N°° 5 – Risks
Module N
1
12/28/2009
Risks
Safety Module10
Management
Phased approach to SMS
i l
implementation
i
Module3
Module1 Module2 Module4
Introduction to safety
SMS course introduction Basic safety concepts Hazards
management
2
12/28/2009
Risks
3
12/28/2009
Risks
4
12/28/2009
Risks
What is it?
• The identification, analysis and elimination, and/or
mitigation to an acceptable level of risks that threaten
the capabilities of an organization.
Wh
Whatt iis th
the objective?
bj ti ?
• Aims at a balanced allocation of resources to address
all risks and viable risk control and mitigation.
Why is it important?
• A key component of safety management systems.
• Data‐driven approach to safety resources allocation,
allocation
thus defensible and easier to explain.
☺ June 2008 ‐ Rev.1 KAC ‐ Safety Management Training ‐ Module # 5 5
5
12/28/2009
Risks
6
12/28/2009
Risks
Definition(s)
Probability – The likelihood that an unsafe event or
condition might occur.
7
12/28/2009
Risks
8
12/28/2009
Risks
… questions such:
• What number of operating or maintenance
personnel must follow the procedure (s) in
question?
• How frequently is the equipment or procedure
under assessment used?
9
12/28/2009
Risks
Probability of occurrence
Qualitative
Meaning Value
definition
Remote Unlikely,
y but possible
p to occur ((has occurred rarely)
y) 3
Extremely
improbable
Almost inconceivable that the event will occur 1
10
12/28/2009
Risks
Definition(s)
( )
Severity – The possible consequences of an unsafe
event or condition,, taking
g as reference the worst
foreseeable situation.
11
12/28/2009
Risks
12
12/28/2009
Risks
13
12/28/2009
Risks
… questions:
What is the severity of the property or financial damage?
• Direct operator property loss
• Damage to aviation infrastructure
• Third party damage
• Financial impact and economic impact for the State
14
12/28/2009
Risks
Severity
y of occurrences
Aviation
Meaning Value
definition
• Equipment destroyed
Catastrophic
p • Multiple deaths A
• A large reduction in safety margins, physical distress or a workload
such that the operators cannot be relied upon to perform their tasks
Hazardous accurately or completely. B
• Serious injury or death to a number of people.
• Major equipment damage
• A significant reduction in safety margins, a reduction in the ability of
the operators to cope with adverse operating conditions as a result
of increase in workload, or as a result of conditions impairing their
Major efficiency. C
• Serious incident
incident.
• Injury to persons.
• Nuisance.
• Operating limitations.
Minor • Use of emergency procedures. D
• Minor incident
incident.
15
12/28/2009
Risks
Risk severity
5 – Frequent 5A 5B 5C 5D 5E
4 – Occasional 4A 4B 4C 4D 4E
3 – Remote 3A 3B 3C 3D 3E
2 – Improbable 2A 2B 2C 2D 2E
1 – Extremely
E t l
improbable
1A 1B 1C 1D 1E
16
12/28/2009
Risks
Acceptable after
4D, 4E, 3D, 2C, 1A, 1B review of the operation
3E 2D
3E, 2D, 2E
2E, 1C
1C, 1D
1D, 1E Acceptable
17
12/28/2009
Risks
NO
YES Take action to reduce RISK
A
Accept
t the
th risk(s)
i k( ) the risk(s) to an CONTROL/MITIGATION
acceptable level
18
12/28/2009
Risks
Definition(s)
Mitigation – Measures to eliminate the potential
hazard or to reduce the risk probability or severity.
• Risk mitigation = Risk control
19
12/28/2009
Risks
Strategies
Avoidance
A oidance – The operation or activity
acti it is
cancelled because risks exceed the benefits
of continuing the operation or activity.
• Operations into an aerodrome surrounded by
complex geography and without the necessary
aids are cancelled.
cancelled
20
12/28/2009
Risks
Strategies
Reduction –The frequency of the operation
or activity is reduced, or action is taken to
reduce the magnitude of the consequences
off the
h accepted d risks.
k
• Operations into an aerodrome surrounded by
complex geography and without the necessary
aids are limited to day‐time, visual conditions.
21
12/28/2009
Risks
Strategies
Segregation of exposure – Action is taken
to isolate the effects of risks or build‐in
redundancy to protect against it.
