You are on page 1of 5

CFO COMPLIANCE REPORT

Condition Wise Compliance Report BY M/S K RAHEJA CORP. PVT. LTD.


SurveyNo.2/1(P),2/2(P),2/3(P),2/4(P),6,7,8,9&10pocharam(V),Ghatkesar(M)Rangareddy
District-CFO Order TSPCB/17428/CFO/RO-RR-I/HO/2015-434;Dated 30.05.2015

S. No. SCHEDULE -A
1. The applicant shall make application for renewal of In process.
consent (Under water and Air Acts) and Authorization
under HWM Ruler at least 120 days before the date of
expiry of this order, along with prescribed fee under
water and Air Acts for obtaining consent & HW
Authorization of the board.
2. This order is issued in line with CFO order dt 07.06.2014 Noted.
.Concealing the factual data or submission of false
information/fabricated data and failure to comply with
any of the conditions mentioned in this order may
result in withdrawal of this order and attract action
under the provisions of relevant pollution control
Acts.The industry shall comply with all other conditions
of CFO order dt 07.06.2014 still applicable.
3. Any person aggrieved by an order made by the state Noted.
Board under Section 25,Section 26,Section 27 of water
Act,1974 or section 21 of Air Act,1981 may within thirty
days from the date on which the order is
communicated to him, prefer an appeal as per
Telangana State water Rules,1976 and Air Rules
1982,to such authority (hereinafter referred to as the
Appellate Authority)constituted under section 28 of the
water (Prevention and control of pollution)Act,1974
and section 31 of the Air(Prevention and control of
pollution)Act,1981.
4. The project may explore the possibility of tapping more Noted.
solar energy for their energy requirements.
5. The Board reserves its right to modify above conditions Noted.
or stipulate any further conditions and to take action
including revoke of this order in the intrest of
protection of public health and environment.
SCHEDULE –B
S.No
1 The Project shall not carry out any new activity Noted.
without obtaining prior consent for establishment
(CFE) and Consent for operation (CFO)of the Board.
2. The Project shall take steps to reduce water Noted.
consumption to the extent possible and
consumption should NOT exceed the quantities
mentioned below:
S.NO Purpose Quantity(KLD)
1. Domestic(Fresh Water - 186.18
57.78 KLD,Recycled for
(Flushing)128.4 KLD)
2. HVAC 92.72
3. Gardening 10.00
Total 288.90
3. The effluent discharged should not contain Noted.
constituents in excess of the tolerance limits
prescribed below
Outlet Parameter Limiting
No Standards
1 pH 6.0 – 9.0
Oil & Grease 10mg/l
Biochemical Oxygen Demand ≤10 mg/l
(BOD)
Chemical Oxygen Demand 250 mg/l
(COD)
Ammonical Nitrogen 50 mg/l
Arsenic 0.2 mg/l
Mercury 0.01 mg/l
Lead 1.0 mg/l
Cadmium 1.0 mg/l
Hexavalent Chromium 2.0 mg/l
Total Chromium 2.0 mg/l
Zinc 15 mg/l
Copper 3.0 mg/l
Turbidity NTU ≤2 mg/l
E.Coli (MPN Count/100 ml) None
Residual Chlorine Preferably in
the range of 1
mg/lt -3mg/lt
4. The project should file the water cess returns in Complied.
Form-I as required under section (5) of Water
(Prevention and Control of Pollution) Cess Act, 1977
on or before the 5th of every calendar month,
showing the quantity of water consumed in the
previous month along with water meter readings.
The facility should remit water cess as per the
assessment orders as and when issued by Board.
5. The project should comply with emission limits for Noted.
DG sets up to 800 KW as per the Notification
G.S.R.520 (E), dated 01.07.2003 under the
Environment (Protection) Amendment Rules, 2003
and G.S.R.448(E), dated 12.07.2004 under the
Environment (Protection) Second Amendment
Rules, 2004. In case of DG sets more than 800 KW
should comply with emission limits as per the
Notification G.S.R.489 (E), dated 09.07.2002 at
serial no.96, under the Environment (Protection)
Act, 1986.
6. The project shall comply with ambient air quality Noted.
standards of PM10(Particulate Matter size less than
10 µm) - 100 µg/ m3; PM2.5(Particulate Matter size
less than 2.5 µm) - 60 µg/ m3; SO2 - 80 µg/ m3; NOx
- 80 µg/m3, outside the facility premises at the
periphery of the industry.
Standards for other parameters as mentioned in
the National Ambient Air Quality Standards CPCB
Notification No.B-29016/20/90/PCI-I, dated
18.11.2009
Noise Levels: Day time -(6 AM to 10 PM) - 75 dB (A)
Night time - (10 PM to 6 AM) - 70 dB (A).

7. The project shall provide and maintain separate Complied.


water meters for recording water consumption for
various purposes and also maintain proper daily
records.
8. The project shall operate STP for treatment of domestic Complied.
effluent .The treated domestic effluent shall be recycled
for Toilet flushing ,HVAC and Gardening purpose.
9. The Project shall provide flow meters at inlet and out let Complied.
of STP and maintain log book for operation of STP
10. The project shall develop green belt as per the Complied.
norms.
11. The Project should use STP Sludge as manure and Complied.
should not dispose the sludge outside the premises.
12 The Project shall maintain solar lighting system and Noted and
submit action plan for additional solar power utilization Complied.
to the board within 3 months
13. The Project should not cause any stagnation of waste Noted.
water/ solid waste in the surroundings.
14. The Project should maintain adequate Rain Water Complied.
Harvesting (RWH)Structures within the premises.
15. The Storm water management plan should be Complied.
designed in such a manner that the storm water is
discharged though an existing dedicated Storm
water outfall only. The design should confirm the
existing drainage scheme of the surrounding locality
16. Noise barriers should be provided at appropriate Complied.
locations so as to ensure that the noise levels do
not exceed the prescribed standards. DG sets
should be provided with necessary acoustic
enclosures as per Central Pollution Control Board
norms
17. The plastic wastes should be segregated and Noted.
disposed through recyclers.
18. The applicant shall submit Environment statement Noted.
in Form V before 30th September every year as per
Rule No.14 of E(P) Rules, 1986 & amendments
thereof.
19. The conditions stipulated in this order without any Noted.
prejudice to the rights and contentions of this
Board in any Hon’ble court of Law.
SCHEDULE - C
1. The Construction project should give top priority Complied.
for waste minimization and cleaner production
practices.
2. The Project should not store hazardous waste for Noted.
more than 90 days as per the Hazardous Wastes
(Management. Handling and Trans boundary
Movement) Rules, 2008 and amendments thereof.
3. The project should store Used / Waste Oil and Used Noted.
Lead Acid Batteries in a secured way in their
premises till its disposal.
4. The Project should not dispose Waste oils to the Complied.
traders and the same should be disposed to the
authorized Re processors/ Recyclers.
5. The Project should dispose Used Lead Acid Complied.
Batteries to the manufacturers / dealers on
buyback basis.
6. The Project should take necessary practical steps Noted.
for prevention of oil spillages and carryover of oil
from the premises
7. The Project should maintain good housekeeping & Noted.
maintain proper records for Hazardous Wastes
stated in Authorisation
8. The Project should dispose the e-waste to Noted.
authorised recyclers / re processors only.
9. The Project should submit the condition wise Noted.
compliance report of the conditions stipulated in
Schedule B & C of this Order on half yearly basis to
Board Office, Hyderabad and concerned Regional
Office.