Professional Documents
Culture Documents
Quick Guide 7272012 B
Quick Guide 7272012 B
CityofChicago
www.cityofchicago.org/restaurant
RESTAURANT QUICK GUIDE TO LICENSES, PERMITS & INSPECTIONS
The information in this guide will save you time by showing you what you’ll need in advance and which City agencies
can assist you. Since each business is unique, this information serves only as a guide and is subject to change. If you
have any questions, please contact us at restaurant@cityofchicago.org and we will be glad to help.
your legal entity (i.e., Limited Partnership (LP), Limited Liability Partnership (LLP), Limited BACP City Hall, Room 805
or make an appointment
Liability Corporation (LLC), Corporation, or Not-for-Profit Corporation (NFP)). There are several by calling 312-744-2086.
resources available to help you:
(See C-1 for the BACP
1) Visit the Small Business Solution station every Tuesday (business counseling), Wednesday Small Business Solution
(legal assistance) and Thursday (financial assistance/loans) and get free business Station flyer for more
information)
counseling from our trusted non-profit partner agencies.
2) Visit your local Chamber of Commerce, who can assist you on developing business plans
(see C-5 of the Restaurant Start-up Guide for a list of Chambers of Commerce and other
delegate agencies in the city of Chicago)
3) Visit the business library at Harold Washington Library, 400 S State St. 4th floor
2 Prepare for Initial Consultation with BACP Business Consultant Helpful Hint
Schedule an appointment with a BACP consultant by either calling 312-74-GOBIZ or Your local Alderman’s
office and Chamber of
visiting www.cityofchicago.org/restaurant Commerce have lists of
available sites.
Prior to meeting with a BACP consultant, fill out the Restaurant Start-up Worksheet (see
pg 7 of the guide). Additional copies are available at www.cityofchicago.org/restaurant
and BACP
x Describe your restaurant activity (e.g., liquor, fast-food)
x Identify potential sites and bring photos, if available (note: photos do not need to
be printed out. They could be on your camera or phone)
x Check whether your potential sites have outstanding building violations. Go to
If there is an outstanding
www.cityofchicago.org/dob > Look Up Building Permits, Inspections and
violation, the permitting
Violations Online and licensing process may
be delayed until the
Obtain a Chicago Food Service Sanitation Certificate violation is cleared. You
could be financially
All restaurants are required to have at least one employed person on the premises at all
responsible for correcting
times who has a valid City of Chicago Food Service Sanitation Certificate. At the time of any violations.
application, one must provide proof of Sanitation Certificate. (see C-10 of the Restaurant
Start-up Guide for a list of training providers)
Register with the appropriate government entity (see C-3 of the Restaurant Start-up
Guide for more information)
x If you plan to do business as a Sole Proprietor or General Partnership in Illinois,
under an assumed name (a name other than your own), obtain an Assumed Name
Certificate from the Cook County Clerk’s Office
x Obtain a State of Illinois File Number through Illinois Secretary of State
x Obtain Federal Employer Identification Number (FEIN) through Internal Revenue
Service (IRS)
x Obtain an Illinois Department of Revenue (IDOR) Account ID (formerly IBT#)
through IDOR
During your appointment with a BACP consultant, the consultant will guide you through
the entire process, which will include checking for potential location restrictions,
determining any Public Way Use permit requirements, and discussing food safety
requirements.
x If applying for a liquor license, include floor plans and plat of survey for zoning Even if you are not doing
any construction, you will
approval (see D-1 of the Restaurant Start-up Guide for examples) need to submit a site plan
x If your establishment’s occupancy will be more than 100 or you will be applying and a floor plan. See D-1
for examples.
for a liquor license, submit an application for occupancy capacity signs for zoning
approval. (see form 2 in the Restaurant Start-up Guide)
If applying for a liquor license or a Public Place of Amusement (PPA) license, you must
meet location restrictions. For example, your restaurant has to be more than 100 feet (or
200 feet, if applying for PPA) away from a library, church, school, hospital or home for the
aged or indigent (see F-5 and F-11 of the Restaurant Start-up Guide for detailed
information on restrictions and regulations). Submit a payment of $250 to BACP for an
on-site location approval. This fee will be credited toward your license fee. This approval Chicago Department of
will be valid for one year from the date of approval. Revenue
33 N. LaSalle Street
Suite 700
Outstanding Debt - Any outstanding debts to the City owed by the business owner or an 312-744-7275 or
officer of the business must be paid before a license can be issued. These debts include pay online at
www.cityofchicago.org/finance
past due parking tickets, water bills, child support payments, or any other type of
administrative hearing fines imposed by the City. This also includes Illinois Sales Tax
owed. If you have debt, you may apply for a license; however, a license will not be issued
until all debt has been paid or you enter into a payment plan with the City. To find out if
you have any debt and to find out about payment options, visit the Chicago Department
of Revenue.
