Professional Documents
Culture Documents
Apr-11
The EE, Tr Divn, KPTCL,
mys-215 A 1 mysore @ Hootagalli-H.N. Pura 34254-57 10/2/11
Line in mysore
Global Tech Park (P) Ltd.,
Think Campus, No.42/4A,
BS-90A 2 1962-64 23/4/2010
p.No. 13A, Phase-III, Electronic
City, Bangalre
The EE, Tunga lift Irrigation
Project Divn, KNNL, Shimoga
SMG-223 A 3 39778-81 26/3/11
at Gourapura & gangur site,
Bhadravti Tq., Shimoga
May-11
11-Jun
SJR Enterprises (P) Ltd., SJR
Equinox, S.No. 47/8(P), 47/9(P)
BS-64 A 2 and 47/10, Doddathogur village, 34252-54 1/2/11
Electronic city, Hosur Road,
bangalore
Keppel Purvankara
Development (P) Ltd., Elita
Promonade, phase-II, s.No.
BS-290 3966-69 23/5/11
101/A, 101/2, 103/1,101/b,104p
& 105p, Kothanur village, near
brigade millenium, bangalore
10366-69 22/7/11
Prestige Nottinghill Investment,
S.No. 9, Kalenaagrahara,
Bannerghatta Road, Bangalore 19452-55 25/9/11
Hindustaan Constructions
Company Ltd., Padur Cavern
UDP-345 34139-42 7/2/11
Project, H.No. 18-3(1), Ashitan
Near, Masjid post, Shirva Udupi
Smt.Lalita Shankaranarayan,
345, Bhuwana, 22nd cross, 9th CEIG/ATS-BS-365/13307-
BS-365 2
main, Sector-7, HSR layout, 10/11-12 Dt. 16/8/11
Bangalore-560013
Hassan Institute of Medical
Sciences, DG1-Girls Hostel, CEIG/ATS-HSN-350C/9800-
HSN-350C 3
DG2-Doctors Quarters, DG3- 4/11-12 Dt. 15/7/11
Boys hostel
Maris Spinners Ltd.,
CEIG/EI-2/AEI-2/16103-6/10-
MYS-362 Kattemalavadi-571134, Hunsur,
11 Dt. 31/8/11
Mysore
Cessna Business Park, Phase-
III,(B-06) Block, S.No. 3/2B,
4,,6,7,8/1,8/2,10/1B,10/3, 11,
12/2, 12/3,12/4, 17/1,2,3,4, CEIG/EI-2/AEI-2/28638-
BS-71D
38/2,43,44 & 10/1A, 41/10-11 Dt.20/12/2010
Kadubeesanahalli village,
Marathahalli Outer ring Road,
Bangalore
OCTOBER
Netapp India (P) Ltd., Golf
Link Software Park (P) Ltd.,
S.No. 10/3, Challagatta village, CEIG/ATS-BS-366A/13371-
BS-366A 1
Mahadevapura, Varthur hobli, 74/11-12 Dt.17/8/11
Dommalur Ring road,
Bangalore
Islaamic Academy of
Education, S.No. 222/1
& 222/2, Someshwara village,
Mangalore Tq. & Dist at CEIG/ATS-MNG-340/10216-
MNG-340 2
Building Type A-Dental block 20/11-12 Dt.22/7/11
PG hostel, Building Type B
Physiotherapy & Nursing PG
hostel
CEIG/EI-2/AEI-2/UDP-
Main HT substaiom bearing
184/35794-97/10-11
R.R.No. KHTP-5 Ship Coal
UDP-184 3 Dt.17/2/2010CEIG/ATS/UDP-
Unloading Unit, Stacker Unit
184D/10320-23/11-12 Dt.
Stacker Reclaimer Unit
22/7/11
LT loads to an xtent of
7589KVA for G+5UF (out of
CEIG/ATS-BS-71B/32-35/11-
BS-71B 7 LB+UB+GF+5UF+TF) Phase-
12 Dt.30/7/11
2, Block B-06(out of B-6 & B-
5)
6.305Km of 66KV SC line from
existing 66KV DC T.K.Halli- CEIG/DEI-2/MND-175B/
MND-175B 8
Mandya line to existing 66KV 33351-54/07-08 31/1/08
substation at K.M.Doddi
Schneider Electric India (P)
Ltd., TFC Divn., Attibele, 16th CEIG/ATS-BS-197/17784-
BS-197 9
KM, Attibele Industrial Area, 87/11-12 Dt.21/9/11
bangalore
St.Joseph's College,
CEIG/ATS-BS-361/20378-
BS-361 10 P.B.No.27094,36,Lalbagh
92/11-12 Dt.18/10/11
Road, Bangalore-560027
L.K. Sathyanarayana,
GPA:Janhavi Constructions (P)
Ltd., Janhavi Sheters,
No.30/1(P), Yelenahalli village, CEIG/ATS-BS-373/20354-
BS-373 11
Begur Hobli, Near Yelenahalli 5/11-12 Dt.18/10/11
village, Begur Hobli, Near
Yelenhalli last Bus stop,
Bangalore
LT loads to an extent of
CEIG/ATS-BS-359A/18670-
BS-359A 12 2276.7KW for G+6UF (out of
73/11-12 Dt.26/9/11
B+GF+6UF+TF)
Primal Projects (P) Ltd.,
Pritech-II,SEZ, Bellandur CEIG/ATS-BS-148B/10999-
BS-148B 13
village, Varthur Hobli, 02/11-12 Dt.27/7/11
Bangalore
Nov-11
Mandya Medical College,
Mandya, College Building, CEIG/ATS-MDY-206B/1007-
MDY-206B 1
Mandya Medical College, 10 19/4/11
Mandya
CEIG/DEI-1/BRS-122/7117-
BRS-122 Sri R.M Eswar Naidu 20/09-10
2 S.No.155/1 & 155/1A3, Begur
village, Bangalore CEIG/ATS-BS-335/13327-
BS-335
30/11-12 16/8/11
Presidency Vintage
Commercial/Residential
CEIG/ATS-MNG-371/20422-
Apartments, S.No.1-3,
MNG-371 3 25/11-12 18/10/11 for MSB
T.S.No.738-3A1,Kankanady
HT & 82.5KVA DG set
village, Kankanady Bypass
Road, mangalore
CEIG/ATS-BS-370/15551-
Purvankara Projects Ltd., Purva
54/11-12 Dt. 25/8/11 MSB
BS-370 4 Highlands, S.No.19(P),
wing A to H & J to N &
Mallasandra village, Bangalore
28X500KVA Tc,s
CEIG/ATS-BS-360/12886-
SJR Luxuria, S.No. 100/P1 &
89/11-12 Dt.8/8/11 block A
BS-360 12 103, Arekere village, Begur
to E & 4X500KVA trnsformer
hobli bangalore
and 1X250KVA transf.
M/s Udupi Power Corporation
CEIG/ATS/UDP-184D/
UDP-184D 13 Ltd, Yellur village, pilar post
126742-2311-12 Dt. 14.9.2011
Padubidri, Udupi
Jan-12
m/S Scrip N Scroll (I) Pvt ltd
Sy No, 94/1A, 94/10, 94/2, 95/1 CEIG/DEI-1/BRS-84/18203-
BRS-84 1
& 95/2, Veerasandra Village 05/07-08 DTD 26.7.2008
Electronic city Bangalore
M/S JANHAVI
CONSTRUCTION PVT LTD
S.R.NO.27,
CEIG/ATS/BS-373A/30300-
BS-373A 6 VISHVESHWARAYA MAIN
3/11-12 DTD 19.1.2012
ROAD, BTM 2ND STAGE
R.R LAYOUT OFF: B G
ROAD, BANGALORE
SRI S.M.ARSHAD M/S
MISHIEF/ EXCEL MALL DCEI/MNG/6968-71/11-12
MNG-463 8
K.S.RAO ROAD HAMPANA DTD 17.1.2012
KATTA MANGALORE
JAIN KNOWLEDGE
CAMPUS NO.44/A,
DISTRICT FUND ROAD CEIG/ATS/BS-300/30408-
BS-300 9
BEHINDN BIG BAZAAR, 12/11-12 DTD 28.12.2011
9TH BLOCK JAYANAGAR
BANGALORE
Feb-12
VIKAS TELECOM LTD
PHASE-II SY NO. 8/1-A 9/5,
10/9, 11/9,12/1, 12/9P,13/1,
14/2, 14/5, 14/9, 64, 7, 55/6,
CEIG/ATS/BS-403/23826-
BS-403 1 DEVARABEESANAHALLI
29/11-12 DTD 19.11.2011
VILLAGE SNO. 29/2
KARIYAMMANA
AGRAHARA VILLAGE
VARTHUR BANGALORE
HT Sub-station at M/s.Eshwarr
Steeltech (P) Ltd. No.47A &
DCEI/MNG/F-HT 18/8678-
5 47B, Shimoga-Bhadravathi
92/11 Dtd:01.3.2012
Industrial area, Machenahalli,
Nadige Post, Shimoga.
