You are on page 1of 1

JL. Trans Kaltim RT. 003, Desa Kelapis, Kec. Malinau Utara, Kab.

Malinau
Telp : +62 813 9295 6133 email : plntmalinau2x3mw@gmail.com

SCHEDULE RDO DAN SINKRON UNIT #2

TANGGAL WAKTU KETERANGAN

05/02/2024 12.00 AM Proses Refractory Dry Out (RDO), Drying, temperature Furnace 30 ˚C
02.00 AM Drying, Mulai penambahan temperature Furnace 60 ˚C
04.00 AM Drying, Mulai penambahan temperature Furnace 90 ˚C
06.00 AM Drying, Mulai penambahan temperature Furnace 120 ˚C
07.05 AM Mulai Penambahan Temprature Furnace 200 ˚C
08.05 AM Mulai Penambahan Temprature Furnace 300 ˚C,
Mulai Penambahan Temprature Furnace 400 ˚C
09.05 AM
Pressure Steam 2,5 Mpa
10.05 AM Mulai Penambahan Temprature Furnace 500 ˚C
11.05 AM Heating Line Turbin Unit #2
12.05 PM Menaikan Temperature Bearing turbin unit #2
02.05 PM Temprature Case upper 60 ˚C, Proses Vacuum Turbin Unit #2
Start Rolling 800 RPM dengan sistem Rolling Manual.
04.05 PM
Di Tahan 800 RPM, Sampai Temprature Case Upper 130 ˚C
04.05 PM 800 rpm
04.45 PM 1600 rpm
05.45 PM 5600 rpm
06.00 PM SINKRON

SCHEDULE ROLLING TURBIN UNIT #1


5600
6000
5000
4000
RPM

3000
1600
2000 800
1000
0
04.05 PM 04.45 PM 05.45 PM
WAKTU

You might also like