#2 Report of Supermarket Improvement Team
#2 Report of Supermarket Improvement Team
19 April 2016
Martinus T.S
PPC Engine Plant PT MITSUBISHI KRAMA YUDHA MOTORS AND MANUFACTURING Internal
MKM-FORM-01/2013
(REMINDER)
4.50 4.50
3.00 3.00
Minute
Minute
2.88
2.50 2.77 2.50 2.77 2.88
2.42
2.00 2.00
1.50 1.50
1.00 1.00
1.05
0.50
0.50
0.00
0.00
Edy-san Arip-san Agus-san Jaja-san
Edy-san Arip-san Agus-san (RH) Jaja-san (LH)
(RH/LH)
: C/T Unpacking
C/T Unpacking :C/T Belanja
C/T Belanja :C/TTarget
Setting :C/T Target
C/T Supermarket : C/T Unpacking
C/T Unpacking :C/T Belanja
C/T Belanja :C/TTarget
Setting :C/T Target
C/T Supermarket
LEGENDS:
ARIP EDY
: Daisha Transfer
AGUS JAJA
: Daisha Standard
RH RH LH LH
IN OUT
IN OUT
W/M W/M CB
W/M CS
CH
JAJA
Operator Belanja Operator Belanja Operator Belanja Operator Setting
ARIP EDY ARIP EDY
AGUS JAJA
AGUS
RH RH LH LH RH RH LH LH
OUT OUT
IN IN
Input part to Rack not yet setting condition Input part to Rack has been Setting condition per 6 unit by
Operator Setting
BEFORE 4.12
AFTER 4.6
SUPERMARKET
4.50 4.60 ASSY LINE-2 TARGET 2.83
3.50
Minute
1.50
1.00
1.05
0.50
0.00
Edy-san Arip-san Agus-san Jaja-san
(RH/LH)
: C/T Unpacking :C/T Belanja :C/T Setting
Cycle Time
JOB DESC. DESCRIPTION (Old)
LEGENDS:
ARIP EDY
: Daisha Transfer
Rack, Kitting Part, &
Arip-San 2.88
2.58 #2 AGUS JAJA
Setting 8 Item Small Part : Daisha Standard
UNPACKING
Washing Machine & : Route of Op. Belanja
Edy-San 2.77
Kitting Part
Rack RH Agus-San
Jaja-San 4.12
2.78
RH RH LH LH
BELANJA #1
Rack LH & Setting 8 Item
Rack Agus-San 2.45
SmallLH
Part Jaja-San 2.42
2.74
IN OUT
IN OUT
W/M W/M CB
W/M CS
CH
4 4.12
3.5
Target C/Time = 2.83
3
2.88
Menit / Unit
1.5 B B B B
E A E A E A E A
1 F F F F F F F F
O T O T O T O T
0.5 R E R E R E R E
E R E R E R E R
0
Arip-San Edy-San Agus-San Jaja-San
BEFORE AFTER
REMARK
Cycle Time Cycle Time
JOB DESC. DESCRIPTION (Old) JOB DESC. DESCRIPTION (New)
QTY Supply /
12 unit
QTY Supply /
12 unit
DAISHA SUPERMARKET F/L KIRI (LH) DAISHA SUPERMARKET F/L KANAN (RH) BOX KITTING F/L
P - 12
Prod. Engine Dept. MKM-FORM-02/2011
4.4 IMPROVEMENT SUPPLY
Legends
: Daisha Transfer
: Daisha Standard
2 QTY Belanja / 1 unit 1 QTY Belanja / 1 unit
1
~ 5 : Big Part
1 1
5 : Polybox Khusus
2 2
4 4
: Route Op. Belanja
5 5
5 5
IN OUT
W/M W/M CB
W/M CS
CH
MERIT DEMERIT
1. Reduce 1 Manpower PPC 1. Additional Daisha Transfer (2 unit)
2. Additional Polybox & Attachment (10 pcs)
PPC Engine Plant MKM-FORM-02/2013 P- 14
4.5 DETAIL “BELANJA” ACTIVITY
Cycle Time
DESCRIPTONS
(Menit/Unit)
BEFORE 2.78
AFTER 2.817
SUPERMARKET
TARGET 2.83
ASSY LINE-2
STATUS G
Improvement Condition
2cm
measurement of height of the measurement of thick "sheet began today, all of daisha use only "1
"base" to "edges" = 2,30cm mapping" = 0.30 cm mapping sheet" which is at once as a
"base sheet"
1 Working Hour 7 7 7 7 7
ETA
1 Order Material By PE
3 Actual 14 14 28
BEFORE AFTER
PPC Engine Plant MKM-FORM-02/2013
PPC Engine Plant MKM-FORM-02/2013
SCHEDULE STOPPER DAISHA
3 Actual 0
TOTAL 4 2 2
NOTE: REDUCE --> MANPOWER ASSY LINE-1 = 1
MANPOWER ASSY LINE-2 = 1
2016
No. Description
Feb Mar Apr May Jun Jul
1.4. Evaluation
1.5. Summary
2.4. Evaluation
2.5. Summary
3.4. Evaluation
3.5. Summary