4 Obtain Building Permits– If construction or alterations are necessary
Helpful Hint
Once zoning has approved your architectural plans and location, the Department of To avoid delays, you
Buildings will review your architectural plans. You should have already submitted the should begin license
application concurrently
following through e-plan (see E-11 of the Restaurant Start-up Guide for E-plan User
with permit application.
Guide):
x Zoning approved architectural plans
x Kitchen equipment specifications and menus. (see E-3 of the Restaurant Start-up
Guide standard plan process checklist)
If you are using a self-
Once plans have been approved, a building permit will be issued. certified architect, you
are strongly encouraged
5 Complete License Application to request an on-site food
consultation. To schedule
Once zoning has approved your plans and location, submit your completed application for your on-site consultation,
email
a retail food establishment license to BACP either online or in-person. You will also need restaurant@cityofchicago.org
to submit:
x Business Information Sheet (BIS) (see form 3 in the Restaurant Start-up Guide)
x Lease or proof of ownership of the property
x Chicago Food Service Sanitation Certificate
Helpful Hint
If applying for a liquor license, begin your liquor license application. The liquor license
application can only be completed in-person (see section F-1 through F-10 of the City of Chicago Business
Licenses are non-
Restaurant Start-up Guide for a detailed list of all requirements, including eligibility transferable. Each
requirements) restaurant and each
x Submit zoning-approved occupancy capacity sign application location must have its
own license in order to
x Submit proof of liquor liability insurance and a Beverage Alcohol Sellers and operate.
Servers Education and Training (BASSET)
x Schedule fingerprint-based criminal background check for any person with 5% or
more ownership
If applying for a Public Place of Amusement (PPA) license, begin your PPA license
For more information on
application. The term PPA includes but is not limited to bowling alleys, businesses with 2+
BASSET training, visit
pool tables, nightclubs and dance clubs, and karaoke. PPA licenses application can only be Illinois Restaurant
completed in-person. It is important to note that there are additional zoning and location Association.
www.illinoisrestaurants.org
restrictions (see F-11 of the Restaurant Start-up Guide for a detailed list of requirements)
5a If your site requires Public Way Use or other permits, begin the application process with
your BACP consultant. There are six (6) major types of use permits:
1. Sign installation permit - If you are installing a sign, submit a sign permit
application to DOB (see form 4 in the Restaurant Start-up Guide)
2. Signs, canopies, and/or lights - If the site will have signs, or canopies, that will
project into a public way, submit the application to BACP (see G-11 of the
Restaurant Start-up Guide for Public Way Use Bundle Permit Application and
form5) Helpful Hint
3. Sidewalk café – If you are planning to have a sidewalk café, submit an application Any use permit on public
to BACP (see G-25 of the Restaurant Start-up Guide for Sidewalk Café way requires City Council
Application Information Package and form 6) approval and the
application process may
4. If your site has a driveway, you must get a driveway permit (see G-53 of the take from 60-120 days.
Restaurant Start-up Guide for the application process and form 7 for an Begin this process as early
as possible to prevent any
application)
delays.
5. If you do not have approved alley access for deliveries, your site needs a loading
zone to load and unload deliveries. Submit a loading zone permit application to
your alderman’s office (see G-51 of the Restaurant Start-up Guide)
6. If your site needs a standing zone for non-commercial vehicles (e.g., drop-off and
pick-up), submit a standing zone permit application to your alderman’s office (see
G-51 of the Restaurant Start-up Guide)
Make your final payment and prepare for inspections
x If you are not applying for a liquor license, the Department of Public Health will
contact you within 3 days of payment to schedule an inspection. The inspector Helpful Hint
will not come until you have confirmed that you are ready. If a business is found to
x If you are applying for a liquor license, you will schedule a license taskforce be operating without a
inspection through your BACP consultant. The taskforce inspection includes Retail Food Establishment
License or other required
inspectors from BACP, Department of Buildings, Department of Fire, and the
city license a Cease and
Department of Public Health. On the day of the inspection, the taskforce will Desist Order will be
arrive within a 3-hour window. issued and the operations
will be close immediately.
