You are on page 1of 10

WHO ARE WE ?

We are Damvent – A Bulgarian Technology company,


100% privately owned, with more than 30 years of
experience in the field, specialized in production of
the highest/premium class energy – efficient /saving
solutions for ventilation and air conditioning

More than 1400 hybrids for fresh air delivered,


installed and commissioned.
Biggest reference list in EU!

Airflow 7 000 000

20 Countries
We have clients and partners in over 20
countries in the EU and Asia!

Scotland
Ireland Sweden
Estonia
Denmark
England
Netherlands Belarus Russia
Belgium
Ukraine
Hungary
Moldova
Romania
North
Macedonia Bulgaria

Greece Azerbaijan

Pakistan
Our hybrid HVAC solutions for fresh air by sectors
Comfort ventlatrion
Indoor Swimming Pools
Clean rooms
Healthcare Sri lanka
Indusrty
What are we doing? Focus Company
We create and deliver Knowledge. Premium hybrid solutions for Fresh Air Only…
We educate! Who? The first and still the only company that consciously
Ourselves, our partners, our customers… removed all previous and existing products from its
and our competitors! portfolio, to focus and dedicate to be the best and
“Pound for Pound”#1 at hybrid HVAC solutions
for fresh air

The technology leader in hybrid HVAC ...Always 2 steps ahead of the competition
...by thinking out of the Box and taking Risks
solutions for fresh air in EU!
We don’t manufacture products...
We develop innovative solutions and concepts!

WHAT WE DO ?
WHAT WE DO ?

A+++ We don’t follow Standards… We don’t have clients ...


A++ ...We set up the Standards! We create loyal Hardcore Fans/Followers.

A+

A
The first company to introduce in official documentation
and within its software the overall net efficiency of such
B hybrid HVAC solutions for fresh air COPnet / COPsystem =
C (Qhr + Qhp) / (Nfans + Ncomp) ... Thus setting up a new
standard, followed today by other companies.
D

We design/innovate for All Climate Zones We don’t have goals...


(-30 to +55°C) around the world We have dreams!
Damvent in All Continents..
We don't limit ourselves to a certain temperature range.
Technology and Knowledge Leader…

The ever-popular Construction & Engineering Awards, Damvent were nominated for the award of "Best UK Air
launched in 2015 by BUILD magazine, remains a Treatment Systems Supplier 2019" and to our gratitude
prestigious and highly desired programme for any we won! It is always humbling to be recognised for the
„Best UK Air Treatment Systems
manufacturer. The Construction & Engineering Awards hard work and dedication that our team put into our
Supplier 2019" honour those whose work may span civil, commercial, products and our customers projects.
energy, residential, industrial and infrastructure projects.
3E - Concept For the Investor
· Significant reduction in initial investment costs
1е - Every Climate – from -30°C to +55°C · Significant reduction of installed power
2е - Every Application –suitable for every application where 100% · Low operating (energy) costs
fresh air is needed, by means of covering all possible air treatment · Saved Space
· Easy maintenance – mono-block unit
processes:
· Internet monitoring
· Filtration · Recirculation 0÷100% · Heating · Cooling +
· 100% Factory Tested
Dehumidification · Process Ventilation
3е - Every Installation - Every Installation - suitable for all types of · Low noise performance
mounting, indoor (machinery rooms, technical floors, etc.) and outdoor
For Designers and Consultants
2 STAGE HEAT/COOL/HUMIDITY RECOVERY TECHNOLOGY ·
·
Significant reduction in initial investment costs
Significant reduction of installed power
up to 100% of the extract heating/cooling/humidity,
Recovering · Low operating (energy) costs
2 STAGE achieved - "consecutively" in 2 stages: · Saved Space
HEAT/COOL/HUMIDITY · Easy maintenance – mono-block unit
RECOVERY TECHNOLOGY 1st stage - the sorption rotary heat exchanger, recovers more than · Internet monitoring
60-80% of the heating/cooling and humidity. · 100% Factory Tested
· Low noise performance