• Operations into an aerodrome
O d surrounded
d db by
complex geography are limited to aircraft with
specific navigation capabilities.
• N RVSM equipped
Non i d aircraft
i f not allowed
ll d to
operate into RVSM airspace.
22
12/28/2009
Risks
23
12/28/2009
Risks
24
12/28/2009
Risks
Hazard Assessment of the Controll and
C d Accepting the
identification defences within mitigation mitigation of
and the risk
risk management the safety system of the risk (s)
25
12/28/2009
Risks
26
12/28/2009
Risks
Iss the
t e risk
s level
e e acceptab
acceptable?
e No
Take action and
continue the Yes
operation
27
12/28/2009
Risks
28
12/28/2009
Risks
Scenario:
S i
Fuel spill on the apron area surface of approximately 25
m (75 ft)) length
g and 5 m ((155 ft)) width,, p
produced byy an
A310 ready to pushback and taxi for departure.
Report
p by
y the apron
p responsible
p p
person:
After the A310 pushback the spill was contained and the
apron area was decontaminated.
29
12/28/2009
Risks
Hazard:
Risk probability
Risk severity
Risk(s):
Risk index
Risk
t l bilit
tolerability
30
12/28/2009
Risks
Scenario:
It was observed that airline baggage handling personnel
generates FOD on the aerodrome apron area .
Report by the apron responsible personnel:
It should be noted that airline baggage handling
personnel are not complying with safety standards as
set in the aerodrome operating manual. This is
considered a hazard that can produce incident or
accident in the movement area.
31
12/28/2009
Risks
Hazard:
Risk probability
Risk severity
Risk(s):
Risk index
Risk
t l bilit
tolerability
32
12/28/2009
Risks
Scenario:
A parked aircraft shows damage in the left wing root
near the fuselage. Such damage was caused by a
g the aircraft as a consequence
maintenance stair hitting q of
the wind, apparently because the stair was not properly
restrained .
Report
p by
y the apron
p responsible
p p
person:
In conditions of strong winds it is essential that all
equipment around aircraft is properly restrained and
locked, thus preventing the possibility of aircraft
d
damage.
33
12/28/2009
Risks
Hazard:
Risk probability
Risk severity
Risk(s):
Risk index
Risk
t l bilit
tolerability
34
12/28/2009
Risks
Scenario:
The vehicle and ramp equipment parking area behind
the fingers shows a large amount of FO(D) (food, trays,
plastics, pillows, etc.) left behind by an airline.
35
12/28/2009
Risks
Hazard:
Risk probability
Risk severity
Risk(s):
Risk index
Risk
t l bilit
tolerability
36
12/28/2009
Risks
Scenario:
A loose wheel, apparently from a baggage cart, was
observed in the handling area. The driver apparently did
not notice what happened. The wheel rolled at high speed
through
h h the
h area, hitting
hi i the h fence
f accessing
i the
h fuel
f l zone.
Report by the apron responsible person:
This could have caused injuries to ramp personnel in
addition
dditi tot material
t i l damage
d to
t equipment
i t and/or
d/
aerodrome facilities. We have insisted in the past on the
periodic verification of all equipment and vehicles that
operate
ope ate in tthee ae
aerodrome
od o e ap
apron
o aarea.
ea.
37
12/28/2009
Risks
Hazard:
Risk probability
Risk severity
Risk(s):
Risk index
Risk
t l bilit
tolerability
38
12/28/2009
Risks
Scenario:
The absence of airline personnel attending the stairs was
observed in three occasions, in flights from different
companies.
i ThThe presence off airline
i li personnell iis necessary
to guide passengers when embarking and disembarking.
Report by the apron responsible personnel:
This is a risk for passengers, since they should access the
apron to board aircraft in an orderly manner under the
guidance of airline personnel.
39
12/28/2009
Risks
Hazard:
Risk probability
Risk severity
Risk(s):
Risk index
Risk
t l bilit
tolerability
40
12/28/2009
41
12/28/2009
Risks
42
12/28/2009
Risks
43
12/28/2009
Risks
44
12/28/2009
Risks
1.
1 The risk assessment matrix.
matrix
2. The risk assessment criteria table.
3 Risk mitigation: avoid,
3. avoid reduce
reduce, segregate
segregate.
45
12/28/2009
Risks
Module N°
N° 5 is concluded
46