6 Building Inspections – If construction is necessary
We are excited to offer a team-based building inspection for your restaurant construction.
Previously offered only to larger buildings, this service is now available for any restaurant
undergoing construction.
Prior to constructing your kitchen, schedule a free, optional on-site food consultation to
ensure that your kitchen construction meets all relevant health codes. To schedule your
on-site consultation, contact restaurant@cityofchicago.org.
To schedule the team-inspection option, refer to E-2 of the Restaurant Start-up Guide for
instructions. You will also have the option of scheduling individual inspections but these
requests can take longer to accommodate.
Fire inspectors will visit your facility and check for safety measures. Their primary concern is If you conducted any
verifying that you have proper exit structures in case of an emergency. They will verify that construction, all permits
stairs, chimney, heating, and duct systems are in good condition and that aisles and exits are must have passed final
inspections prior to
easily accessible and all fire extinguishers are in good working order.
license inspections.
Below are a few of the more common reasons why applicants fail fire inspections:
x Inadequate water supply for the automatic sprinkler system
x Impaired or non-existent access to elevators or man hoists
x Combustible construction debris or trash onsite
x Non-working, non-illuminated exit and stairs signs
x Storage under stairs
x Storage around heat-producing appliances
x Extinguishers that are not charged and/or tagged from current year’s inspection
x Blocked aisles and exit areas/doors
x Accumulation of debris that creates a potential fire hazard
x Lack of panic bar on locked exits
Building Inspection (SIP) – Liquor License and Occupancy Capacity Sign (for a detailed
building inspection (SIP) checklist, see H-2 of the Restaurant Start-up Guide)
Below are a few of the more common reasons why applicants fail building inspections:
x Structural defects (Roof, walls or floor joists need repair, etc.)
x Undersized exit doors, corridor width or stairways
x Insufficient number of exits or improper swing of the exit door
x Locking devices on exit doors
x Lack of exit signs or emergency lighting
x Lack of stamped, approved plans on construction site
x Open building permits (i.e., final inspections not completed and passed)
BACP Inspection – Incidental Liquor License for Restaurants and Tavern (for a BACP
inspection checklist, see H-5 of the Restaurant Start-up Guide)
Below are a few of the more common reasons why applicants fail BACP inspections:
x The layout of the restaurant does not meet requirements of Incidental-Consumption
on Premises license
x Restaurant floor layout does not match the floor plan that was approved and
submitted to BACP and zoning
x Public Notice of Liquor License Application is not visibly posted
Health Inspections (Food Protection) – Retail Food License (for a detailed list of
requirements, see H-7 of the Restaurant Start-up Guide for a complete guide to health
inspection)
Chicago Department of Public Health inspects your facility to ensure food safety and proper
sanitation. Inspections focus on food-handling practices, proper temperatures, personal Helpful Hint
hygiene, facility maintenance, and pest control. For the inspection, you or a person with a
Refer to pg 24 of the
food sanitation certificate must be present at the time of inspection.
Health Inspection Guide
Below are a few of the more common reasons why applicants fail the initial health inspection: for a readiness checklist.
BUSINESS ACTIVITY
Prepare food on premises: Yes No If yes, type of food __________________________________
Outdoor seating:
Patio: Yes No
Wholesale: Yes No
By signing below, I understand that any changes to business activity may impact licensing and zoning approvals. I
will notify BACP and zoning of those changes.
Signature
7
LOCATION
_______________________________________________________________________________
City State Zip Code Most Recent Use of Space
_______________________________________________________________________________
City State Zip Code Most Recent Use of Space
_______________________________________________________________________________
City State Zip Code Most Recent Use of Space
*Go to www.cityofchicago.org/buildings > Look Up Building Permits, Inspections, and Violations Online
8
REGISTER WITH APPROPRIATE GOVERNMENT ENTITIES
If you plan to do business as a Sole Proprietor or General Partnership in Illinois under an assumed
name (a name other than your own), you will need to obtain an Assumed Name Certificate from the
Cook County Clerk’s Office. You may register:
x Online by downloading and printing an application: www.cookctyclerk.com > Vital Records
> Assumed Business Name Registration;
x By mail: Bureau of Vital Records, Attn: Assumed Name Unit, P.O. Box 642570, Chicago, IL,
60664-2570; or
x In-person: Bureau of Vital Records, Assumed Name Unit, 50 W. Washington, West
Concourse Level, Suite 114, in Chicago.
Please call Cook County Clerk’s Office at 312-603-7790 for more information.