ADVANTAGES
2nd stage - the evaporator/condenser of the air to air heat pump, · Specialized Selection Software available and free to use
CONCEPTS

recovers the rest up to 100%. · Saves design time


· Flexibility for installation on site for the unit
· Fast and easy calculation of energy consumption on an annual basis
All in 1
max.e - multifunctional concept solution for fresh air with built-in For installation companies
ALL IN ONE
reversible heat pump and integrated automation system · Easy installation on site (needs only connection to the ducts system
and power supply)
· Connection to the BMS system through different protocols
· Setting up the unit through internet
100 % Factory tasted · Lack of working with refrigerants on site


100% High reliability and reduced installation costs, achieved by 100% factory
FACTORY TESTED tests - each unit is tested under factory conditions
The factory test includes:
· Leakage check
· Vacuuming and loading the system with the exact refrigerant
quantity.
Сapital Cost Comparison
· Functional testing of all fans and compressors
· Loading the controller's software
· Temperature and pressure checks
· Setting up the required air flow • Classic AHU with DX/Water coil section
• External condensing unit/VRF
· Recording all parameters of the unit on a test list • Hot water boiler for low ambient temperatures
• Pipe system with all necessary and attached
accessories- insulation, fittings, etc.
• Pumps (for water systems)

100% Plug and play Hybrid AHU


with built-in heat pump



Installation labor for two or more systems
Common automation system
Higher installed electric power
Higher costs for electric installation
100% Stand alone "one-piece" unit, which only needs a duct system and power and integrated
automation system • Higher costs for BMS - for controlling two
PLUG AND PLAY supply for start up. •
or more systems
Significantly higher footprint
and space for thye systems

Traditional Systems
Permanent internet connection
All hybrid units allow an internet circuit board to be connected
to the ICB controller for internet connection. The built-in circuit
board allows for a permanent internet connection to each max.e
from any location in the world. This option helps you/us react to
situations that require fast and accurate solutions to the problem.

Opportunities provided by WEB communicator


Possibility for remote start-up and 72 hours monitoring period
The air-handling unit can be started and adjusted via the Internet, it would be monitored
DV_Select until it reaches and maintains the set parameters.

The most important tool for any designer / consultant ! Software updates
Updates are possible for the controller’s software, if the customer requires additional settings
or parameter adjustment. These additional settings and updates would be managed/
The main features of the new software are: performed over the Internet.
SOFTWARE

MOBILITY
Friendly Interface Archive (history) of working and service parameters
This option would create History logs/archives containing data about the operation of the
AHU, using the Supervisory Control аnd Data Acquisition (SCADA).

Lightweight, Fast and Easy to operate with minimal time to enter Monitoring of the variables, working parameters
the input data - from 30 to 90 sec for the calculation Monitoring the status of all variables accessible to the client and the unit's display.

Diagnosis of problems, arising during the operation of the air-handling unit


Winter / Summer calculation modes By analysing the information and data from the history menu, the source of the issue or
the reason which triggered it can be found. The problem is solved via the Internet when
physical access to the AHU is not required.

Ability to export all technical data to .pdf


Functional diagram
Take a detailed look how the unit is connected with all its components. It is fascinating how
Visualisation of all air treatment processes within the Mollier diagram such a little technology can have such a big impact on the performance and maintenance
of the complete system.

The Specialized hybrid selection software can calculate different modes -


(winter and summer) and provide extremely accurate calculations.