Date of
Installation Details Catagory of File Date of Closure of File Distructio
n
Apporved Number &
Date
Apr-11
May-11
CEIG/ATSBS-
1 X 750KVA DG SET 185A/12486-90/11- 8/2/2011
12
CEIG/ATS-BS-
LT loads to an extent of 102.4KW at 4th floor 8/3/2011
206/12495-99/11-12
CEIG/ATS-BS-
LT loads to an extent of 90KW at Ground floor 8/3/2011
206D/12505-9/11-12
CEIG/ATS-BS-
1 X 500KVA DG SET 131B/6411-15/11-- 6/16/2011
12
CEIG/ATS-MDY-
1 X 62.5KVA DG SET 8/30/2011
206A/15746-50
CEIG/ATS-MDY-
2 X 62.5KVA DG SET 206D/15751-54/11- 8/30/2011
12
1 x 2500KVA Tr & LT loads 160KW for Steel
CEIG/ATS-MYS-
card Cutter, 33.3KW for ETP panel & 264.5KW 8/18/2011
304/13852-56/11-12
for MCC4 at 1st floor in OTR plant
CEIG/ATS-SMG-
241/16388-92/11-12 03-09-
1.5MW WPP Corrigendum 2011
CEIG/ATS-SMG- 16/9/11
241/16829-34/11-12
CEIG/ATS-BS-
0.0009 Solar Plant 365/16412-16/11-12 03.09.2011
Dt. 3/9/11
CEIG/ATS-BS-
3 x 62.5KVA DG set 9/5/2011
365/16421-25/11-12
CEIG/ATS-BS-
LT loads to an extent of 211KVA for 6th UF 147F/16824-27/11- 9/15/2011
12 Dt. 15/9/11
CEIG/ATS-BS-
LT loads to an extent of 239KW at 7th floor 9/19/2011
336/17273-76/11-12
Electrical fitness
certificate Lr.No.
4screen multiplex CEIG/ATS-MYS- 9/24/2011
195A/18048-52/11-
12 Dt24/9/11
CEIG/ATS-SMG-
241/16388-92/11-12 03-09-
1.5 MW WPP Corrigendum 2011
CEIG/ATS-SMG- 16/9/11
241/16829-34/11-12
CEIG/ATS-BS-
1 X 2000KVA 11/433V TR 366A/20172-77/11- 10/15/2011
12
CEIG/ATS-BS-
LT loads to an extent of 2276.7KW for G+6UF
359A/18670-73/11- 10/20/2011
(out of B+GF+6UF+TF)
12 Dt.20/10/11
CEIG/ATS-BS-
2 X 2200KVA DG SET 148B/20720-24/11- 10/20/2011
12 Dt.20/10/11
CEIG/ATS-BS-
1 X 1010KVA DG SET 193/20495-81/11-12 2/24/2011
Dt.24/2/11
CEIG/ATS-BS-
MSB B+G+MF+1UF(out of B+G+Mz+3UF's &
405/22014-18/11-12 10/28/2011
1 X 2000KVA TR
Dt.28/10/11
CEIG/ATS-BS-
LT loads to an extent of 226.947KW for 7th UF
147A/22032-35/11- 10/28/2011
(out of LB+UB+GF+9UF+TF)
12 Dt.28/10/11
CEIG/ATS-UDP-
GF+14UF+TF 260/22065-69/11-12 10/28/2011
Dt.28/10/11
CEIG/ATS-BS-
Solar Plant Online grid connected 50.4KWp
367/22105-9/11-12 10/29/2011
Power conditioning/GTR capacity 75KVA
Dt.29/10/11
Nov-11
CEIG/ATS-BS-
1 X 250KVA DG SET 206B/22759-63/11- 11/5/2011
12 Dt.5/11/11
CEIG/ATS-MNG-
MSB having B3+B2+B1+G+8UF & 1 X
371/24320-24/11-12 11/21/2011
500KVA TR
21/11/11
CEIG/ATS-BS-
MSB consisting of Wing L,N,G,J Wing L&N
370/24341-45/11-12
having G+20UF+TF and Wing G&J having
Dt.21/11/11 MSB 11/21/2011
B2+B1+ G+20UF+TF along with 8X500KVA
wing L N G J &
11KV/433V TCs
8X500KVA Tc,s
CEIG/ATS-SMG-
1.5MVA TR & 1 X 1000KVA TR & Additional
356/23603-07/11-12 16/11/11
LT loads to an exent of 600KVA
16/11/11
LT loads to an extent of 4104KW for 2nd & 3rd
floor of wing 1 & 2 and 4th floor of wing2 for CEIG/ATS-BS-
Juniper Networks India (P) Ltd., at Exora 269D/23711-14/11- 16/11/11
Business Park (P) Ltd., s.No,111 to 115, 12 Dt. 17/11/11
Bellandur village, Bangalore
CEIG/ATS-MNG-
1 X 125KVA DG SET 319/24465-69/11-12 40869
Dt.22/11/11
CEIG/ATS-MNG-
5No.s screen 308A/25932-36/11- 40875
12 Dt.28/11/11
CEIG/ATS-BS-
MSB having three blocks B, C & E (out of A to 360/24350-54/11-12
E), each block having B+G+6UF+TF and Dt.21/11/11 block
40868
3X500KVA LT transformer (out of 4X500KVA B C & E &
trnsformer and 1X250KVA transf.) 3X500KVA
trnsformer
3Cx150SQMM, 11KV XLPE Cable drawn
from coal handling Plant to proposed Ash Dyke
CEIG/ATS/
system to a length of 5kms & 1x500KVA,
UDP184/30330- 28.12.2011
11kv/433v Transformer for ash dyke system
34/11-12
connected to the main EHT substation for
existing 2x6ooMW capacity Thermal plant
CEIG/ATS/BS-
2 X 2200KVA DG SET 269B/31582-86/11- 11.1.2012
12
CEIG/ATS/MNG-
1 X 2000KVA TR 19.1.2012
462/32334-37/11-12
CEIG/ATS/
1 X 250KVA DG SET & 1 X 125KVA DG
BS373A/32246- 19.1.2012
SET
50/11-12
CEIG/ATS/MNG-
1 X 1600KVA TR 19.1.2012
463/32338-41/11-12
CEIG/ATS/BS-
1 X 725KVA DG SET 28.1.2012
300/33678-81/11-12
CEIG/ATS/BS-71C/
5 X 2000KVA DG SET 19.1.2012
32251-55/11-12
CEIG/ATS/BS-
4 X 2000KVA DG SET 25.2.2012
403/37247-50/11-12
CEIG/ATS/MNG-
1 X 40KVA 16.2.2012
384/35947-51
CEIG/ATS-HSN-
9MW WPP 23.2.2012
466/36959-63/11-12
CEIG/ATS-HSN-
3MW WPP 23.2.2012
468/36964-69/11-12
CEIG/ATS-HSN-
10.5MW WPP 23.2.2012
467/36982-85/11-12
CEIG/EI-2/AEI-2/
1 X 2.5MVA MYS-342/36953- 23.2.2012
57/11-12
CEIG/EI-2/AEI-
2 X 2200KVA DG SET 13.2.2012
2/35212-16/11-12
CEIG/ATS-BS-
1 X 250KVA DG SET 213A/35538/41/11- 16.2.2012
12
CEIG/ATS-BS-
3 X 600KVA DG SET 348A/35542-45/11- 16.2.2012
12
CEIG/ATS-UDP-
1 X 500KVA DG SET 16.2.2012
464/35551-54/11-12
CEIG/ATS-BS-298/
LT loads of 800.87KW 8.2.2012
35084-89/11-12
CEIG/ATS-BS-
1 x 500kva dg set 13.2.2012
72/35234-35/11-12
CEIG/ATS-BS-
2 x 500KVA dg set 9.2.2012
363/35130-33/11-12
CEIG/ATS/UDP-
3 x 1000 KVA DG SET 4.2.2012
336/34844-48/11-12
CEIG/EI-2/AEI-2/
2 X 1010KVA DG SET BS-128/35962- 16.2.2012
66/11-12
CEIG/ATS-BS-
66KV UG 11.1.2012
458/31573-76/11-12
CEIG/ATS-BS/
50KW 16.2.2012
35576-80/11-12
CEIG/ATS-UDP/
1 X 500KVA 4.2.2012
35273/11-12
CEIG/EI-2/AEI-2/
1 X 6MVA TR MNG-221/35030- 8.2.2012
34/11-12
CEIG/ATS-MNG-
33KV 1.2.2012
218/34479-84/11-12.