If you plan to do business as a legal business entity in Illinois, regardless of if you are based in
Illinois or not, you will need to register with the Illinois Secretary of State:
x Illinois based businesses may file a new application as a Limited Partnership (LP), Limited
Liability Partnership (LLP), Limited Liability Corporation (LLC), Corporation, or Not-for-Profit
Corporation (NFP). You will be provided a State of Illinois File Number, which you will need
to provide on your license application.
x Businesses not based in Illinois are considered “foreign” and must file an application for
authority to transact business in Illinois. You will be provided a State of Illinois File Number,
which you will need to provide on your license application.
Register:
x Online: www.cyberdriveillinois.com > Business Services;
x By mail: 501 S. 2nd St., Room 350, Springfield, IL, 62756; or
x In-person: 69 W. Washington, Suite 1240, in Chicago.
Please call Illinois Secretary of State’s Office at 312-793-3380 for more information.
Obtain a Federal Employer Identification Number (FEIN)
A Federal Employer Identification Number (FEIN) is also known as a Federal Tax Identification
Number, and is used to identify a legal business entity. Businesses are required to obtain a FEIN
to file and pay any federal tax obligation.
You may register for a FEIN with the United States Internal Revenue Service (IRS):
x Online @ www.irs.gov > Businesses > Employer ID Numbers (FEINs);
x By mail @ Internal Revenue Service, Attn: EIN Operation, Cincinnati, OH, 45999; or
x In-person @ 230 S. Dearborn, in Chicago.
9
Obtain an Illinois Department of Revenue (IDOR) Account ID (formerly Illinois Business Tax Number
(IBT))
You must register with the Illinois Department of Revenue if you conduct business in Illinois or
with Illinois customers. This includes sole proprietors (individual or husband/wife), and all legal
business entities, including exempt organizations, who plan to hire employees, buy or sell
products wholesale or retail, or manufacture goods.
10
OVERVIEW OF BUILDING PERMIT PROCESS
A building permit is required to ensure that the project you are constructing conforms to the minimum
standards of the Chicago Building Code. The Chicago Building Code exists to safeguard the public health,
safety and welfare.
If you are repairing existing elements on any buildings, you can use the Easy Permit Process.
If your project requires architectural drawings, then you must obtain proper building permits and go
through the Standard Plan Review.
The Standard Plan Review (SPR) process is intended for small to mid-size new construction and
alteration projects. Architectural drawings prepared by a licensed architect are required. Building
permit applications must be created online and architectural plans must be submitted online via e-
plan. Projects meeting the following criteria are eligible for SPR:
Only architects, structural engineers and expediters can submit building permit applications for the
SPR process. These individuals must sign up for a City of Chicago login account. The login account will
allow them to submit a permit application online. Architects and structural engineers must hold a
current State of Illinois license. Expediters must hold a current City of Chicago Expediter License.
11
WHEN DO I NEED A BUILDING PERMIT?
Disclaimer: This list is indicative only and non-exhaustive. For more information, go to
www.cityofchicago.org/buildings
Types of Projects That Require Permits A building permit is NOT required for the
following repair or replacement work:
x Additions – room, upper floor, expansion to
next unit x Interior finishes such as carpet, hardwood
x Attic – finish, renovate flooring, tile, paint and wallpaper
x Basement – finish, renovate x Interior non-fire rated ceiling tiles
x Boiler – install, replace (excluding grid)
x Carport – install, replace x Cabinetry and furniture without electrical
x Chimneys – replace, erect and plumbing connections
x Conversion of units – single to multiple, or x In-kind replacement of non-fire rated
multiple to single interior doors
x Deck – build, replace x At grade non-combustible walkways and
x Demolition – garage, home, building patios
x Driveways – installation x Fences max. 5’-0” high on private property
x Electrical system – alteration, expansion (excludes landmark buildings and landmark
x Fence – taller than 5 feet, may not exceed 6 districts)
feet. For Landmark buildings only, a permit x Vinyl, aluminum, wood, EIFS or other similar
is needed for any solid fence of any height nonstructural exterior finishes on all one
visible from a public street story buildings except hazardous occupancy
x Furnace – install, replace (excludes landmark buildings and landmark
x Garage – build attached, detached districts)
x Gut rehab – complete modernization x Temporary tents max. 400 sq. ft. that
x Hot Water Heater – install, replace comply with all zoning and construction
x Masonry – replace, install face brick type setback requirements and are not less
x Natural light and ventilation – skylight than 2 feet from all property lines and not
x New Construction – homes, high-rise, retail, less than 6 feet from all residential buildings
business and erected for not more than 60
x Plumbing system – construct, alteration consecutive days
x Porch – build, replace, enclose, renovate
x Security alarm – install
x Siding replacement – For Landmark
buildings only
x Roof – slope less than 5-in-12
x Ventilation system – mechanical, supply
x Windows and exterior doors – For
Landmark buildings only
12
RESTAURANT LICENSE AND ZONING REFERENCE GUIDE
Additional requirements and restrictions apply if your business has any of the following activities
Restaurant Liquor License –
Liquor License – Liquor License – Public Place of
All Restaurants Occupancy More Consumption of Outdoor Patio/Café
Tavern Late Hour Amusement
Than 100 Premises (COP)
(A) (B) (C) (D) (E) (F) (G)
Retail Food Establishment In addition to In addition to In addition to An Outdoor Patio License Businesses wishing to In addition to
License requirements listed in requirements listed in requirements listed in is required to sell remain open beyond the requirements listed in
x Lease or proof of column A, need to apply column A, COP liquor column C, a tavern liquor alcoholic beverages in a regular time of closing (2 column A and C, PPA
a.m. Monday through
ownership of the for occupancy capacity license: license requires: privately owned outdoor requires:
Saturday, and 3 a.m. on
property sign. See form 3 of the x Individual History Form x Inspections by DOB- location adjacent to Sunday) may obtain a x Inspections by
x Tax numbers (Illinois Restaurant Start-up x Spousal Affidavit Plumbing, and DOB- premises with either a Late Hour Liquor License. DOB-Electrical,
and Federal) Guide. x Finger print based Ventilation tavern, or COP license. In In addition to DOB-Plumbing,
x Ownership information criminal background addition to requirements requirements listed in DOB-Ventilation
x City of Chicago Food check listed in column C or D, column C or D, late hour x More than 200 feet
outdoor patio requires liquor license application
Service Sanitation x Manager Statement away from a
requires:
Certificate x Financial Disclosure (for more detailed church, school,
x Registered voter
x Valid photo I.D. Form information see Section hospital, or building
petition
x Department of Public x Certificate of Liquor G-25 of the Restaurant used exclusively for
x Certified mail public
Health inspection Liability Start-up Guide): educational
License notice mailing
x BASSET Certificate x Outdoor floor plan purposes
Requirements x Occupancy capacity sign x Sidewalk Café Permit if
application will be operating on
x Business structure the public sidewalk
documents
x Site and floor plans
x Food service menu
x More than 100 feet
away from a library,
church, school, hospital
or home for the aged or
indigent
x Inspections by BACP,
DOB-SIP, Dept. of Public
Health, and Fire
Otherwise noted, see Section F of the complete Restaurant Start-up Guide for more detailed information. Visit www.cityofchicago.org/restaurant
13
Visit www.cityofchicago.org/zoningmap to check for the zoning designation of your property
Restaurant Liquor License –
14
Liquor License – Liquor License – Public Place of
All Restaurants Occupancy More Consumption of Outdoor Patio/Café 1
Tavern Late Hour Amusement
Than 100 Premises (COP)
(A) (B) (C) (D) (E) (F) (G)
Zoning districts that allow Same as column A Zoning districts that allow Zoning districts that Zoning districts that allow Same as column C or D Zoning districts that
restaurants: restaurants with COP allow tavern liquor outdoor patio/café: allow Banquet Halls: B3,
x B1,B2,B3 liquor license: license: At ground level (e.g., C1, C2, C3, DC, DX, DS
x C1,C2,C3 Limited Restaurant (i.e., x B3* side walk café) Small and medium
Zoning x DC,DX,DS no sit-down bar) – Same x C1, C2, C3 x B1, B2, B3 venues (occupancy
x M1,M2,M3 as column A x DC, DX, DS x C1, C2, C3 smaller than 1,000):
Requirements
x PMD#1B,PMD#2, General Restaurant (i.e., x M1, M2, M3 x DC, DX, DS B1,B2,B3, C1, C2, C3,
PMD#3, PMD#4, with a sit-down bar) – x PMD#1B,#2, #3, #4, Above ground level (e.g., DC, DX, DS
Note: *require PMD#5, PMD#6, #5, #6, #7, #8, #9,
x B3 roof-top patio) For other zoning
special use PMD#7, PMD#8, #10, #11, #12, #13
x C1, C2, C3 x B3* districts, please contact
permits PMD#9, PMD#10, x DC, DX, DS x C1*, C2*, C3* a zoning representative
PMD#11, PMD#12, x M1, M2, M3 New tavern licenses For large venues (more
x DC, DX, DS
PMD#13, PMD#15 cannot be issued to any than 1,000 occupancy) ,
x PMD#1B,#2,#3, #4, #5,
#6, #7, #8, #9, #10, location that is within please contact a zoning
400 feet of existing representative
#11, #12, #13
tavern in a B3 zoning
district
Districts B1, B1.5, B2, C1, C2, M1, M2 – No parking requirement for first 4,000 square feet then 2.5 spaces per 1,000 square feet Districts B1, B1.5, B2,
C1, C2, M1, M2 – 1
Districts B3, C3, M3 – No parking requirement for first 10,000 square feet then 2.5 spaces per 1,000 square feet space per 10 persons
capacity; no parking
Districts B5, C5, M5 – No parking requirement for first 35,000 square feet or 2 x the lot area (whichever is greater), then 1.33 spaces per requirement for live
1,000 square feet theater venues with less
than 150 seats
Parking When calculating your parking space requirements, you must round-up to the nearest whole number (e.g., 1.33 to 2). Districts B5, C5, M5-
Requirements Banquet Halls require 1
space per 10 persons
Note: For properties with multiple businesses, the square footage allotment is shared. For example, if another business has already capacity; for all others,
claimed 3,000 square feet in a B3 district and your restaurant is 2,000 square feet, you will only get a waiver for the first 1,000 square no parking requirement
feet. You will need 3 spaces for your additional 1,000 square feet. for first 35,000 square
feet or 2 x lot area
(whichever is greater)
then 1.33 spaces per
1,000 sq ft
Restaurant Start-Up Same as column A plus: Same as column A plus: Same as column A plus: Application for Side Walk No additional forms Same as column A plus:
Required Worksheet (form 1) Application for Application for Application for Café (form 6) required Application for
Forms Basic Information Sheet Occupancy Capacity Signs Occupancy Capacity Signs Occupancy Capacity Signs Occupancy Capacity
(form3) (form 2) (form 2) (form 2) Signs (form 2)
1
Note: A new PPA license will require a zoning variation if within 125 feet of an R1, R2, or R3 residential zoning district
FIRE DEPARTMENT INSPECTION CHECKLIST
This checklist is neither official nor complete, but is provided for your information to expedite the
correction of most deficiencies found during the Business License Inspection.
An official Fire Code violation notice identifying all deficiencies found during the fire inspection will be
mailed to you within a few days.
Below are a few of the more common reasons why applicants fail fire inspections:
15
BACP INSPECTION CHECKLIST
During the on-site location approval, BACP inspectors will check for the following to determine if any
exterior location restrictions exist that would prohibit issuance of a liquor license.
In order to obtain a liquor license, the property line of your establishment cannot be within 100 ft of:
The property line of any public library except the Harold Washington Library.
The property line of any school other than institutions of higher learning.
The property line of a hospital.
The property line of any home for the aged or indigent persons
The property line of a home for veterans, their spouses, or children.
The property line of a military base or naval station.
Any church. In the case of a church, City policy is that the distance of 100 feet shall be
measured to the nearest part of any building exclusively used for worship services or
educational programs and not to property boundaries. In addition, the fact that a church is
improperly zoned is not a factor in determining whether the church is subject to the 100-foot
prohibition.
Applicant premises for a Tavern license located in a B3 Zoning District cannot be within 400 feet
of an existing licensed tavern (property line to property line measurement).
BACP inspectors will check for the following during a license inspection based on the applicability to
your business:
Incidental-Consumption on Premises activity must be secondary to another licensed activity
(i.e., food service or amusement).
Incidental-Consumption on Premises applicant must have adequate commercial kitchen and
dining facilities when liquor service is intended to be secondary to food (i.e., restaurant).
The outdoor patio location is adjacent to the primary premises and has a perimeter clearly
defined by barriers.
No dwelling or lodging units are accessible by the public directly from the premises (except in a
hotel, private club, or when dwelling unit is occupied by applicant to be licensed).
The majority of applicant's customers may not be children.
Separate and adequate toilet facilities must be maintained for men and women.
Floor plans clearly/completely indicate intended use of areas and match the construction and
layout of premises.
Construction is completed; equipment, fixtures, and furniture are in place according to plans.
Public Notice of Liquor License Application posted within 5 days of making application and
remaining clearly visible from the public way for a full 45-day period after the application date.