DV_Select Print Outs


DV_Select is a technical simulation software for hybrid fresh air units and
therefore, in the technical printout, every engineer (designer, consultant) can
get acquainted with the air treatment processes, both in the rotary wheel (plate
heat exchanger) and within the heat pump unit.
DESIGN AUTOMATION SYSTEM
The solutions from the max.e series are designed and max.e is fully equipped with all necessary automation
manufactured in accordance with EN 1886 – (Ventilation and all executive mechanisms. The electric switchboard is
for buildings-Air handling units Mechanical Performance). integrated into the unit and located on the operation (access)
max.e is designed as a system with the structure of the unit, side. The "Brain" of max.e is a specially designed by Damvent
manufactured as a mono-block , consisting of aluminium controller which controls and manages all processes and
profiles, supporting elements, connection angles and protects the unit from eventual cut-offs.
locking accessories.
Larger sizes (over 18,000m3/h), are produced in sections.
Unit enclosure panels are double skinned and manufactured
from galvanized sheet steel.
Both the inner and outer skins have a powder polymer
coating.
All internal surfaces are powder coated as standard!
PLATE HEAT EXCHANGER
All of the max.e2 units use an air-to-air plate heat exchanger,
made from aluminum fins - “epoxy” coated, with condensate
drain pan.The plate heat exchanger is equipped with a
motorized damper (bypass and “free-cooling”).

HARDWARE
HARDWARE

FANS ROTARY HEAT EXCHANGER


All sizes of max.e use the latest high-tech generation EC All of the max.e3 units use an air-to-air rotary heat
Blue (Electronically Commutated) Plug Fans – with built-in exchanger- Sorption type, made from aluminum foil and 3Å
frequency controller (inverter) by Ziehl-Abegg. Fan wheel molecular sieve, which gives high sensitivity for absorbing
statically and dynamically balanced on the axis of the water molecules (HM1 type). Sorption rotor provides an
direct-driven motor. Fan wheel together with the motor are excellent method to pre-cool and dehumidify the fresh air
mounted on a common base frame with vibration dampers. before entering the DX cooling coil.
Using second-generation EC Blue fans, max.e delivers the
highest energy efficiency class - IE5 according to IEC 60034-30-2.

HEAT PUMP FILTERS


100% DX unit - No additional water, electric or DX Filters are installed at the inlet of the unit to ensure normal
heating/cooling coils are needed in max.e, which makes it operation of the AHU and to prevent contamination of the
independent to other additional heating/cooling sources components.
(boilers, chillers, VRF systems, etc.). Microcell filters are used in the max.e units. These filters are
made of plated micro glass paper and spaced with hotmelt
All of the max.e units contain high efficiency direct expansion
adhesive beads, which are uniformly positioned to deliver
coils, which are made from copper tubes and aluminum fins
optimum airflow. The frame is constructed from a composite
and are equipped with a condensate drain pan. Both coils
material (plastic) and 130mm Galvanized steel sheets. The
are "epoxy" coated, extending their useful life and also their
Classes of filtration are M6 (standard), F7, F8 and F9 (optional).
best levels of performance.
Comfort ventilation Process ventilation
Our hybrids provide full HVAC (covering cooling load - cooling + heat losses - heating + fresh air)
· Our hybrids provide fresh air only. Additional systems (such as VRF / chillers / coolers / boilers / · Three important parameters are supplied:
fan coils / radiators) are required for cooling and heating! 1. Air flow; (m3/ h);
2. RH moisture in the room (%)
3. T room temperature (°C)
· Control method - RH indoor humidity (%) + Indoor temperature (° C) - most often RH
indoor humidity takes priority.
· Input information required for selection - cooling loads / heating losses (kW), room
dimensions (BxHxL = mm), air change ratio (h-1), supply / exhaust airflows (m3/h) ), external
static supply/ exhaust pressure(Pa), T / RH temperature / humidity / outdoor air (winter /
summer);
· T / RH temperature / humidity indoors (winter / summer); required Tsupply (winter /
summer), air distribution supply / exhaust scheme.
· Offer response time - Starting from 1 week or more depending on the complexity of the
APPLICATIONS AND MODELS

APPLICATIONS AND MODELS


application.

