Division : Solar Panel

PRODUCTION DAILY REPORT Area


Machine / Line
: Assy Battery
: Assy Line 1
Periode / Wk
PT FOKUS INDO LIGHTING
MANUFAKTUR DEPT Year
: 43
: 2023
Working Hour Over head
C/T
Start Finish Istirahat Total Jumlah Manhour Over time
Date Day Part Name Code Jam -- Menit Jam -- Menit ( Menit ) ( Menit ) Operator ( Menit ) ( Menit ) ( Menit )

23-Oct-23 Senin BATTERY LITHIUM (LiFePO4)PRISMATIC PJUTS ZWAYN 8 0 17 0 60 480 10 4,800 1.92
- -
- -
- -
- -
- -
24-Oct-23 Selasa BATTERY LITHIUM (LiFePO4)PRISMATIC PJUTS ZWAYN 8 0 17 0 60 480 10 4,800 1.92
- -
- -
- -
- -
- -
25-Oct-23 Rabu BATTERY LITHIUM (LiFePO4)PRISMATIC PJUTS ZWAYN 8 0 17 0 60 480 10 4,800 1.92
- -
- -
- -
- -
- -
26-Oct-23 Kamis BATTERY LITHIUM (LiFePO4)PRISMATIC PJUTS ZWAYN 8 0 17 0 60 480 10 4,800 1.92
- -
- -
- -
- -
- -
27-Oct-23 Jumat BATTERY LITHIUM (LiFePO4)PRISMATIC PJUTS ZWAYN 8 0 17 0 135 405 10 4,050 1.92
- -
- -
- -
- -
- -
28-Oct-23 Sabtu - -
- -
- -
- -
- - -
- - -
29-Oct-23 Minggu - - -
- - -
- - -
- - -
- - -
- - -

Measurement UNIT Analysis


Effisiensi Produksi % 100%
Utilize Man Power % 97%
Utilize Mesin % #REF!
Quantity Hasil Pcs 1210
Over Time Man Hour -
Prosentase Over Time % 0.00%
Mesin Terpakai MC Hour 39
Jumlah Operator line Orang 3
AEP/PML/PROD/02/01
: Solar Panel PREPARED CHECKED
: Assy Battery
: Assy Line 1

TEAM LEADER LEADER


Quantity Remark Remark Remark
Eff Prod Utilize
Target Hasil
Pcs Pcs Per Job Average Man Power

250 250 100%

100% 100%

250 250 100%

100% 100%

250 250 100%

100% 100%

250 250 100%

11.52
100% 100%

211 210 100%

100% 84%

Improvement

AEP/PML/PROD/02/01
Division : Luminer PREPARED CHECKED
PRODUCTION DAILY REPORT Area
Machine / Line
: Assy Battery
: Assy Line 2
Periode / Wk : 43
PT FOKUS INDO LIGHTING
MANUFAKTUR DEPT Year : 2023 TEAM LEADER LEADER
Working Hour Over head Quantity Remark
C/T Eff Prod Utilize
Start Finish Istirahat Total Jumlah Manhour Over time Target Hasil
Date Day Part Name Code Jam -- Menit Jam -- Menit ( Menit ) ( Menit ) Operator ( Menit ) ( Menit ) ( Menit ) Pcs Pcs Per Job Average Man Power

23-Oct-23 Senin - -
- -
- -
0%
- -
- -
- -
24-Oct-23 Selasa - -
- -
- -
0%
- -
- -
- -
25-Oct-23 Rabu - -
- -
- -
0%
- -
- -
- -
26-Oct-23 Kamis - -
- -
- -
0%
- -
- -
- -
27-Oct-23 Jumat - -
- -
- -
0%
- -
- -
- -
28-Oct-23 Sabtu - -
- -
- -
0%
- -
- - -
- - -
29-Oct-23 Minggu - - -
- - -
- - -
- - -
- - -
- - -

Measurement UNIT Analysis Improvement


Effisiensi Produksi %
Utilize Man Power %
Utilize Mesin % #REF!
Quantity Hasil Pcs 0
Over Time Man Hour -
Prosentase Over Time % 0.00%
Mesin Terpakai MC Hour -
Jumlah Operator line Orang 3
AEP/PML/PRO-ASSY/02/01 Rev. 01
Division : Luminer PREPARED CHECKED
PRODUCTION DAILY REPORT Area
Machine / Line
: Assy Box
: Assy Line 3
Periode / Wk
PT FOKUS INDO LIGHTING
MANUFAKTUR DEPT Year
: 43
: 2023 TEAM LEADER LEADER
Working Hour Over head Quantity Remark
C/T Eff Prod Utilize
Start Finish Istirahat Total Jumlah Manhour Over time Target Hasil
Date Day Part Name Code Jam -- Menit Jam -- Menit ( Menit ) ( Menit ) Operator ( Menit ) ( Menit ) ( Menit ) Pcs Pcs Per Job Average Man Power

