Professional Documents
Culture Documents
Design of Footing
Design of Footing
S.N. % of steel
1 0.23
Interpolation
S.N. % of steel
1 #REF!
Interpolation
S.N. % of steel
1 0.23
0.3435532995
-----
-----
-----
-----
shear strength
0.344
#REF!
#REF!
#REF!
#REF!
#REF!
shear strength
#REF!
0.3435532995
-----
-----
-----
-----
shear strength
0.344
Design of isolated foundation
Pleft(X)(unfactored) 305.00 KN Area req 2.24
KN Width prov 1.80
Soil bearing 150 KN/mm2 Total Length 1.24
Cent Col Size 0.3 m provided length 1.80
Cornor Col Size 0.3 m Left Projection
Dist betw. Col. Center to center m Right Projection
CG/from Left of 0
Max P 457.5 m
Net upward soil pressure = 141.20 KN/m2 Check Value 0.3
m
BENDING MOMENT about x-x passing through the face of the colu 71.48 KN/m maxim projection
0.000
d calculated from moments = 119.95 mm
Grade of concrete M 20
Check for one way shear
at d distance (Vu)= 90.48 kN
Nominal shear stress(Tv)= 0.13 N/mm2
% of tension steel p = 12 dia 0.23
shear strength of M20 concrete for above % steel = 0.34 Ok for 12 dia.
Check for two way shear
Development length
Ld= 679.69 mm
Ld available 790 > 679.69
Ok
Design of isolated foundation
Pleft(X)(unfactored) 450.00 KN Area req 3.96
KN Width prov 1.99
Soil bearing 125 KN/mm2 Total Length 1.99
Cent Col Size 0.3 m provided length 2
Cornor Col Size 0.3 m Left Projection
Dist betw. Col. Center to center m Right Projection
CG/from Left of 0
Max P 675 m
Net upward soil pressure = 168.75 KN/m2 Check Value 0.3
m
BENDING MOMENT about x-x passing through the face of the colu 121.92 KN/m maxim projection
0.000
d calculated from moments = 148.62 mm
Grade of concrete M 20
Check for one way shear
at d distance (Vu)= 153.90 kN
Nominal shear stress(Tv)= 0.20 N/mm2
% of tension steel p = 12 dia 0.23
shear strength of M20 concrete for above % steel = 0.34 Ok for 12 dia.
Check for two way shear
Development length
Ld= 566.41 mm
Ld available 890 > 566.41
Ok
Design of isolated foundation
Pleft(X)(unfactored) 520.00 KN Area req 4.58
KN Width prov 2.14
Soil bearing 125 KN/mm2 Total Length 2.14
Cent Col Size 0.3 m provided length 2.2
Cornor Col Size 0.3 m Left Projection
Dist betw. Col. Center to center m Right Projection
CG/from Left of 0
Max P 780 m
Net upward soil pressure = 161.16 KN/m2 Check Value 0.3
m
BENDING MOMENT about x-x passing through the face of the colu 159.99 KN/m maxim projection
0.000
d calculated from moments = 162.32 mm
Grade of concrete M 20
Check for one way shear
at d distance (Vu)= 197.13 kN
Nominal shear stress(Tv)= 0.23 N/mm2
% of tension steel p = 12 dia 0.23
shear strength of M20 concrete for above % steel = 0.34 Ok for 12 dia.
Check for two way shear
Development length
Ld= 566.41 mm
Ld available 990 > 566.41
Ok
8.528