Models:
· max.e-pool - Standard sizes
· max.e2-H/max.e3-H-hygienic
version
· max.e3-DH - where superior humid- DH

ity control (%) is required, plus cooling +


dehumidification and reheating.
· Selection - using specialized selec-
tion software + manual calculations
· Standard Delivery Time - starting
from 10 weeks depending on the com-
plexity of the application
· Applications - swimming pools,
hospitals and surgery rooms, pharma-
ceuticals, laboratories, microelectron-
ics, food, etc. where recirculation is not
allowed and clean air is needed for the
process ...
· Two important parameters are supplied::
1. Air flow rate (m3/ h) and
2. Supply temperature (°C)
· Control method - by Room temperature (°C)
· Selection input information required - Flow rates - supplied and exhaust air (m3 / h), ESP –
external static pressure - supply and exhaust air (Pa), T / RH temperature / humidity /
outdoor air (winter / summer); T / RHtemperature / humidity / room (winter / summer);
required Temperature / supply air (winter/ summer), SFP (W / m3 / s)
· Offer response time - 1-2 day
· Standard Models - max.e-mini, max.e2, max.e3
· Selection - from specialized selection software
· Standard delivery time - 6-8 weeks
· Applications - offices, shopping malls, restaurants, hotels, gyms, discos, cinemas, theaters,
etc. where people need fresh air.
COP/SCOP/SPF STANDARDS
A conventional air cooled heat pump uses the ambient air for the evaporation process and
during the winter this air can reach temperatures of -10°C, -15°C or even -20°C. Extracting heat Dear Customers/Partners,
from the ambient air is an inefficient process. In comparison, max.e uses the extract air from the
room. Under normal conditions, this air ranges in temperatures from 20÷24°C. Firstly, 65÷80% of We, Damvent Ltd. as The Technology Leader in the Hybrid HVAC solutions for fresh air would like
the heat and humidity is recovered in the rotary/plate heat exchanger and then at a temperature to clarify all standards and SFPint related to our solutions and make a clear statment.
between 1÷6°C, the air enters the evaporator of the heat pump, thus recovering the other 20÷35%.
In this way, we extract up to and more than 100% of the heat from the room air.
At the moment there is no specific single standard, dedicated for hybrids!
We, Damvent, provide each of our hybrids with 4 separate Declarations of conformity to
According to Euro standard EN14825, the highest Energy Efficiency Class for Heat Pumps
is A +++ with SCOP = 3.75 (high temperature) - 4.38 (low temperature). With SCOP = 3.8 ÷ 6.5 fully cover the complexity of our solutions:
(on the refrigeration circuit) and COPnet of the entire SCOPnet system = 5 ÷ 15, the hybrid air- · Declaration of conformity in relation to EC Directives :
handling units of the max.e series outperform the standards. · 2014/ 35 /EU - Low Voltage Directive
· 2006/ 42/ EC – Machinery Direction
· 2014/ 30 /EU - Electromagnetic Compatibility Directive
· 2014/ 68 /EU– PED(Category II, Module A1)
Note: · EN 1886 : 2007 – Ventilation for buildings-Air handling units-Mechanical Performance
* SCOPnet - seasonal efficiency of the unit in heating mode, with no additional electric heaters, · VDI 6022-1: 2011-07- Hygiene requirements for ventilation and air-conditioning
determined by the mandatory conditions laid down in this EU standard and used for marking, systems and units...and others...
COP/SCOP/SPF

comparison and certification purposes.

STANDARDS
Q heat recovery + Q heat pump 1. Declaration of conformity in relation to EC Directives: EN378-1- Refrigeration system
COPnet =
N fans + N compressor and heat pumps-Safety and environmental requirements Part1: Basic requirements, definitions,
Where: classification and selection criteria, with the following clarifications...
2. Declaration of conformity in relation to EC Directives: Directive 2009/125/EC - Ecodesign
· Q heat recovery - recovered heat in rotary / plate heat exchanger (kW) requirements for air heating, air cooling products, high temperature process chillers and fan coil
· Q heat pump - heat capacity of the heat pump condenser (kW) units, with the following clarifications
· N fans - Power consumption from both fans (supply and extract) (kW) 3. Declaration of conformity in relation to EC Directives: (ЕС) 517/2014
· N compressors - compressor power consumption (kW
*Note: All our hybrid solutions, sizes and models are Not object of regulation in according with
Ecodesign requirements for Ventilation units (Commission Regulation(EU) No 1253/2014 from
07 July 2014 for applying of EC Directive 2009/125/EC, Art.1, point 2 “g”: „This regulation shall not
apply to ventilation units which: (a) include a heat exchanger and a heat pump for heat recovery
or allowing heat transfer or extraction being additional to that of the heat recovery system,
except the heat transfer for protection of frost or defrost”.
A+++ All our solutions include an integrated heat pump, which recovers heat and cool, additional to
that of the heat recovery system. This means all our solutions include on the extract side after the
A++ recovery system an additional coil (evaporator/condenser).
This coil at nominal airflow has an internal pressure drop up to 70Pa, and at max. airflow up to
A+ 85Pa, which naturally increases the Total Internal Pressure Drop of the units.
Due to the above facts the SFPint of our Hybrids is naturally expected to be higher than of a
A classic BVU(with HRS only), and may go above the required SFPint limits, stated in Regulation(EU)
No 1253/2014.
B
SFPint (SFPint is calculated with: Clean M5 filter in exhaust air, Clean F7 filter in supply air,
C Heat recovery device, Balanced air flow.
For all our max.e3 hybrids we have calculated the following SFPint @ Nominal airflow in
D winter mode:
max.e3- 02 (Vnоm = 1500m3/h) - SFPint = 664,0 W/m3/s Table 14(Directive 2009/125/EC)
max.e3- 03 (Vnоm = 2500m3/h) - SFPint = 656,3 W/m3/s Information requirements for heat pumps
max.e3- 04 (Vnоm = 3500m3/h) - SFPint = 882,6 W/m3/s Information to indentify the model(s) to which the information relates: max.e 3-09
max.e3- 06 (Vnоm = 6000m3/h) - SFPint = 758,7 W/m3/s Outdoor side heat exchanger of heat pump: AIR
max.e3- 09 (Vnоm = 9000m3/h) - SFPint = 821,2 W/m3/s Indoor side heat exchanger of heat pump: AIR
max.e3-15 (Vnоm = 13.000m3/h) - SFPint = 910,9 W/m3/s Indication if the heater is equiped with supplementary heater: NO
max.e3-18 (Vnоm = 16.000m3/h) - SFPint = 1049,6 W/m3/s If aplicable: driver of compressor: electric motor
Parameters shall be declared for the average heating season (for the warmer and colder heating seasons are optional)
We notice that SFPint is very often used for general design and sizing of BVU`s. Please, keep in Item Symbol Value Unit Item Symbol Value Unit
mind the fact that the source of heating and/or cooling is External for the BVU`s, which are part Rated heating capacity Prated,h 24 kW
Seasonal space heating
η s,h 5.99 %
of the Regulation(EU) No 1253/2014. (+7oC) energy efficiency
Declared coefficient of performance or gas utilisation
For all our Hybrids the source of heating and/or cooling is Internal/Integrated, which is the built-in Declared heating capacity for part load at indoor temperature 20oC
efficiency/auxilary energy factor for part load at given outdoor
reversible heat pump. and outdoor temperature Tj. (@Tsupply = 22oC)
temperatures Tj
Tj = -15oC Pdh 29.4 kW Tj = -15oC 4.82 100 %
Based on the above facts we strongly believe and recommend for all Hybrid HVAC solutioins for
Tj = -12oC Pdh 29.6 kW Tj = -12oC 4.76 90.3 %
fresh air, SFPint should not and must not be taken as a major or leading factor when designing Tj = -7oC Pdh 31.8 kW Tj = -7oC 4.88 74.2 %
or sizing the units. Tj = + 2oC Pdh 26.1 kW Tj = + 2oC 4.8 45.1 %
Tj = +7oC Pdh 24 kW Tj = +7oC 6.67 29 %
The major design factors to be taken when designing and sizing Hybrids for fresh air should be: Tj = + 12oC Pdh 20 kW Tj = + 12oC 7.91 12.9 %

HEAT PUMPED MARKING


Tbiv = bivalent temperature Pdh 29.4 kW Tbiv = bivalent 4.82 100 %
· Tsupply (winter/summer) = Troom±1-4k (depending on the mode. Tsupply, winter = Troom+1- (-15oC) temperature
2k, and Tsupply, summer = Troom-3-4k). These Tsupply must be achieved without the use of any TOL = operation limit
(-20oC)
Pdh 0 kW TOL = operation limit - - %
additional heating/cooling sources (electric heaters, water heaters/coolers, DX coolers)! Degradation co-efficient heat _
C dh
· COP of the refrigerant circuit only, where the values at lowest ambient temperatures should
STANDARDS

pumps (**)

be COP≥4. Power consumption in modes other than "active mode" Supplementary heater

Q heat recovery + Q heat pump Off mode POFF Back-up heating capacity (*) elbu - kW
COPnet = Thermostat - off mode PTO 0.043 kW Type of energy input
N fans + N compressor
Crankcase heater mode PCK 2 x 0,035 kW Standby mode PSB - kW
Where: Other Items
· Q heat recovery - recovered heat in rotary /plate recuperator (kW) For air-to-air heat pumps:
· Q heat pump - heat capacity of the heat pump condenser (kW) Capacity control Variable air flow rate, outdoor _ 9000 m3/h
measured
· N fans - power consumption from both fans (discharge and suction) (kW)
Sound power level, For water/brine-to-air
· N compressors - compressor power consumption (kW) indoor/outdoor measured
L WA 59 dB
heat pumps: Rated brine
_ m3/h
or water flow rate,
Emmissions of nitrogen Nox (***) x mg/kWh fuel outdoor side heat
· COPnet - that is the most important Energy Indicator for Hybrids! ... oxides (if applicabe) input GCV exchnger
and Damvent was the first company to introduce it in official documentation and selection 1770 kg CO eq
GWP of the refrigerant
software. (100 years)
(*)
(**) If Cdh is not determined by measurement then the default degradation coefficient of heat pumps shall be 0,25
*TABLE 14 - integral part of “COMMISSION REGULATION (EU) 2016/2281 of 30 November 2016
(***) From 26 September 2018
implementing Directive 2009/125/EC of the European Parliament and of the Council establishing
a framework for the setting of ecodesign requirements for energy-related products, with regard Where information relates to multy-split heat pumps, the test result and performance data may be
obtained on the basis of the performance of the outdoor unit with a combination of indoor unit(s) recommended by the manufacturer
to ecodesign requirements for air heating products, cooling products, high temperature process or importer.
chillers and fan coil units”.