23-Oct-23 Senin BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 8 0 17 0 60 480 6 2,880 3.84 125 125 100%
- -
- -
100% 100%
- -
- -
- -
24-Oct-23 Selasa BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 8 0 17 0 60 480 6 2,880 3.84 125 125 100%
- -
- -
100% 100%
- -
- -
- -
25-Oct-23 Rabu BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 8 0 17 0 60 480 6 2,880 3.84 125 125 100%
- -
- -
100% 100%
- -
- -
- -
26-Oct-23 Kamis BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 8 0 17 0 60 480 6 2,880 3.84 125 125 100%
- -
- -
100% 100%
- -
- -
- -
27-Oct-23 Jumat BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 8 0 17 0 135 405 6 2,430 3.84 105 105 100%
- -
- -
100% 84%
- -
- -
- -
28-Oct-23 Sabtu - -
- -
- -
- -
- - -
- - -
29-Oct-23 Minggu - -
- - -
- - -
- - -
- - -
- - -

Measurement UNIT Analysis Improvement


Effisiensi Produksi % 100%
Utilize Man Power % 97%
Utilize Mesin % #REF!
Quantity Hasil Pcs 605
Over Time Man Hour -
Prosentase Over Time % 0.00%
Mesin Terpakai MC Hour 39
Jumlah Operator line Orang 3
Division : Luminer PREPARED CHECKED
PRODUCTION DAILY REPORT Area
Machine / Line
: Assy Box
: Assy Line 4
Periode / Wk : 43
PT FOKUS INDO LIGHTING
MANUFAKTUR DEPT Year : 2023 TEAM LEADER LEADER
Working Hour Over head Quantity Remark
C/T Eff Prod Utilize
Start Finish Istirahat Total Jumlah Manhour Over time Target Hasil
Date Day Part Name Code Jam -- Menit Jam -- Menit ( Menit ) ( Menit ) Operator ( Menit ) ( Menit ) ( Menit ) Pcs Pcs Per Job Average Man Power

23-Oct-23 Senin BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 4 8 0 17 0 60 480 6 2,880 3.84 125 121 97%
- -
- -
97% 100%
- -
- -
- -
24-Oct-23 Selasa BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 8 0 17 0 60 480 6 2,880 3.84 125 125 100%
- -
- -
100% 100%
- -
- -
- -
25-Oct-23 Rabu BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 8 0 14 50 45 365 6 2,190 3.84 95 95 100%
BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 14 50 16 20 15 75 6 450 3.84 20 20 102%
BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES 16 20 16 35 15 6 90 3.84 4 4 102%
99% 100%
BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES 16 35 17 0 25 6 150 3.84 7 6 92%
- -
- -
26-Oct-23 Kamis BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 8 0 17 0 60 480 6 2,880 3.84 125 125 100%
- -
- -
100% 100%
- -
- -
- -
27-Oct-23 Jumat BATTERY BOX 25.6V 40Ah INCLUDE SCC-LED DRIVER AND CABLE-ACCECORIES IND 5 8 0 17 0 135 405 6 2,430 3.84 105 105 100%
- -
- -
100% 84%
- -
- -
- -
28-Oct-23 Sabtu - -
- -
- -
- -
- - -
- - -
29-Oct-23 Minggu - -
- - -
- - -
- - -
- - -
- - -

Measurement UNIT Analysis Improvement


Effisiensi Produksi % 99%
Utilize Man Power % 97%
Utilize Mesin % #REF!
Quantity Hasil Pcs 601
Over Time Man Hour -
Prosentase Over Time % 0.00%
Mesin Terpakai MC Hour 39
Jumlah Operator line Orang 3
Division : Solar Panel PREPARED CHECKED APPROVED
PRODUCTION WEEKLY REPORT Area : Assy Battery
Machine / Line : Assy Line
Periode / Wk : 43
PT ADYAWINSA ELECTIRCAL AND POWER
MANUFAKTUR DEPT Year : 2023 T LEADER SECT HEAD DEPT HEAD

120%
Effisiensi Produksi
99.6% 97%
100%
Utilize Man Power

80%
Effisiensi Produksi Target

60%
Utilize Man Power Target

40%
Prosentase Over Time

20%

0%
BATT 1 BATT 2 ASSY BOX 1 ASSY BOX 2 AVERAGE

MEASUREMENT UNITS BATT 1 BATT 2 ASSY BOX 1 ASSY BOX 2 AVERAGE Manpower Jumlah
Effisiensi Produksi % 100% 100% 99% 99.6% Battery 10
Utilize Man Power % 97% 97% 97% 97% Box Batt 12
Effisiensi Produksi Target % 98% 98% 98% 98% 98%
Utilize Man Power Target % 90% 90% 90% 90% 90%
Quantity Hasil Pcs 1210 0 605 601 2416
Over Time Man Hour 0 0 0 0 0.0 Total 22
Prosentase Over Time % 0.00% 0.00% 0.00% 0.00% 0.00% Man Hr/wk 814
Mesin Terpakai MC Hour 39 0 38.8 38.8 116.3
AEP/PML/PRO-ASSY/02/03 Rev. 01

Analisa:
Battery 40Ah 1210 Unit
Battery Box 1206 Unit

Improvement: