PROJECT:

PERTOKOAN UBUD

OWNER / CLIENT:
ATAP
+6.90

COKDE PRIMANANDA

ARCHITECT:

ATAP BAJA RINGAN

STRUCTURE:

RING BALOK 15/15

LEHERAN ATAP INTERIOR / M.E:

BALOK ANAK
TALANG AIR PVC
RING BALOK
+ 4.05
PROGRESS ISSUE:
650

PLANG COVER
N% YOUR PROGRESS SUBMIT DATE

- - -

DAK BETON - - -

+3.40 LISPLANG BETON/ COR - - -


400

- - -

- - -
PLAFOND GYPSUM
+ 3.00 - - -
PLAFOND GYPSUM - - -
+ 3.00
- - -

- - -

NOTE FOR CONSTRUCTION:


3000

KEYPLAN:

PAS. KERAMIK
SLOOF 15/20

TOKO
TOILET ± 0.00
-0.03 PONDASI MENERUS
TOKO TERAS
± 0.00 - 0.20
TERAS PARKIR
- 0.20 - 0.40
PAVING
TANAH ASLI - 0.40
- 0.50

PONDASI MENERUS
CONFIRMATION:
- 1.30

1300 7200 1500 5000

SHEET TITLE:

POTONGAN A

SHEET NUMBER:

POTONGAN A
SCALE 1:50
AR 03