The work log provides details of Rahulkumar Sarvaiya's work for weeks 3 and 4. In week 3, they had lectures introducing upcoming tasks and discussed work plans with assignments. Research was done on designs and a selection was made. In week 4, a progress report included design changes. The team researched improvements to reduce cost, quality, and time. Research was also conducted on upcoming tasks and a vendor was contacted.
The work log provides details of Rahulkumar Sarvaiya's work for weeks 3 and 4. In week 3, they had lectures introducing upcoming tasks and discussed work plans with assignments. Research was done on designs and a selection was made. In week 4, a progress report included design changes. The team researched improvements to reduce cost, quality, and time. Research was also conducted on upcoming tasks and a vendor was contacted.
The work log provides details of Rahulkumar Sarvaiya's work for weeks 3 and 4. In week 3, they had lectures introducing upcoming tasks and discussed work plans with assignments. Research was done on designs and a selection was made. In week 4, a progress report included design changes. The team researched improvements to reduce cost, quality, and time. Research was also conducted on upcoming tasks and a vendor was contacted.
Sunday Monday Tuesday Wednesday Thursday Friday Saturday Week Number: #3 Week of September 17th, 2023, We had the lecture telling us what we will be doing in the coming Researched about Report Work Description days. the design. Formatting WBS ID Planned HOURS 3 4 2 ACTUAL HOURS 3 4.5 1.5 By the end of the week, we had a few designs having their We had few Discussed what we are own advantages and suggestions going to do through the disadvantages. from the week. Assigned Selected the design professor. different individual task we are moving Worked on OUTPUT to every member. forward with. them. Work Log Template
Last Name, First Name Sarvaiya, Rahulkumar
Sunday Monday Tuesday Wed Thursday Fri Saturday Week Number: #4 Week of Progress Report Design Consideration Research September 24, Changes 2023, WBS ID HOURS 3 3 4 ACTUAL 4.5 3 3 HOURS OUTPUT A few changes Everybody was told in Did some research on were made our group to research a the coming tasks that according to the few changes in the we will be doing in the requirement. i.e., current design so that coming week. Did some milestones the cost, quality and checking on the manufacturing time can material. Found a be reduced. vendor and inquired a few things about the project.