CEIG/ATS-BS-
11KV HT UG 1.2.2012
403/34462-66/11-12.
CEIG/ATS-BS-
2 X 250KVA TR 2.2.2012
430/34623-26/11-12
CEIG/ATS-Mys-
1 X 1600 KVA 1.2.2012
295/34531-35/11-12
CEIG/ATS-BS-
2 X 1.5 KVA DG SET 22.2.2012
55/36744-48/11-12
CEIG/ATS-MNG-
1 X 1250KVA 7.2.2012
444/35020-24/11-12
CEIG/ATS-MYS/
1 X 1600KVA 8.2.2012
35040-44/10-11
CEIG/ATS-Mys-/
1 X 1000KVA 14.2.2012
35284-87/10-11
CEIG/ATS-BS-
4 X 500KVA 377A/34573-76/11- 2.2.2012
12
Mar-12
CEIG/EI-2/AEI-2/
1531KW in MSB BS-269A/45791- 31.3.2012
94/11-12
CEIG/EI-2/AEI-
1.5 MW WPP 29.3.2012
2/45488.91/11-12
CEIG/ATS-HSN-
1.5 MW WPP 29.3.2012
464/45484-87/11-12
CEIG/EI-2/AEI-2/
1 X 1250KVA TR, 2 OD+1VL & 11KV , BS-399/41040- 21.3.2012
44/11-12
CEIG/EI-2AEI-
1 X 1.6MVA TR 28.3.2012
2/45144-47/11-12
CEIG/ATS-BS-
3038KW 336A/32297-302/11- 19.3.2012
12
CEIG/ATS-BS-
2457KW 5.3.2012
129/38586-89/11-12
CEIG/ATS-MNG/
1 X 40KVA 6.3.2012
38791-93/11-12
CEIG/ATS-BS-
11KV 269F/31577-81/11- 11.3.2012
12
CEIG/ATS-BS-
155KW 21.3.2012
41064-68/11-12
CEIG/EI-2/AEI-
1 X 250KVA 30.3.2012
2/45549-53/11-12
CEIG/EI-2/AEI-
1 X 250KVA TR 30.3.2012
2/45533-37/11-12.
CEIG/ATS-MNG-
1 X 160KVA DG SET 30.3.2012
422/45493-97
CEIG/ATS-BS-
11KV/433V 451B/41147-51/11- 22.3.2012
12
CEIG/ATS-SMG-
110KV SC tap line 8.3.2012
429/39016-19/11-12
CEIG/EI-2/AEI-
1 X 1500KVA DG SET 12.3.2012
2/39809-13/11-12.
CEIG/ATS-MNG-
1 X 315KVA, 11KVA/433V 14.3.2012
477/40057-60/11-12
CEIG/ATS-BS-
60.2KW 143D/40021.24/11- 14.3.2012
12
CEIG/ATS-BS-
352KW 269E/40016-20/11- 14.3.2012
12.
CEIG/ATS-BS-
815KW 403C/40295-99/11- 16.3.2012
12
Remarks
cataloging and indexing of files as per 4(1) a of RTI-2
No of Pages in the
Sl.NO. File No Subject
file
May-12
M/s.Cipla Limited, Plot No:285,
286,287 Bommasandra-Jigani Link
1 BS-466
Road, indl.Area KIADB, 4th Phase
Bangalore
M/s.Wadhawan Holdings
7 MYS-478
Hebbal ,Mysore.
M/s.Sri.Sudhir.S.Shetty, M/s.Kirthi
Constructions Kirthi
Memento,Sy.no:71-8P1,71-14A2,
UDP-464
17 71-14A3, 71-4A1B, No:71,
A
Kidiyoor viilage, Opp:Abhakari
Bhavan, Nayarkere road,
Barhmagiri, Udupi
M/s.Indian Institute of
18 BS-492 Management, Bannerghatta Road,
Bangalore.
Sri.K.Manmihan Malli
M/s.Abhiman Heights,
18 MNG-523
T.S.No:280/1A, Kadri Vil lage,
No:87B, Mangalore.
M/s.Primus Global Solutin
Pvt.Ltd., & Others,No:28/2,
19 BS-458
Sidhapura, Whitefield Main Road,
Bangalore-560 066.
M/s.Sahyadri Health Care and
20 HSN-612 Diagnostic Centre, Harakere,
N.T.Road, Shimoga.
M/s.H.M.Developers &
Constructions Pvt Ltd.,
23 BS-600 H.M.Infopark, No:3, Bommasandra
Indl.Area, Bommasandra,
Bangalore.
GSS-3 MSEZL area, Kalavaru
24 MNG-274 Village, Mangalore. At
M/s.Mangalore SEZ Limited,
UDP-501-
13 Girls Hostel at MIT Manipal
D
Sep-12
M/s.Cisco Systems (India) Pvt Ltd.,
at Divyashree Chambers, 'B' Wing,
1 BS-71G
No:11, 'O' Shaugnessy Road., Off:
Landford Road, Bangalore-27.
HSN-516
3 Belur Tq., hassan district.
A
M/s.Champak Pragathi
Foundations, Sy.No:3/2, Hosur
1 BS-512
Road, Bommanahalli, Bangalore-
560 068.
M/s.Sri.Venkateshwara Developers,
Kamallalaya High Soft,
4 BS-521 No:21,22,27 7 28, Hosur Main road
at Electronic City,Bangalore-560
067
MYS-432
12 IBPS, near: Pinjarapole society
E
17 BS-476 NIMHANS
M/s.Rane (Madras) Ltd, 79/84,
18 Mys-411 Hootagalli Indl.Area, Mysore-571
186.
M/s.Mahaganapathi Developers at
Padubidri Residency, Sy.No:1/1B5,
2 UDP-583
Nadsal Village, Padubidri, Udupi
District.
M/s.Keystone Constructions
10 BS-569A Ltd.,The Evergreen " No:53 & 54,
Haraluru Village, Bangalore.
M/s.Sansera Engineering Pvt Ltd.,
Plot No: 7, No: 143/A, Jigani Link
11 BS-582/
Road, Indl.Area, Bangalore-560
099. {
Somanahalli-Malur DC line to
12 BS-226
220/66KV sub-station at Sarjapur.
Jan-13
Feb-13
M/s.Coextrix Technologies, Grey
Rock Building, No:10, 24th Main,
1 BS-537A
J.P.Nagar, 2nf Phase, Bangalore-
560 078.
6 SMG-605 Kittadahalli-Shakaripura
Mar-13
M/s.Bureau Veritas Consumer
Products Services ( India ) Pvt Ltd.,
1 BS-281B/ Sy.No:112, ARK Tech Park,
Krishnareddy Indl.Area, 7th Mile,
hosur Road, Bangalore.
3 MYS-550 Chandakavadi
M/s. B.M.Habitat of
MYS- Sri.C.B.Murthy, No:22/B, Gokulam
20
195A Main Road, Jayalakshmipuram,
Mysore-12.
M/s. NetApp India Marketing &
services Pvt Ltd. M/s.Golf Lonks
Software Park, Sy.No:13/2,
21 BS-402
Location-8, Challaghatta Village,
Mahadevapura, Varthur Hobli,
Bangalore.
indexing of files as per 4(1) a of RTI-2005 technical Section
Date of
Catagory
Installation Details Commencement of Date of Closure of File
of File
File
Apporved Number & Date
Apr-12
CEIG/ATS-BS/35245- CEIG/EI-2/AEI-
4 x 1010KVA, 415 DG
48/11-12. Dt:13.2.12 2/281-85/12-13.
CEIG/ATS-BS-403B/
CEIG/ATS-BS-
Installation of LT Loads to an extent of 3500KW 34726-28/11-12.
403B/955-58/11-12.
