You are on page 1of 7

Page 1 of 7

RESUME
Name : Mr Rachan Kumkrasair
Home address : 5/90, Moo 6, Tombon Bangchang Ampher Banchang, Rayong 21130.
Telephone : Mobile 088-9916-251,084-8659-905
Date of birth : 21-May-1972
Age : 51 Years
Marital Status : Single
Height : 1.7 m.
Weight : 65 Kg.
Military Service Status : Reserved office’s Training Corps Course
Education Background :
May 1995 : BA in Mecanical Engineering of Vongcharvalitkul University.
Apply positions: : PRODUCTION ENGINEER
Employment :
Period Company Position Held
7/2023-present Woojo(Thailand) Co., Ltd. Piping engineer
1/2022-4/2023 Caz(thai land) Public Co., Ltd. Senior mechanical engineer
5/2018-2022 Thai metal product industry Co., Ltd. Factory Manager
4/2015-2018 Tang Thong engineering Co., Ltd. Production Manager
8/2011-2015 Thai woo ree engineering Co., Ltd. Ass.Project Manager.
2/2003-2011 Sutee Tanker & Special Trucks Co., Ltd. Ass.Project Manager.
6/1997-8/1999 B.K.K & Vow Co., Ltd. Production Engineer.
5/1995-5/1997 Vatanaphaisal engineering co.,Ltd. Site Engineer
Languages :
Written and spoken Thai
Written and spoken English
Experience in Software :
Microsoft Word
Microsoft Excel
Microsoft Access
Microsoft Project
Page 2 of 7

Synopsis of Professional Experience :


18 years of experience in mechanical vessel, heat exchanger, tank design
in oil & gas ,Petrochemical industries, included design, cost estimation,
planning and scheduling. Design work are included preparation of various
specification of equipment design and prepare equipment drawing for
fabrication, supervise and control work at fabricate shop& site install,
material take-off and order, confirming to various standards such as
ASME, TEMA, API, JIS. As below project.
-.MT- Project MC-TOWA International Sweenterner Co., ltd ,Rayong
Main contractor MKK,LTD.
- Methyl Ester plant of Thai Oleochemical Co., Ltd. , In Maptaphut , Rayong (Thailand)
Main contractor SHEDDEN UHDE(THAILAND)LTD.,
- TA-2 PROJECT (PILIPINAS KAO.,INC.)
Main contractor SHINKO PLANTECH CO.,LTD
-PTTPE LDPE PLANT PROJECT of
Main contractor TOYO-THAI CORPORATION.,LTD
-THAI MMA#2 PROJECT(SCG CHEMICAL LTD.) of
Main contractor TOYO-THAI CORPORATION.,LTD
-BST NB LATEX PROJECT of BANGKOK SYNTHETICS CO.,LTD
Main contractor THAI WOO REE CO.,LTD
-V-project
Main contractor SK Corporation CO.,LTD
-WASTE HEAT RECOVERY STSTEM FOR GSP5 PROJECT
Main contractor PTT PUBLIC CO.,LTD
-OCS#4 Project
Main contractor PTT PUBLIC CO.,LTD

Working Experience : ( with Vessel, Tank, Heat Exchanger,site erection)


JULY’2023-present(Wooju(Thailand)public Co.,Ltd.)
Position : Piping engineer
Project : Clean fual gas project.(crisp project)
Duties : Drawing revised clearify and confirm spec.

May’2022-4/2023(Caz(Thailand)public Co.,Ltd.)
Position : Senior mechanical engineer
Project : Clean fual gas project.(thai oil)
Duties : Planned and controlled schedule, work method , manpower plan
Equipment plan, erection at site.(Silo,ESP,Gas duct,hot cyclone)
Page 3 of 7