16
DEPARTMENT OF BUILDINGS INSPECTION CHECKLIST
If you are applying for certain business licenses, including liquor and public place of amusement, and/or applying
for an occupancy capacity sign (required when the total occupancy by the public is 100 persons or more),
Department of Buildings (DOB) inspectors will inspect your establishment to ensure that the building and
commercial space provide a safe environment for patrons, customers and employees. DOB inspections focus on
the safety of occupants. For example, a building inspector will check to make sure fire separation is included, an
adequate number of exits are provided and are not blocked, and that an occupancy sign/drawing is posted, if
required. Additionally, your license application may require an inspection from a DOB electrical, ventilation, and
or plumbing inspector and other city departments who review your space for compliance to their respective
codes.
A DOB building inspector, from Special Inspections (SIP), will check for the following, based on the applicability to
your business (Disclaimer: The below list is indicative only and non-exhaustive. For more information, including
the “Chicago Building Code” and “Code Clarifications and Interpretations,” go to www.cityofchicago.org/buildings)
Minimum
Capacity
Number of Exits
50 or less 1
51 to 300 2
301 to 1000 3
1000+ 4
A minimum of two exits are required from every building, floor, space or room, except as outlined in
Municipal Code (13-160-050). Also refer to the Municipal Code (13-196-050, 13-88-160, 13-84-170)
Exits must be free of obstructions. Refer to the Municipal Code (13-160-070, 15-4-880)
Where more than one means of exit is required from any room, space or floor of a building, they must be
located remotely from one another
Revolving doors may be used as required exits in occupancies of 100 persons or less. Refer to the
Municipal Code (13-160-270)
The means of exit from one story to another and to an outside exit must be continuous and uninterrupted
From any point in the establishment, the travel distance to the nearest exit must be less than 150 ft
Exit doors must swing in the direction of exit (i.e., swings out from inside to outside). This includes all
doors along the exit path.
Exit doors must be at least 36 inches wide
Exit doors cannot have a key face lockset on the exiting side. This includes no slide-blots or similar
devices.
Exit doors cannot project onto a public way without the use of public way approval and must be protected
with wheel stops/fixed barricade on the alley or parking side. Refer to the Municipal Code (13-160-070,
15-4-090, 15-4-880) See Figure 1
Panic hardware must be installed on exit doors when total capacity exceeds 200
Every exit and its pathway (e.g., public hall and stair well) must be well illuminated
Exits designated with electric, battery back-up, exit signs, in good working order and in a metal frame
housing
17
Stairway Requirements (see Figure 2 for a diagram)
Stairways must be clear of debris and no storage under stairways
Stairways must be constructed of noncombustible materials when occupancy exceeds 100 persons. Refer
to the Municipal Code (13-160-330)
The underside of stairways of combustible stairways (when allowed) must be protected by
noncombustible materials to provide at least 1-hour fire resistance
All stairs and corridors used as exits must be at least 44 inches wide. Stair width is defined as the clear
width of the stair tread used as the walking surface.
x Exception: Stairs and corridors in buildings with a total occupancy of 50 persons or less above the
grade level, shall not be less than 36 inches wide.
If a stairway is used as an exit, it cannot have winder steps; generally wedge shaped.
Vertical height of a flight of stairs between landings or between a floor and a landing must be 9 ft. or less,
when occupancy exceeds 100 persons
The width of a stairway, including the landing, shall not decrease in the line of travel. Refer to the
Municipal Code (13-160-210 and 13-160-310)
Depending on occupancy classification, the height of each stair riser must be 7.5 inches or less and they all
must be equal in height. The minimum width of a tread must be 10 inches. The surface of treads and
landings should not cause danger of slipping. Refer to the Municipal Code (13-160-300). All new stairs
are required to have 7 inch risers and 11 inch treads.