Dt:3.2.12
CEIG/ATS-UPD-
CEIG/ATS-UPD/
1 x 500KVA, 415V DG 483/38325-28/11-12.
1061-64/12-13.
Dt:3.3.12
CEIG/ATS-MNG-
CEIG/ATS-MNG/
1 x 63KVA, 415V DG 445/3890-93/11-12.
1127-31/12-13.
Dt:6.3.11
CEIG/ATS-MNG/
CEIG/EI-2/AEI-
1 x 40KVA, 415V DG 38791-93/11-12.
2/1140-43/12-13.
Dt:6.3.12
CEIG/ATS-MNG-
CEIG/EI-2/AEI-
1 x 1500KVA, 11KV/433V 447/38791-93/11-12.
2/1144-48/12-13.
Dt:6.3.12
1 x 1250KVA HT sub-station upgradition of
existing 11KV/433V HT sub-station with 1 x
3150KVA, 11KV/433V transformer & 1.55Km of CEIG/ATS-BS-
CEIG/ATS-BS-
66KV line drawn from Yarandahalli 220/66 MUSS 322/6605-08/11-12.
322/1162-66/12-13.
to proposed 66/11KV switch yard & LT loads to an Dt: 18.6.11
extent of 1847KW, 1 x 2.2MVA, 415V DG set in
addl. to existing 4 x 4MVA
CEIG/ATS-MNG-
CEIG/EI-2/AEI-
1 x 250KVA, 11KV/4.33V 414/24378-81/11-12.
2/213-16/11-12.
dt: 21.1.11
CEIG/EI-2/AEI-2/
CEIG/EI-2/AEI-
1 x 750KVA, 415V Dg MYS-295A/37686-
2/423-27/12-13
89/10-11. Dt.28.2.12
CEIG/EI-2/AEI-
MSB SDB-6 Block-1 having three wings A,B,C each CEIG/EI-2/AEI-
2/22680-83/11-
having GF+6UF+TF., 2/2291-95/12-13.
12.Dt:4.11.11
CEIG/EI-2/AEI-
Utility loads of MSB having BF+GF+6UF+TF and CEIG/EI-2/AEI-
2/29615-18/10-11.
1*1600 KVA, 11KV/433V transformer 2/2416-19/10-11
Dt:29.12.10
CEIG/EI-2/AEI-
1 x 2500KVA, 11KV/433V additional transformer to CEIG/EI-2/AEI-2/372-
2/2554-58/12-13.
the existing 3*2.5MVA transformer 75/12-13 Dt:3.4.12
Dt:27.4.12
CEIG/ATS-BS-
CEIG/DEI-1/32647-
1 x 2200KVA, 415V DG set 148B/2953-57/11-12.
50/08-09. Dt:24.12.08
Dt:28.4.12
CEIG/ATS-BS- CEIG/ATS-BS-
2 x 1500KVA, 415V DG 309/16693-96/11-12. 309/2940-44/11-12
DT:14.9.11 Dt:28.4.12
DCEI/MYS/AET/ CEIG/EI-2/AEI-
1 x 1250KVA, 11KV/433V transformer in place of
DWG/HT-01/228/12- 2/3051-54/12-13.
the dismantled 1*100KVA, 11KV/433V transformer
13. Dt:12.4.12 Dt:30.4.12
CEIG/ATS-UDP- CEIG/ATS-UDP-
M.S.Building of Block-B comprising of
293/3776-79/11-12. 293/2965-68/12-13.
BF+GF+10UF in addition to the existing Block-C
Dt:18.5.11 Dt:28.4.12
CEIG/EI-2/AEI-
1 X 1500KVA, 415V DG set in the existing 1 X CEIG/EI-2/AEI-
2/2183-86/12-13./
2500KVA, 11KV/433V transformer 2/1779-82/12-13.
Dt:23/4/12
May-12
CEIG/EI-2/AEI- CEIG/EI-2/AEI-2/
1 x 1500KVA,415V DG set in the existing 1 X
2/1250-53/12-13 MNG-438/3882-
2500KVA, 11/433kv transformer
Dt:12.4.12 86/12-13
CEIG/ATS-Mys-
CEIG/ATS-MYS-
1 x 800KVA, 11KV/433V transformer 263/23766-69/11-12.
263/3188-92/11-12/
Dt:17.11.12
CEIG/EI-2/AEI-
CEIG/EI-2/AEI-
1 x 1010KVA, 415V DG set 2/1942-45/11-12.
2/3958-62/12-13
Dt:20.4.12
CEIG/ATS-Mys-
CEIG/ATS-Mys-
3 x 1010KVA,415V DG set 378A/27488-90/11-12
378A/5301-4/12-13
Dt:30.11.11
CEIG/EI-2/AEI-
CEIG/EI-2/AEI-2/BS-
2 x 180KVA, 415V Dg set 2/3963-66/12-13.
383A/7169-172/12-13
Dt:4.5.12
CEIG/ATS-Mys-
CEIG/ATS-Mys-
LT loads to an extent of 66.87KW 457A/37156-5975/11-
457A/7164-168/12-13
12 Dt:25.2.12
CEIG/ATS-Mys-
CEIG/ATS-MYS-
LT loads to an extent of 31.9KW 457B/37072-75/11-12
457B/7173-177/12-13
Dt:25.2.12
CEIG/ATS-Mys-
CEIG/ATS-MYS-
LT loads to an extent of 47.15KW 457C/37152-55/11-12
457C/7159-163/12-13
Dt:25.2.12
CEIG/ATS-MNG-
M.S.Building having B2+B1+GF+7UF and 1 x CEIG/ATS-MNG-
454/31285-88/11-12
500KVA, 11/433KV transformer centre 454/5769-73/12-13
Dt:4.1.2012
Jun-12
CEIG/EI-2/AEI-
LT loads to an extent of 711.55KW at 1st floor of CEIG/EI-2/AEI-
2/4055-48/12-13
MSB comprising of BF+GF+5UF 2/8074-78/12-13
Dt:5.5.12
CEIG/EI-2/AEI-2/
2 x 750KVA,415V DG set in addition to the existing CEIG/ATS-BS-
ATS-BS-456A/38866-
2 x 1000KVA, 11/433KV transformer sub-station 456A/8226-29/12-13
69/11-12 Dt:7.3.12
DECI/MNG/F- CEIG/EI-2/ATS-
1 x 1600kvA 11/433KV transformer (enhanced) HT
HT7/4445-49/11-12 SMG-410/8230-
sub-station
Dt:30.9.11 33/11-12.
CEIG/ATS-BS-
LT loads of lower Ground floor to an extent of CEIG/ATS-BS-
129A/39479-82/11-12
139KVA of MSB having LB+UB+LG+UG+6UF+TF 129A/8546-50/12-13
Dt:9.3.12
CEIG/EI-2/AEI-
66KV metering CT,PT and TVM in the existing CEIG/EI-2/AEI-
2/35126-29/10-11
66KV outdoor switchyard 2/8564-68/12-13
DT:21.2.11
CEIGATS-BS-332-
LT loads to an extent of total
B/9549-52/11-12
643.92KW(530.32KW+113.6KW) for 4th to 8th CEIG/ATS-BS-
DT:13.7.11 for LT
floor and 9th floor to an extent of 136.03KW in the 332B/8966-60/12-13
loads of 4th to 8th
MBS consisting of BF+GF+9UF
floors
CEIG/EI-2/AEI-2/357- CEIG/ATS-BS-/8836-
LT floore loads of 8th floors to an extent of 434KW
60/11-12 Dt:3.4.12 40/12-13
CEIG/EI-2/AEI-
CEIG/EI-2/AEI-
2 x 160KVA, 415V DG sets 2/1263-65/12-13
2/9044-48/12-13
DT:13.4.12
CEIG/ATS-BS-
CEIG/ATS-BS-
2 x 500KVA,415V DG set 298A/5500-03/11-
298A/9081-85/12-13
12.Dt:3.6.2011
CEIG/EI-2/AEI-2/BS-
71C/8787-91/12-13
Dt:16.6.12 MSB
LT loads of GF(1/2portion) ie., Caffteria and having CEIG/EI-2/AEI-2/BS-
reception area of MSB having 12BF+GF+5UF+TF LB+UB+GF+5UF+TF 71C/9021-25/11-12
.,
CEIG/EI-2/7245/12-13
Dt :16.3.12
CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
1 x 380KVA DG set 495A/8108-11/12-13
377B/9074-78/12-13
Dt:5.6.12
CEIG/ATS-BS-
1 x 1500KVA ,415V DG set., CEIG/ATS-BS-
277A/29020-23/11-12
2 x 1500KVA., 2 x 1250KVA, 415V DG set 277A/9134-38/12-3
DT:14.12.2011
CEIG/EI-2/AEI-
2 x 2000KVA, 11KV DG set (out of CEIG/EI-2/AEI-2/BS-
2/7110-113/12-13
3*2000KVA,11KV Dg) 450A/9852-55/12-13
Dt:28.5.12
CEIG/EI-2/AEI-2/BS-
LT floor of 7th floor to an extent of 446KW in the CEIG/EI-2/AEI-2/BS-
415A/7214-17/12-13
MSB having BF+GF+9UF+TF 415A/9669-73/12-13
Dt:29.5.12
CEIG/EI-2/AEI-
Electrical Installation Of 21*100KVA, 11KV/433V CEIG/EI-2/AEI-
2/40668-72/11-12
distribution centre at residential layout. 2/10057-61/12-13
Dt:20.3.12
Electrical Installation of replacement of existing
CEIG/EI-2/AEI-
bushing type 11KV metering cubicle by ABT type CEIG/EI-2/AEI-
2/5786-88/12-13
metering cubilce along with LBS after metering 2/10007-11/12-13
Dt:17.5.12
cubicle for mini Hydel Poer Plant.