JAN’2022-4/2022(Caz(Thailand)public Co.,Ltd.)
Position : Senior mechanical engineer
Project : OMP PTT GC project.
Duties : Planned and controlled schedule, work method , manpower plan
Equipment plan, erection at site.(install column & piping)
May’2018-2022(Thai metal product indrustry Co.,Ltd.)
Position : Factory manager
Project : Chemical tanker & Gas truck & pressure vessel project.
Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication.
Piping & structure erection at site( LPG Project)
Aug’2015-Jun’2018(Tang thong engineering Co.,Ltd.)
Position : Production manager (Tank & Vessel Dept.,)
Project : Chemical tanker truck & pressure vessel project.
Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication.
Aug’2014-Jun’2015 (Thai woo ree engineering Co.,Ltd.)
Position : Project engineer (Tank & Vessel Dept.,)
Project : OCS#4 Project
Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication derrick & common stack
Jan’2014-Jun’2014 (Thai woo ree engineering Co.,Ltd.)
Position : Project engineer (Tank & Vessel Dept.,)
Project : WASTE HEAT RECOVERY STSTEM FOR GSP5 PROJECT of
PTT PUBLIC CO.,LTD
Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication of pressure vessel & common stack.

Feb’2013-Dec’2013 (Thai woo ree engineering Co.,Ltd.)


Position : Project engineer (Tank & Vessel Dept.,)
Project : V-project of
SK Corporation CO.,LTD
Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication of pressure vessel,clad vessel.

Sep’2012-Dec’2012 (Thai woo ree engineering Co.,Ltd.)


Position : Project engineer (Tank & Vessel Dept.,)
Project : DHDS UNIT-AMINE REGENERTOR PROJECT of
Page 4 of 7

PTT GLOBAL CHEMICAL PUBLIC CO.,LTD


Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication of Heat exchanger.

July’2012-Jan’2013 (Thai woo ree engineering Co.,Ltd.)


Position : Project engineer (Tank & Vessel Dept.,)
Project : REACTOR 8 BPA PROJECT of
BAYER THAI CO.,LTD
Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication of reactor.

Sep’2011-July’2012 (Thai woo ree engineering Co.,Ltd.)


Position : Project engineer (Tank & Vessel Dept.,)
Project : BST NB LATEX PROJECT of
BANGKOK SYNTHETICS CO.,LTD
Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication of pressure vessel.

Aug’2008-Sep’2011 (Sutee tanker and special trucks Co.,Ltd.)


Position : Project manager (Pressure Vessel and Equipment Dept.,)
Project : THAI MMA#2 PROJECT(SCG CHEMICAL LTD.) of
TOYO-THAI CORPORATION.,LTD
Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication of pressure vessel.

May’2008-2009 . (Sutee tanker and special trucks Co.,Ltd.)


Position : Project manager (Pressure Vessel and Equipment Dept.,)
Project : MOC.CRACKER 2 PROJECT(SCG CHEMICAL LTD.) OF
SIEMEN.,LTD
Duties : Planned and controlled schedule, take materials , manpower plan
Equipment plan, fabrication of pressure vessel.

Feb’2008-2009 . (Sutee tanker and special trucks Co.,Ltd.)


Position : Ass.project manager (Pressure Vessel and Equipment Dept.,)
Project : PTTPE LDPE PLANT PROJECT of
TOYO-THAI CORPORATION.,LTD
Page 5 of 7

Duties : Planned and controlled schedule, take materials , manpower plan


Equipment plan, fabrication of pressure vessel.

June’2007-Fab’2008. (Sutee tanker and special trucks Co.,Ltd.)


Position : project engineer (Pressure Vessel and Equipment Dept.,)
Project : TA-2 PROJECT (PILIPINAS KAO.,INC.)of
SHINKO PLANTECH CO.,LTD
Duties : Planned and controlled schedule; Checked design of Heat Exchanger ;
Clarified and settle concept design with owner; Coordinate and supervise
with subcontractor and fabricator.

Nov’2007-Fab’2008. (Sutee tanker and special trucks Co.,Ltd.)


Position : project engineer (Pressure Vessel and Equipment Dept.,)
Project : Vietnam O MON Thermal Power Plant Project of
MITSUBISHI HEAVY INDUSTRIES,LTD.
Duties : Planned and controlled schedule; Checked design of pressure vessel ;
Clarified and settle concept design with owner; Coordinate and supervise
with subcontractor and fabricator.