Every Hybrid, containing integrated heat pumps must be supplied with this label, providing *Notes
important key info such as: 1. Seasonal space heating energy efficiency ηs,h means the ratio between the reference annual heating demand
1. Seasonal space heating energy efficiency ηs,h this means the ratio between the reference pertaiting to the heating season covered by an air heating product, and the annual energy consumption for heating
annual heating demand pertaiting to the heating season covered by an air heating product, and 2. "Thermostat-off mode" means the condition corresponding to the hours with no cooling or heating load, whereby
the annual energy consumption for heating. the cooling or heating function is switched on, but the unit is not operational.
2. "Bivalent temperature" (Tbiv) this means the outdoor temperature (Tj) declared by the 3. "Bivalent temperature" (Tbiv) means the outdoor temperature (Tj) declared by the manufacturer at which the de-
manufacturer at which the declared heating capacity equals the part load for heating and below clared heating capacity equals the part load for heating and below which the declared heating capacity has to be
which the declared heating capacity has to be supplemented with an electric back-up heater supplemented with electric back-up heater capacity in order to meet the part for heating, expressed in oC
capacity in order to meet the part for heating, expressed in °C 4. "Operation limit temperature" (Tol) means the outdoor temperature declared by the manufacturer for heating, be-
3. "Operation limit temperature" (Tol) this means the outdoor temperature declared by the low which the heat pump will not be able to deliver any heating capacity and the declared heating capacity is equal to
manufacturer for heating, below which the heat pump will not be able to deliver any heating zero, expressed in oC.
capacity and the declared heating capacity is equal to zero, expressed in °C.. 5. LWA- measured @1m. from the unit, without ducts at max. airflow 9.000m3/h
4. Indication if the unit is equipped with supplementary heater!!!...and many more 6. ηs,h= 5,55 for colder heating season
Princess Margaret Hospital Osborne Road, Windsor
Factory Test Berkshire, SL4 3SJ, United Kingdom

How to overcome the lack of a Dedicated Standard for Hybrids? There is only one way… Energy efficient hybrid HVAC system for the BMI Princess
With the Ultimate Factory Test(FT). Margaret Hospital‘s new Urgent Care Center in Windsor.
Every single Hybrid that we produce goes through a full Factory Test in factory conditions and
Ready-to-Work.
It includes the following features:
· Vacuuming of the refrigerant circuit and filling up the exact quantity of refrigerant,
without extra activity on site.
· Functional checks of all executive mechanisms and sensors Sint Maartenskliniek - Ubbergen, Netherlands
· Setting up the exact airflow (CAV), or pressure(VAV) required by the customer
· EEV fine settings In November 2018 we delivered, installed and commissioned all
the ventilation equipment for the newly constructed building
· Measuring and recording all air and refrigerant temperatures(oC) and pressures(bar), of Hospital Sint Maartenskliniek - Ubbergen, located in the
voltage(V), currents(A) and power input(kW) of the different components and the unit Netherlands.
as a whole.
· Simulation of heating/cooling, ventilation or dehumidification modes
· Tsupply control simulation
· Capacity control adjustments (compressors and additional heaters if available)
· LCD display User settings and connectivity
FACTORY TEST

·
·
Fine adjustments of frequency inverters of: fans, compressors, rotary wheel
Filter settings
Warwik Business School - 17th floor, The Shard, 32
London Bridge st, London SE2 9SG
· Alarm checks
· Remote control check In November 2014 Damvent delivered a hybrid air-handling

REFERENCES
· BMS settings unit of its last generation - max.e3 to the highest building in
· Labeling of the unit Europe - the skyscraper The Shard, located in the center of
London.
· Final internal cleaning
· Providing the necessary documentation (manuals, declarations of conformity etc.), plus
additional accessories
· Packaging
· …last but not least, comparison between the theoretical performance in the selection
software printout and the real measured values during the FT Thales - High G Training & Test Capability
Training Centre at RAF Cranwell
Lincolnshire NG34 8HB, United Kingdom

Damvent was selected as the supplier of ventilation equipment


for the newly built Jet Pilot Training Center in the Royal Navy
and the Royal Air Force.

Uni Hospital Panagyurishte


Panagyurishte, Bulgaria

Damvent delivered all the AHU for the ventilation system of


the newly constructed Hospital for General Medical Treatment
Facility in the town of Panagyurishte, Bulgaria.

The complete list of realized objects by Damvent you can follow on


the website: www.damvent.com - in section References
www.damvent.com

You might also like