Professional Documents
Culture Documents
Valuline Antennas Interface
Valuline Antennas Interface
Installation Instructions
0.3m(1ft) & 0.6m(2ft)
Description
In order to change polarization of single polarized antennas
from vertical (factory pre-set) to horizontal. it will be
2
necessary to rotate the output transition .This is done by Change of Polarization methode
loosening the attachment screws, rotating the transition 90° (Direct Integration Antennas Only)
clockwise and re-tightening the attachment screws. Note Alignment of timing
Note Alignment of pins slot in transition with timing
"Please note, polarization adjustment is not required letters on mounting ring
in transition
for remote mount assembly options"
Notice
The installation, maintenance, or removal of antenna
systems requires qualified, experienced personnel.
Andrew installation instructions have been written for
such personnel. Antenna systems should be inspected
once a year by qualified personnel to verify proper installation,
maintenance, and condition of equipment.
1
Note Alignment of timing Loosen screws (6 places) until
Note Alignment of pins
slot in transition with timing transition can rotate freely, then
in transition
letters on mounting ring rotate transition hub 90 deg. until it
"locates" in timing recess.