You are on page 1of 3

More than 4 places are linked with main

reinforcement of beam
Traction
Machine Height of hook 100 Height of hook 100
Height of hook 100
Hook(prepared by customer)
Carrying force:1500KG

Details of Hook

Net height of roof top K


Net height of roof top K 4800

Net height of roof top K

Net height of roof top K


Prepared by customer, depth of concrete 300

Prepared by customer, depth of concrete 300

Position of guide rail bracket KL-150=2950


Position of guide rail bracket KL-150=2950

Position of guide rail bracket KL-150=2950


Height of bearing hole of main engine KL 3100

Lifting Height R

Lifting Height R
Lifting Height R 10065

Lifting Height R

Ladder provided by
manufacturer
Car buffer gap

P
counterweight buffer gap

Dept of pit S 1200

Dept of pit S
Dept of pit S
Dept of pit S

Diagram of the position of the left wall bracket Diagram of the position of the right wall 0-0 Ring Beam Diagram
DT1 Vertical Profile Drawing of Shaft of the front hall door outside the shaft bracket of the front hall door outside the shaft Note: This figure only applies when no
⚫ The counterweight buffer gap should be ⚫ The counterweight buffer gap should be ⚫ The counterweight buffer gap should be additional brackets are configured
installed according to the maximum installed according to the maximum installed according to the maximum
value DT1 Ring beam

LAYOUT-1
Net depth of shaft 2130 HD

Net depth of shaft 2130 HD


Roof Hook
Roof Hook

Roof Hook

Net width of shaft 2280 HW


Net width of shaft 2280 HW

Hook diagram of shaft plan Roof diagram of shaft plan

Net depth of shaft 2130 HD


Abbreviations:
Net car door open width 900- OP
Net shaft width 1100-ROP
Net car width 1500-CW
Car width (exterior) 1550-A Guide rail distance 1600
Net depth of car 1600-CD Net width of shaft 2280 HW
Car depth (exterior) 1774-B
Net depth of shaft 2130-HD
Net width of shaft 2280 HW Plan of shaft

Plan of shaft

Abbreviations
GOV-Speed governor
L.S-Limit the batting position
PRS-location of flatting device
T.C- Travelling Cable
LAYOUT-2
Work to be completed by Party A
1. The shaft and shaft wall building must meet the fire protection
requirements, do not install equipment unrelated to the elevator, power
supply and other unrelated holes.
2. When there is a space under the bottom of the pit that can be reached
by personnel, the buffer can be installed on the solid pile pier that
Embedded part extends to the solid ground, or ask the elevator manufacturer to install the
(prepared by customer) counterweight safety pliers.
3. Before the installation of the elevator, all the doors and holes must be
equipped with a height of not less than 1.2 meters of safety protection
enclosure, and should ensure that there is enough strength.
4. Closed well according to the need for ventilation holes (generally at
the top and bottom of the well), its area shall not be less than 1% of the
horizontal area of the well, ventilation holes shall be set with protective
nets.
5. The elevator hall door, call display reserved holes and other reserved
holes shall be backfilled and decorated when the elevator is installed.
6. When the distance between two adjacent floor doors is more than 11
meters, a safety door shall be set between them, which shall not open into
the well. The center of the door is the same as the center of the hall door
of the other floors, and it is more than or equal to 750mm away from the
left and right walls. When party A takes care of the safety door, the size
shall be no less than 350mm wide x 1800mm high.
7 bottom pit should be waterproof, if there is water pit, should be located
Embedded part
in the corner.
8. Pull the power supply to the power distribution box in the equipment
room according to the requirements in the technical specifications table,
set a protective switch, and lock it. The fluctuation range of power
supply should not exceed ±7%. The neutral power cable must be
Hall door head beam Hall door head beam separated from the ground cable, and the ground resistance must not be
greater than 4 ohms. If leakage protection is added, it is recommended
that the rated residual current be 500mA.
9. All loads indicated in drawings include impact correction unless
otherwise noted, and the shaft walls and bottom pits must be strong
enough to withstand the forces shown.
Civil construction reserved door height 2200, door net height

Net door open


Height of bearing hole of main engine KL 3100

900-OP 10. Party A shall take care of the items indicated in the drawing
Net door open Civil construction (embedded steel plates, etc.), which shall be set up in advance.
900-OP reserved door
width 1100 11. Steel belt elevator requirements: the machine space and well of steel
Civil construction reserved door height 2200

Civil construction
reserved door belt elevator shall have protective measures with less than 2% UV
width 1100
transmission ratio, such as tempered laminated glass or glass film. Note:
Net height of the door 2100 OPH

Finished floor
JC/T2393-2017 gives the test method of ultraviolet transmittance.
after decoration 12. Color requirements of sightseeing stairway: if the structure of the
Finished floor
stairway is brick wall/concrete/brick mix, the painting color of the wall
2100 OPH

after decoration
surface of the stairway is RAL7037(at Party A's own cost); if the
structure of the stairway is steel structure, the color of steel frame is
RAL7037(at Party A's own cost).
Having less than 60 thickness for the

Having less than 60 thickness for the

Floor before
Floor before
decoration
decoration
Having less than 60 thickness for the

Floor before Net width of shaft Net width of shaft


decoration Hall door plan (other Hall door plan (base
floors ) Hall door floors ) Hall door floor bar
floor bar
decoration of floor

decoration of floor

Control cabinet installed at side of main engine of roof;


The user provides 3-phase 5-wire power line to the elevator control
decoration of floor

cabinet;
Note: The wall thickness at the hall door of the top floor must be greater
than or equal to 200mm. If the wall thickness is less than 200mm, the
wall will protrude after the installation of the control cabinet. Please
note that space avoidance will affect the appearance effect.

Top Floor

Layout 3

You might also like