CEIG/EI-2/AEI- CEIG/EI-2/AEI-2/BS-
1 x 320KVA, 415V DG set 2/7081-84/12-13 154A/10136-140/12-
Dt:28.5.12 13
CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
3 x 500KVA, 415V DG set 494A/8080-83/12-13
494A/10148-51/12-13
Dt:5.6.12
CEIG/EI-2/AEI-
CEIG/EI-2/AEI-
2 x 250KVA, 415V DG set 2/2551-53/12-13
2/10218-222/12-13
Dt:27.4.12
Jul-12
CEIG/EI-2/AEI-
CEIG/EI-2/AEI-
2 x 3000KVA, 11KV/433KV transformer 2/7183-86/12-13
2/10790-94/12-13
Dt:29.5.12
CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
1 x 1010KVA, 415V DG set MYS-502/8701- MYS-502/11377-
704/12-13 Dt:13.6.12 81/12-13
DCEI/MNG/F-HT
CEIG/EI-2/AEI-
1 x 1500KVA, 11KV/433V HT sub-station. 19/9442-45/11-12
2/12155-159/12-13
Dt:11-12 Dt:26.3.12
CEIG/EI-2/AEI-
Electrical installation of 2 Nos.of 66KV terminal bay CEIG/EI-2/AEI-
2/45762-65/11-12
at 220/66/11KV 2/12244-47/12-13
Dt:30.3.12
1 x 2000KVA,11KV/433V HT transformer sub-
station & 11KV HT metering cubicle together with CEIG/EI-2/AEI-
CEIG/EI-2/AEI-
11KV SC OH line for a distance of 728mtrs from 2/8832-35/12-13
2/12317-21/12-13
existing Nanjangud feeder for arranging power Dt:15.6.12
supply
CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
Electrical installation of 33KV metering unit & take
MNG-274/38314- MNG-274A/12273-
off structure for 33KV HT line
17/11-12 Dt:3.3.12 76/12-13
5.1Km length of 33KV OH transmission line from CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
MSEZL area Kalavaru village (Grid sub-station-03) MNG-274/8047- MNG-274/2269-
to 110KV Baikampady sub-station tapping 50/11-12 Dt:29.6.2011 72/12-13
DCEI(MYS)AET/
LT loads at GF+2UF to an extent of 1352KW of the TEC-07/DWG/LT- CEIG/EI-2/AEI-
building KSRTC Mart 03/1356/12-13 2/12310-13/12-13
Dt:15.6.12
1 x 750KVA,415V DG set in addition to DCEI(MYS)AET/
the existing 4 x 500KVA, 11KV/433V transformer TEC-07/DWG/DG- CEIG/EI-2/AEI-
sub-station & 1 x250KVA & 1 X 30KVA,415V Dg 02/1183/12-13 2/12322-26/12-13
set of different customer. Dt:6.6.12
CEIG/ATS-SMG- CEIG/EI-2/AEI-2/
1 x 20/25MVA, 110/11KV switch yard 429A/31424-27/11-12 ATS-SMG-429A/
DT:7.1.12 12334-38/12-13
LT loads to an extent of 394.15KW (lighiting, Raw
CEIG/EI-2/AEI-
Power+UPS) in the building comprising of G+3UF CEIG/EI-2/AEI-
2/11398-401/12-13
fed from the existing 1*1600KVA transformer for 2/12783-87/12-13
Dt:10.7.12
HT bearing R.r.No:SHHT 98
CEIG/DEI/5062-
66/06-07/ Dt 30.5.06
For common area
lighitinf loads AC
loads of MSB.,
Additional UPA system pnaels installed at 1,2,3 floor
CEIG/DEI-
in addition to the existing MSB having CEIG/EI-2/AEI-
1/BRW-19/8587-91/6-
BF+GF+M+6UF & 2*1600KVA,11/433KV 2/12769-73/12-13
7 Dt:1.7.06 for
transformer sub-station
LT loads of 2nd floor
CEIG/EI-2/AEI-
2/6975-78/12-13 Dt:
25.5.12
CEIG/ATS-MNG-
1 X 160KVA, 415V DG set in addition to the CEIG//ATS-MNG-
265A/37114-17/11-12
existing 5*4950KW, 112KV Mini Hydel Project. 265B/ 12994-98/12-13
Dt:25.2.12
CEIG/EI-2/AEI-2/
CEIG//ATS-MNG-
1 X 160KVA, 415V DG set in addition to the ATS-MNG-265A/
265A/ 12989-93/12-
existing 5*4950KW, 112KV Mini Hydel Project. 37114-17/11-12
13
dt:25.2.12
CEIG/EI-2/AEI-2/BS-
LT loads to an extent of 450KVA of GF of Block CEIG/EI-2/AEI-2/BS-
454/9758-61/12-13
No:6 & 7 of an MSB having BF+GF+3UF 454/13204-07/12-13
Dt:25.6.12
CEIG/EI-2/AEI-2/
3000KVA, 11KV/433V transformer sub-station and CEIG/EI-2/AEI-2/13-
SMG-429A/13209-
connected equipments 16/11-12 Dt:2.4.12
13/12-13
Aug-12
CEIG/EI-2/AEI-2/BS-
CEIG/ATS-BS-
4 X 1450KVA,415V DG sets 449A/8169-72/12-13
449A/13425-39/12-13
Dt:6.6.12
CEIG/EI-2/AEI-
MSB SDB-6 Block-2 having three wings A,B,C each CEIG/EI-2/AEI-
2/22680-83/11-
having GF+6UF+TF 2/15217-21/12-13
12.Dt:4.11.11
CEIG/ATS-SMG-
CEIG/EI-2/AEI-
1 x 20/25MVA, 110/11KV Switchyard 429A/12334-38/12-13
2/15104-08/12-13
Dt:21.7.12
CEIG/ATS-MYS-291-
LT loads to an extent of 101.12KW, for food Court CEIG/EI-2/AEI-
A/10979-83/12-13
(having ground floor only) 2/14392-96/12-13
Dt:7.7.12
CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
LT loads to an extent of 350KW of the M.S.Building
UDP-501-D/13008/12- UDP-501-D/16275-
comprising of LGF+UGF+3UF
13 Dt:28.7.12 79/12-13
CEIG/EI-2/AEI-
CEIG/EI-2/AEI-2/BS-
1 X 2500KVA, 11KV/433V transformer sub-station 2/4012-15/12-13
451/16773-76/12-13
Dt:5.5.12
Sep-12
Electrical installtion in replacement of existing 1 X CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
2500KVA, 11KV/433V transformer by 1 X 71G/15526-29/12-13
71G/16864-67/12-13
3000KVA, 11KV/433V transformer sub-station Dt:21.8.12
CEIG/EI-2/AEI-2/BS-
3 x 630KVA, 415V DG set in addition to the existing CEIG/EI-2/AEI-2/BS-
180/21595-98/10-11
1 x 380KVA, 415V Dg set 287B/17631-35/12-13
dt:11/10/2010
CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
2 X 1500KVA (out of 3*1500KVA) 415V Dg set 88C/12725-28/12-13
88-C/17752-56/12-13
Dt:26.7.12
CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
1 X 1010KVA, 415V DG set D/12508-51/12-13
88-D/12508-51/12-13
Dt:24.7.12
CEIG/EI-2/AEI-2/BS- CEIG/EI-2/AEI-2/BS-
2 X 750KVA, 1 X 125KVA, 415V Dg
524-A/14996-99/12-13 524-A/17767-71/12-
set
Dt:16.8.12 13
CEIG/EI-2/AEI-
1 X 1500KVA,415V , 1 X 750KVA, 415V DG set CEIG/EI-2/AEI-
2/45809-12/11-12
(out of 3 X 1500KVA, DG set) 2/17772-76/12-13
Dt:31.3.12
CEIG/EI-2/AEI-2/BS-
2 x 750KVA, 415V & 1 x 125KVA, 415V CEIG/EI-2/AEI-2/BS-
481-A/8583-86/12-13
Dg set 481A/18040-44/12-13
Dt:11.6.12
CEIG/EI-2/AEI-
Electrical installtion of 71.76KW, 415V Solar Power CEIG/EI-2/AEI-
2/1293-96/11-12
Plant 2/19535-39/12-13
dt:13.-4.2012
CEIG/EI-2/AEI-2/BS-
3 x 1030KVA, 415V DG set 1x CEIG/EI-2/AEI-2/BS-
379B/45480-83/11-12
2030KVA, 415V DG set 379B/20340-44/12-13
Dt:29.3.12
DCEI(MYS)/AEI/
2 x 1000KVA, 11KV/433V HT transformer TEC-07/DWG/HT- CEIG/EI-2/AEI-
substation 05/2523/12-13 2/20213-16/12-13
dt:21.7.12
Electrical installation of addition of one number of
800A MCVCB in the existing MUSS along with 1R,
11KV, 3C 400sqmm A1 XLPE cable drawn from
MUSS to proposed HT sub-station, RMU consisting CEIG/EI-2/AEI- CEIG/EI-2/AEI-2/
of HT metering cubicle, HT VCB panel, 2MYS-443/39402- MYS-433/21063-
1*2000KVA, 11KV/433V transformer (out of 05/11-12 dt:9.3.12 67/12-13
2*2000KVA) and common area LT loads of the
MSB wing-A having BF+LGF+UGF+1UF (out of
wing A & B) in favour
CEIG/EI-2/AEI-2/BS-
electrical installation of EHT metering bay at CEIG/EI-2/AEI-2/BS-
472A/19890-93/12-13
220KV/66KV BWSSB station 472A/23072-75/12-13
dt: 21.9.12
electrical installation of 11KV HT UG cable for a
CEIG/EI-2/AEI- CEIG/EI-2/AEI-2/
length of 1.5Kms from the change over panel of
2/10652-655/12-13 Mys-455/23089-
transformer 8-9 at power block-2 to HT KIOSK-6 of
Dt:4.7.12 93/12-13
transformer-4
electrical installation of 2 x 1000KVA, 11KV/415V
stepdown transformer & 1 X 2MVA, 415V/11KV CEIG/EI-2/AEI-
CEIG/ATS-MNG-
Booster transformer for arranging temporary power 2/36669-72/10-11
447/23356-59/11-12
supply of SKE & C-KCT stratigic storage of crude dt:28.10.2011
oil project at said premises.
CEIG/EI-2/AEI-2/BS-
Electrical installation of LT loads to an extent of CEIG/EI-2/AEI-2/BS-
524/22410-14/12-13
1167.45KW in the MSB having 2BF+GF+5UF 524B/24656-59/12-13
dt:9.10.12
CEIG/EI-2/AEI-2/BS-
LT loads to an extent of 201.52KW in the MSB CEIG/EI-2/AEI-2/BS-
524C/21826-29/12-13
having GF+1st floor ( out of 5upper floor) 524C/24647-51/12-13
dt:5.10.12
Nov-12
CEIG/DEI-1/34018-
Electrical installation of 110KV DC line drawn on CEIG/EI-2/AEI-
21/08-09
220KV towers 2/26671-74/12-13
dt:03.01.2009
CEIG/EI-2/AEI-2/BS-
1 x 1500KVA, 415V DG set with the existing CEIG/EI-2/AEI-2/BS-
529A/23183-87/12-13
1x2500KVA, 11KV/433V transformer centre 529A/25102-06/12-13
dt:17.10.12
CEIG/EI-2/AEI-
2/2400-04/10-11 Dt:
30.10.10 for
1 x 25KVA, 41V Dg set with thw existing
2*500KVA, 415V Dg CEIG/EI-2/AEI-2/BS-
3*500KVA, 415V DG set & 2*730KVA, ,
set 131C/25147-52/12-13
11KV/433V HT sub-station of the MSB (existing)
CEIG/EI-2/AEI-
2/26604-08/10-11
dt:26.11.10 for MSB
CEIG/EI-2/AEI- CEIG/EI-2/AEI-2/Ats-
66/11KV switchyard & 1*12.5MVA Power
2/12527-30/10-11 dt: Mys-350/28597-
transformer
30.7.10 601/12-13
1 x 500KVA, 415V Dg set with the existing
1*500KVA, 1*250KVA, 415V DG set & CEIG/ATS-BS-248B/
CEIG/EI-2/AEI-2/BS-
2*500KVA, 11KV/433V & 1*1000KVA. 21090-12/12-13 dt:
248B/26902-06/12-13
11KV/433V HT sub-station bearing R.R.No: S2HT 29.9.12
126 and connected MSB
CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
LT loads to an extent of 150KW, X-ray & UPS load Mys-229B/26478- Mys-229B/32820-
81/12-13 dt:17.11.12 24/12-13
CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
1 x 400KVA, 415V DG set 508/12834-37/12-13
508/32861-65/12-13
dt: 26.7.12
CEIG/ATS-UDP-
3 x 1600KVA, 11KV/433V 1000KVA, 2 CEIG/EI-2/AEI-
301/6403-06/11-12 dt:
x 11KV/433V by replacing 3 X 500KVA, 11/433V 2/28840-44/12-13
16.6.2011
11KV UG cable installed by replacing the overhead
CEIG/EI-2/AEI-
line from 2 X 5MVA, 33/11KV transformer sub- CEIG/EI-2/AEI-
2/21866-69/12-13 D:
station (RR.No: HT 31) to 11KV VCB Panel, three 2/28845-49/12-13
5.10.12
RMUs (1VL + 2OD)
CEIG/EI-2/AEI-2/BS- CEIG/EI-2/AEI-2/
1 x 2500KVA, 11KV/433V transformer ., 11KV
529/12102-105/12-13 BAS-529/30283-
BESCOM infrastructure
dt:16.7.12 87/12-13
CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
1 X 2000KVA, 11KV/433V existing
MDY-546/16144- MDY-546/31866-
2MVA,11KV/433V transformer sub-station
47/12-13 dt: 23.8.12 70/12-13
CEIG/EI-2/AEI-
1 X 1500KVA, 415V DG set with existing 1 X CEIG/EI-2/AEI-
2/30911-14/12-13
1250KVA, 415V DG set 2/33061-65/12-13
dt:14.12.12
CEIG/AEI-2/EI-2/ CEIG/EI-2/AEI-2/
1 X 63KVA, 415V DG set UDP-531/13414- UDP-531/34834-
17/12-13 dt: 1.8.12 37/12-13
CEIG/DCEI/EI(T)/
DEI-1/15822-26/05-06
dt : 5.10.2005 of MSB
2B+GF+3UF & 2 x
2000KVA, CEIG/EI-2/AEI-2/BS-
2 X 2000KVA, 11KV/433V transformer centre
11KV/433V 579/34779-83/12-13
transformer centre.,
CEIG/EI-2/AEI-
2/26540-43/12-13
dt:19.11.12
CEIG/EI-2/AEI-
3 X 1010KVA, 415V DG sets in addition to the CEIG/EI-2/AEI-2/
2/41364-67/11-12 dt:
existing 3 X 1600KVA, 11KV/433V HT sub-station UDP-/36299-03/12-13
24.03.12
MSB comprising of BF+GF+7UF for residential CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
purpose ( GF having Gym , library & Dining hall ) UDP-496/8202- UDP-496/36568-
fed` 205/12-13 dt: 07.06.12 71/12-13
CEIG/EI-2/AEI-2/BS-
539/14113-16//12-13
dt: 08.08.12 CEIG/EI-2/AEI-2/BS-
MSB having BF+LGF+UGF Mezzanine + 1st floor
539-A/ /36374-78/12-
Mezzanine + 2nd floor +3rd floor+4th floor
CEIG/EI-2/AEI-2/BS- 13
539-A/16719-22/12-13
dt: 30.8.12
CEIG/EI-2/AEI- CEIG/EI-2/AEI-2/
26 X 250KVA, 11KV/433V transformer Centre 2/1002-05/11-12 dt: Mys-576/37179-
10.4.12 83/12-13
CEIG/EI-2/AEI-2/BS- CEIG/EI-2/AEI-2/
11KV supply infrastructure from 66/11KV Jayapura
559/19392-95/12-13 Mys-559//37142-
MUSS to water supply sub-station
dt: 17.9.12 46/12-13
CEIG/EI-2/AEI- CEIG/EI-2/AEI-2/
2 X 2000KVA, 11KV/433V dry type transformer
2/2592-95/11-12 dt: Mys-469/36367-
sub-station & connected PCC's., MCC's & LT loads
28.4.12 70/12-13
Feb-13
CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
1 X 63KVA, 415V DG set 537A/35929-32/12-13
537A/38031-35/12-13
dt:21.01.2013
CEIG/EI-2/AEI-2/
CEIG/EI-2/AEI-2/
1 X 600KVA, 415V DG set with the existing 2 X MDY-473(A3)/33546-
MDY-473(A3)/39086-
2000KVA, 11KV/433V HT sub-station 49/12-13 dt:
90/12-13
01.01.2013
CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
2 X 160KVA, 415V DG set 527B/22843-46/12-13
527B/39080-84/12-13
dt: 12.10.12
CEIG/EI-2/AEI-
Additional 2No.of 11KV 500MVA, MCVCB at CEIG/EI-2/AEI-
2/37102-05/12-13 dt:
110KV sub-station 2/39788-92/12-13
30.01.13
CEIG/EI-2/AEI-
1 X 1010KVA, 415V DG set with the existing 1 X CEIG/EI-2/AEI-2/BS-
2/29003-06/12-13 dt:
1010KVA, 415V DG set 606/39824-28/12-13
5.12.12
CEIG/EI-2/AEI-2/BS-
1No.of 11KV 800A VCB panel with existing 3 X CEIG/EI-2/AEI-2/BS-
598/36592-95/12-13
1500KVA, 11KV/433V transformer sub-station 598/39803-06/12-13
dt: 28.01.2013
CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
2 X 320KVA, 415V DG set 187C/35975-78/12-13
187C/40044-48/12-13
dt:17.01.2013
CEIG/EI-2/AEI-2/
CEIG/EI-2/AEI-2/
MSB having B2+B1+GF+8UF ., 1 X 75KVA, 415V MNG-599/37184-
MNG-599/40248-
DG set., & 1 X 500KVA, 11KV/433V transformer 87/12-13 dt:
51/12-13
31.01.2013
MSB (a) block G1 (15), Block-G2(16)Block-G3(17)
CEIG/EI-2/AEI-2/BS-
each block having GF+7UF (d) Block-H1 (14), CEIG/EI-2/AEI-2/BS-
377A/36505-08/12-13
Block-H2 (12), Block-H3(11) each block having 377A/40086-89/12-13
dt: 24.01.2013
GF+7UF
CEIG/EI-2/AEI-2/
1 X 1010KVA, 415V DG set ( out of 2x1010KVA, CEIG/EI-2/AEI-2/
MYS-443A/28694-
415V DG set) ., with existing 1 x 2000KVA, Mys-443 A/41059-
97/12-13
11KV/433V transformer 63/12-13
dt:03.12.2012
CEIG/EI-2/AEI-2/BS-
MSB comprising of BF+GF+23UF+TF together with CEIG/EI-2/AEI-2/BS-
463/516053/11-12 dt:
2 X 500KVA, 11KV/433V transformer sub-station 463/40909-13/12-13
10.5.2012
CEIG/DEI-2/CMH- CEIG/EI-2/AEI-2/
Replacement 2 X 160KVA, 415V DG sets by 2 x
206A/27806-09/08-09 CHM-206A//41295-
300KVA, 415V DG set
dt: 05.11.2008 99/12-13
CEIG/EI-2/AEI-2/
CEIG/EI-2/AEI-2/
1 X 215KVA, 11KV/433V HT transformer sub- SMG-571/23048-
SMG-571/41417-
station., connected 240HP Pump set 51/12-13 dt:
20/12-13
16.10.2012
1 X 100KVA, 6.6KV/415V Auxiliary transformer.,
3 X 750KW HT motors, CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
6 X 250KW HT MNG-562/25153- MNG-562/41405-
motors, 1 X 8MVA , 1 X 56/12-13 dt:6.11.2012 08/12-13
1.6MVA, 33/6.6KV Power transformer
Mar-13
CEIG/EI-2/AEI-2/BS-
1 X 320KVA, 415V DG set with the existing 2 x CEIG/EI-2/AEI-2/BS-
281B/31185-88/12-13
380KVA, DG sets., 1 X 500KVA, DG set 281B/42659-63/12-13
dt:17.12.2012
CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
LT loads to an extent of 350KW of the MSB
UDP-501/13010/12-13 UDP-501/42720-
comprising of LGF + UGF+3UF
dt:28.07.2012 24/12-13
1No. Of 66KV terminal bay at Chamarajanagar
220/66KV station and 66KV SC line on DC towesr CEIG/EI-2/AEI-2/589-
CEIG/EI-2/AEI-
from Chamarajanagar 220/66KV station to the 92/11-12
2/42521-24/12-13
66/11KV station at Chandakavadi for a distance of dt:15.04.2011
10.08Kms
CEIG/EI-2/AEI-2/BS-
CEIG/EI-2/AEI-2/BS-
1 X 1500KVA, 415V DG set 488/5984-86/12-13
488/41984-87/12-13
dt:19.05.2012
CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
2No.of 110KV terminal bay at 220/110/33KV SRS
MNG-538/23076- MNG-538/42516-
Kavoor sub-station in Mangalore
79/12-13 dt: 16.10.12 20/12-13
CEIG/EI-2/AEI-2/ CEIG/EI-2/AEI-2/
LT loads to an extent of 350KW of the MSB
UDP-501A/13007/12- UDP-501A/42799-
comprising of LGF + UGF+3UF
13 dt:28.07.2012 03/12-13
DCEI(MYS)
2 X 315KVA, 11KV/433V transformer centres by 2 AET/TEC-07/DWG/H CEIG/EI-2/AEI-
x 750KVA, 11KV/433V transformer centres T-12/7437-38/12-13 2/43780-84/12-13
dt:05.03.2013
CEIG/EI-2/AEI-
1 Multiplex screen
2/43814-18/12-13
CEIG/EI-2/AEI-2/BS-
3 X 380KVA, 415V DG sets along with the existing CEIG/EI-2/AEI-2/BS-
140A/32750-53/12-13
3 x 2500KVA, 11KV/433V transformer sub-station 140A/44331-35/12-13
dt:28.12.2012
CEIG/EI-2/AEI-2/BS-
LT loads of GF to 2nd Upper floor to an extent of CEIG/EI-2/AEI-2/BS-
518/12327-30/11-12
1253KW in the existing MSB having BF+GF+3UF 517/44293-97/12-13
dt:21.07.2012
CEIG/EI-2/AEI-
LT floor loads of 8th floor to an extent of 82KW in CEIG/EI-2/AEI-2/BS-
2/12504-507/12-13
the MSB having BF+GF+9UF / TF ( office area) 535/44215-20/12-13
dt:24.07.2012
CEIG/EI-2/AEI-
LT loads from GF to 6th floors to an extent of CEIG/EI-2/AEI-
2/3946-49/12-13
932.2KW in the MSB having BF+GF+6UF 2/44288-92/12-13
dt:04.05.2012
Date of
of Closure of File Distructio Remarks
n
ed Number & Date