The ends of handrails must be returned and joined into the wall
Height to the top of handrail(s) must be between 34 – 38 inches, measured from the stair tread or floor
x If the width of stairs is less than 44 inches, then a handrail on at least one side must be provided
x If the width of stairs exceeds 44 inches, handrails must be provided on both sides
x If the width of stairs is greater than 88 inches, an intermediate handrail(s) must be provided
Guardrails, installed at a minimum height of 42 inches above the finished floor, cannot have balusters or a
pattern providing a ladder effect. Balusters spaced at 4 inches apart. See Figure 2
Enclosure Requirements
All stairways must be enclosed with wall and partitions providing fire resistance
x A building that is three stories or lower: One-hour rated fire resistance
x A building that is higher than three stories: Two-hour rated fire resistance
Heating plants and boilers must be enclosed by walls, partitions, floors and ceilings
x For occupancies less than 200: One-hour rated fire resistance
x For occupancies over 200: Two-hour rated fire resistance
All assembly rooms
x Capacity under 300: One-hour rated fire resistance
x Capacity over 300: Two-hour rated fire resistance
To prevent spread of fire from floor to floor, all stairs, shafts and openings in floors and roof must be
enclosed
Basements with a capacity of over 100 persons, in restaurants and nightclubs, must be sprinklered
Class A fire doors or shutters installed on both sides of openings in a fire wall
Class B fire doors provided at openings in vertical shafts, stair wells, and other openings
Minimum one hour fire resistant ceiling provided between basement and first floor
Fire doors cannot be propped open
Miscellaneous Requirements
Proper building permits must be present for any construction and have received final construction
approvals from the required inspection trades; as well as Certificate of Occupancy letter issued (if
required for that permit)
18
Foundation must be sound (e.g., no cracks)
Exterior facade must be in sound condition (e.g., no tuck pointing required)
Fire extinguishers must have up-to-date tags and be properly charged
One carbon monoxide detector must be installed on every floor
Curtains, scenery, and decorations shall be flame retardant for occupancies over 100 persons. Refer to
the Municipal Code (15-4-620)
The building must not have any structural problems (e.g., ceilings, floors, and roof are in good condition)
Occupancy capacity sign is correct and properly displayed with the city approved and stamped drawing
belonging to that specific issued occupancy capacity sign; the current physical space/layout must match
that drawing. Exit diagrams must be posted for public places of amusements. Refer to the Municipal
Code (13-84-400 and 4-156-380)
19
Figure 1: An Example of Exit Requirements
Front View Overhead View
Wheel Stop
Parking
No locks in the
Panic hardware if direction of exit
capacity exceeds 200
Wheel Stop
PUSH TO OPEN. ALARM WILL SOUND Parking
Exit Width:
Min. 36 inches
Wheel Stop
Parking
Exit Width:
Min. 36 inches
Landing
20
DEPARTMENT OF PUBLIC HEALTH INITIAL HEALTH INSPECTION CHECKLIST
The items listed in this checklist are the areas that the public health inspectors will be looking during
your initial health inspection.
For the complete Guide to Your Initial Health Inspection, visit www.cityofchicago.org/restaurant
21
WATER / HOT WATER
Potable supply of hot and cold water is available and protected from backflow contamination.
Facility can maintain hot water of at least 120°F at all faucets (non-hand washing)
VERMIN
Facility is free from insects and rodents
Outside doors and screen doors are in good repair and rodent proofed
Facility is constructed and maintained so as to prevent entrance of vermin
Air curtains are operating properly and in good repair
22
PHYSICAL FACILITIES
Plumbing is in good repair
All sinks are fully operable with hot and cold water at each faucet
Outside trash bin lids are closed
Outside premises and refuse areas are clean and well maintained
Toilet facilities are clean, well maintained and in good working order
All restrooms have ventilation/exhaust (or a window with a screen)
Self-closing doors in toilet and dressing rooms are working properly
Clothing and personal effects are stored separately from food products
Floors are clean, well maintained and in good repair
Walls, ceilings and windows are clean, well maintained and in good repair
There are no living quarters within the facility
SIGNS / REQUIREMENTS
Hand washing signs are properly posted
No smoking signs are properly posted
Customers are notified to obtain clean table ware when returning to self-service areas such as
salad bars and buffets
Consumer advisory is provided for ready-to-eat foods containing undercooked meat or raw egg
23
RESTAURANT START-UP WORKSHEET
BUSINESS ACTIVITY
Prepare food on premises: Yes No If yes, type of food __________________________________
Outdoor seating:
Patio: Yes No
Wholesale: Yes No
By signing below, I understand that any changes to business activity may impact licensing and zoning approvals. I
will notify BACP and zoning of those changes.
Signature
25
LOCATION
_______________________________________________________________________________
City State Zip Code Most Recent Use of Space
_______________________________________________________________________________
City State Zip Code Most Recent Use of Space
_______________________________________________________________________________
City State Zip Code Most Recent Use of Space
26
Questions? Please contact us:
(312) 74-GOBIZ
Restaurant@cityofchicago.org
121 N LaSalle Street, 8th Floor
Chicago, IL 60602
www.cityofchicago.org/restaurant
City of Chicago
Rahm Emanuel
Mayor