasis.
Training Description Date of Training Remark
Operational training 19.03.2014
Operational training 19.03.2014
Operational training 19.03.2014
Operational training 19.03.2014
Operational training 19.03.2014
Operational training 19.03.2014
Operational training 19.03.2014
Operational training 19.03.2014
UltraTech Cement Ltd.
Unit : Kotputli Cement Works
SAFETY, PROCEDURE
Subcommittee- Technology Management Date:-15.03.2
Title:-Pre-Start-Up Safety Review (PSSR)
Reference Document Number: KCW/SAFETY/SS/ PSSR
Above reference document number should be refer
Description of Changes :
No change
No hazards identified ?
Yes
Other requirements :
a. Special training required?
No
Authorization to proceed :
Sign.
No change
Not Applicable
Temporary For how long?
Yes
N.A.
15.03.2014
No
No
No
No
Yes
Mechanical
Yes
Electrical:
Not Required
Instrumentation: Yes
Safety
Not required
Yes
Not Required
Yes
Not required
14.03.2014
Date of installation of machinery / asset
Work completion /Installation report no./ Commissioning date 14.03.2014
(Issued by supplier)
Certificate of Installation
We do hereby certify that all the facts mentioned above are true & we have completed the installation of th
machinery successfully.
Prepared by Approved by
Designation Project in Charge Department Head
Signature
Date
Signature of SH
port
Date:-19.03.2014
Appendix No : 6
w Mill
0RM0110
0234.00
14.03.2014
14.03.2014
pleted the installation of the said
Approved by Approved by
Department Head FH/Unit Head
ssued by supplier
Entered ON :
Signature of SH Accounts
MODEL EQUIPMENT DEVELOPMENT CRITERIA
Sr. Adv Model
Attribute Model
No. Eqpt
BASIC CONDITION ELEMENTS
1 Availability of Safety equipment such as Fire extinguisher, Alarms, N.A.
Sand buckets etc., if necessary.
2 Employees are trained on safety aspects and they are using YES
appropriate PPEs
3 Abnormality free area / Equipment. 75% 100%
4 Machine guarding is properly done YES
5 Cleanliness is maintained on equipments & surrounding YES
6 There is a place defined for everything and everything is in its YES
designated place
7 SOPs, Trouble shooting, Cleaning/ Inspection Standards, are YES
displayed and being used
8 Visuals such as Area Owner, Activity Schedule, Flow directions, YES
Match Marks, Level Indicators,PPE's, Walkways, Inspection Route
etc. are developed, displayed and used.
9 Display of Equipment Specification (Know your equipment) YES
10 Display of Process / Layout etc. YES
SYSTEMS & PROCESSES
1 Capturing of abnormaility & recording in register YES
RESULT INDICATORS
1 Reduction in Model equipment downtime N.A.
Page 35 of 42
MODEL EQUIPMENT DEVELOPMENT CRITERIA
Sr. Adv Model
Attribute Model
No. Eqpt
4 Improvement in pollution control N.A.
BEHAVIORAL ASPECTS
1 Awareness of concept within team members YES
Page 36 of 42
PROPOSED SAVINGS
Compressor Controller
Total Daily Energy Consumption KWH/ Day
Projected Guaranteed Electric Energy Savings (8%) KWH/ Day
Power cost Rs/KWH
Daily Energy Cost Savings (@ Rs. 4.44/unit) Rs/ Day
Running Days Days
Annual Energy Cost Savings (@ 330 days) Rs
Proposed savings in Rs lacs
22611
1808
4.44
8031
330
2650230
26.50
ACTUAL SAVINGS
onitoring System
kwh /day N.A.
kwh /day N.A.
kwh /day N.A.
Kwh N.A.
Rs/KWH N.A.
Rs N.A.
N.A.
Project Review and Feed Back
1 Project Background Overview / Project definition
1.1 Project Overview
(Give a very brief summary of the project outlining the planned
objectives)
1.2 Project dates
(Dates from project initiation to completion; enter major
milestone dates such as design completion, product release
etc.)
1.3 Project Organization
List all project participants including Project team members
and sponsors (and their roles within the project).
2.3 List any project deviations (in terms of scope, time resources,
cost, delays) and reasons for deviations.
2.4 Were the quality objectives met (if applicable)?
2.5 List project models, methods, tools or processes used.
2.6 Minimal lead times for proper absorption of new technological
changes
3 Project Experiences / Observations
3.1 Were there any unexpected impacts (positive or negative)?
Yes
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
Comments
N.A.
N.A.