April’2007-June’2007. (Sutee tanker and special trucks Co.,Ltd.)


Position : project engineer (Pressure Vessel and Equipment Dept.,)
Project : Diap condenser & Ca facility installation project of
Misubishi Rayan Engineering Co.Ltd.In Rayong (Thailand)
Duties : Planned and controlled schedule; Checked design of Heat Exchanger ;
Clarified and settle concept design with owner; Coordinate and supervise
with subcontractor and fabricator.
October’2006-March’2007 (Sutee tanker and special trucks Co.,Ltd.)
Position : project engineer (Pressure Vessel and Equipment Dept.,)
Project : Methyl Ester plant of Thai Oleochemical Co., Ltd. , In Maptaphut , Rayong (Thailand) of
SHEDDEN UHDE(THAILAND)LTD.,
Duties : Planned and controlled schedule; Checked design of pressure vessel ;
Clarified and settle concept design with owner; Coordinate and supervise
with subcontractor and fabricator.

April’2006-Sepemder ‘2006 (Sutee tanker and special trucks Co.,Ltd.)


Position : project engineer (Pressure Vessel and Equipment Dept.,)
Project : TEC-3 project of Thai Epoxy ( Thailand) Co., Ltd. , In Maptaphut , Rayong
Page 6 of 7

Duties : Planned and controlled schedule; Checked design of heat pressure vessel
; Clarified and settle concept design with owner; Coordinate and supervise
with subcontractor and fabricator .

Fab’2005-Aug’2005 (Sutee tanker and special truck Co.,Ltd.)


Position : project manager (Pressure Vessel and Equipment Dept.,)
Project : KRT-II project of Kansai Resin ( Thailand) Co., Ltd. , In Eastern seaboard , Rayong
Duties : Planned and controlled schedule; Checked design of heat exchanger ;
Clarified and settle concept design with owner; Coordinate and supervise
with subcontractor and fabricator.

Fab’2004-Oct’2004(Sutee tanker and special truck Co.,Ltd.)


Position : project engineer (Pressure Vessel and Equipment Dept., )
Project : MT- Project MC-TOWA International Sweenterner Co., ltd ,Rayong
Duties : Planned and controlled schedule and manpower; Prepared drawing for
fabrication pressure vessel and tank ; Coordinate and supervise with
subcontractor and fabricator.

Jan’2003-June’2003(Sutee tanker and special truck Co.,Ltd.)


Position : Project engineer (Pressure Vessel and Equipment Dept.)
Project : KAO-T Project., Rayong
Duties : Planned and controlled schedule and manpower; procurement work,
Fabrication procedure prepare, welding procedure prepare,
Materials procurement.

Jun’2003-Dec’2003 (Sutee tanker and special truck Co.,Ltd.)


Position : Project engineer (Pressure Vessel and Equipment Dept., )
Project : ECC-Expansion-120KL of Eastern chemical Co., Ltd., Chonburi
Duties : Planned work schedule and manpower, fabrication procedure prepare,
Welding procedure prepare , Material procurement.

June’1997-Aug’1999 (BKK & VOW Co.,Ltd.)


Position : Production engineer
Project : Electrostatic precipitator (8000 TON)
Duties : Planned work schedule and manpower, fabrication procedure prepare,
welding procedure prepare.

Sep’1996-May’1997 (Vatanaphaisal Co.,Ltd.)


Page 7 of 7

Position : Site engineer


Project : Bag filter (350 ton)
Duties : Planned work schedule and manpower , fabrication , erection procedure
prepare, welding procedure prepare
May’1995-Aug’1996 (Vatanaphaisal Co.,Ltd.)
Position : Site engineer
Project : Piping 35000 DB. THAI AROMATIC PLC.
Duties : Planned work schedule and manpower , fabrication , erection procedure
prepare, welding procedure prepare
Extra Experience :
-Design & prepared specify for lorry tanks follow Department of
Transportation ( DOT) and Department of Industries Work( DIW)
Such as gas tank s, oil tanks , chemical tanks , bulk tank s, etc.
-engineer(ME) license level II of council of engineers thailand

You might also like