3.4.12
9.4.12
11.4.12
11.4.12
11.4.12
11.4.12
12.4.12
2.4.12
6.4.12
20.4.12
20.4.12
23.4.12
25.4.12
25.4.12
23.4.12
23.4.12
25.4.12
27.4.12
26.4.12
26.4.12
Dt:30/4/12
30.5.12
Dt:4.5.12
Dt:4.5.12
4.5.12
2.5.12
2.5.12
4.5.12
5.5.12
10.5.12
14.5.12
11.5.12
14.5.12
17.5.12
21.5.12
21.5.12
23.5.12
24.5.12
26.5.12
29.5.12
29.5.12
29.5.12
29.5.12
17.5.12
30.5.12
5.6.12
7.6.12
7.6.12
7.6.12
8.6.12
11.6.12
12.6.12
12.6.12
12.6.12
13.6.12
14.6.12
14.6.12
14.6.12
15.6.12
15.6.12
15.6.12
20.6.12
20.6.12
20.6.12
20.6.12
20.6.12
21.6.12
20.6.12
20.6.12
26.6.12
23.6.12
25.6.12
27.6.12
27.6.12
29.6.12
29.6.12
30.6.12
4.7.12
4.7.12
5.7.12
6.7.12
5.7.12
7.7.12
7.7.12
7.7.12
7.7.12
7.7.12
10.7.12
9.7.12
9.7.12
7.7.12
9.7.12
11.7.12
12.7.12
12.7.12
16.7.12
18.7.12
19.7.12
20.7.12
21.7.12
19.7.12
19.7.12
20.7.12
21.7.12
21.7.12
26.7.12
26.7.12
28.7.12
28.7.12
28.7.12
28.7.12
28.7.12
30.7.12
30.7.12
1.8.12
1.8.12
1.8.12
1.8.12
2.8.12
4.8.12
17.8.12
17.8.12
16.8.12
17.8.12
10.8.12
25.8.12
25.8.12
31.8.12
1.9.12
3.9.12
5.9.12
6.9.12
6.9.12
6.9.12
6.9.12
6.9.12
6.9.12
6.9.12
6.9.12
6.9.12
7.9.12
7.9.12
7.9.12
12.9.12
13.9.12
18.9.12
22.9.12
22.9.12
29.9.12
29.9.12
29.9.12
1.10.12
5.10.12
5.10.12
8.10.12
9.10.12
11.10.12
11.10.12
12.10.12
12.10.12
16.10.12
12.10.12
16.10.12
16.10.12
16.10.12
18.10.12
16.10.12
25.10.12
17.10.12
17.10.12
31.10.12
31.10.12
19.11.12
03.11.12
17.11.12
17.11.12
19.11.12
09.11.12
09.11.12
13.11.12
6.11.12
30.11.12
30.11.12
30.11.12
22.11.12
2.11.12
2.11.12
8.11.12
7.12.12
7.12.12
3.12.12
3.12.12
20.12.12
29.12.12
29.12.12
24.12.12
24.12.12
27.12.12
29.12.12
15.12.12
15.12.12
4.12.12
4.12.12
15.12.12
10.12.12
19.12.12
31.12.12
22.12.12
08.01.2013
02.01.2013
08.01.2013
08.01.2013
05.01.2013
02.01.2013
21.01.2013
8.1.13
31.1.13
22.1.13
24.1.13
23.1.13
23.1.13
31.1.13
31.1.13
17.1.13
23.1.13
24.1.13
6.2.13
5.2.13
2.02.2013
06.02.2013
06.02.2013
08.02.2013
11.02.2013
12.02.2013
11.02.2013
11.02.2013
06.02.2013
16.02.2013
18.02.2013
16.02.2013
22.02.2013
22.02.2013
20.02.2013
28.02.2013
27.02.2013
28.02.2013
28.02.2013
11.03.2013
12.03.2013
11.03.2013
04.03.2013
11.03.2013
14.03.2013
13.03.2013
15.03.2013
15.3.2013
21.3.2013
21.3.2013
21.3.2013
21.3.2013
20.3.2013
19.3.2013
25.3.2013
30.03.2013
25.03.2013
27.03.2013
26.03.2013
21.03.2013
cataloging and indexing of files as per 4(1)
Date of
Sl.NO No of Pages
File No Subject Commencement of
. in the file
File
CEIg/EI-2/AEI-2/433-
HSN-511 9 Shantigrama, hassan District.
36/12-13 dt:05.04.2012
CEIG/EI-2/AEI-2/BS-
M/s.Divyssree Technopolis., Sy.No: 36/2 &
BS-593 26 593/35633-36/12-13 dt:
124, Amani, Bellandur Khnae, Bangalore.
15.01.2013
M/s.Wipro Technologies , Tower-10, Wing-
CEIG/EI-2/AEI-2/BS-
B, Electronic City, Campus(4), Sy.No: 70/1,
BS-583A 27 583A/32841-44/12-13
2,3,4(p), Doddathogur Village, Begur Hobli,
dt:29.12.2012
Bangalore
CEIG/EI-2/AEI-2/428-
MDY-510A 28 Belakawadi Village, Mandya District.
32/11-12 dt:05.04.2012
May-13
DCEI(BS)/AEI/TEC-
M/s. Medriech Ltd., No:4/3, Avalahalli,
BS-648 R 6 1(A-45)/949-52/13-14
Anjanapura Post, J.P.Nagar, Bangalore-062.
dt : 17.04.2013
CEIG/EI-2/AEI-2/SMG-
633/1234-39/13-14 dt:
06.04.2013 approving
the installation drawings
M/s. Malnad Alloy Castings pvt Ltd, 36-A, for 1 x 3000KVA,
SMG-633 13 Shimoga-Bhadravathi Industrial Area, 11KV/433V transformer
Machenahalli-577 222, Shimoga. sub-station, 1 x
865KVA, 430V/575V
furnance transformer & 2
x 1250KVA, 415V DG
sets.
CEIG/EI-2/AEI-2/BS-
M.s N.D.Developers Pvt Ltd., Sy.No: 86/1P,
BS-594 28 594 / 37640-43/12-13 dt:
86/2P, 88/3P, Kodlu Village, Bangalore.
02.02.2013
Jun-13
M/s. Honeywell Technilogy Solutions Lab
Pvt Ltd, Adarsh Prime Project Pvt Ltd., CEIG/EI-2/AEI-2/3820-
BS-105 C 1
Sy.No: 19/2, Devarabisanahalli Village, 23/13-14 dt: 07.05.2013
Varthur Hobli, Bangalore-560 103.
CEIG/EI-2/AEI-2/BS-
BS-135 2 Mantri Junction , J.P.Nagar, Bangalore. 135/30322-26/12-13 dt:
10.11.2012
M/s. S.N.N Builders Pvt Ltd., Sy.No:49/1, CEIG/EI-2/AEI-2/BS-
BS-609 3 40/1, 40/2, 40/4, 40/5, 40/6, Yellanahalli, 609/41326-29/12-13 dt:
Begur, Bangalore. 28.02.2013
CEIG/EI-2/AEI-2/BS-
BS-226 17 HSR Layout, Bangalore 226/2870-73/11-12 dt:
03.5.2011
Jul-
CEIG/EI-2/AEI-2/MDY-
MDY-472 2 BWSSB MUSS at Tataguni 472/10049-52/13-14 dt:
27.06.2012
CEIG/EI-2/AEI-2/BS-
BS-640 9 BMTC, Kormangala, 80ft Road, Bangalore. 640/8803-06/13-14 dt:
03.06.2013
AAL/PLE/AB/KKTR/
M/s. Automotive Axles Ltd., Hootagalli
MYS-648 I 10 1635/2013 dt:
Indl.Area, Off:Hunsur Road, Mysore-18.
26.06.2013 replacement
CEIG/EI-2/AEI-2/BS-
M/s. Biocon Ltd, 20th KM, Hosur Road,
BS-644 11 644/10786-89/13-14
Electronic City, Bangalore-100.
dt:15.06.2013
CEUG/EI-2/AEI-
MDY-473 A 16 M/s. BWSSB at T.K.Halli, Mandya District. 2/16286-89/12-13 dt:
25.08.2012
Sri.K.Manmohan Malli /
Smt.Sushma.M.Malli, " Abhiman Mansion CEIG/EI-2/AEI-2/MNG-
MNG-640 18 Apartment", Jail Road, at T.S.No: 640/9233-36/13-14
1570/4,5,6, & 1570/1C(P), Kodailbail dt:06.06.2013
Village, Mangalore.
CEIG/EI-2/AEI-2/MNG-
M/s. Mangalore Chemicals & Fertilizers
MNG-220 A 25 220 A/10782-85/13-14
Ltd., Panambur, Mangalore-575 101.
dt: 15.06.2013
CEIG/EI-2/AEI-2/MYS-
387 C/40380-83/12-13
dt: 20.02.2013 for 1
x 3.5MVA, 66/0.433KV
M/. ITC Ltd., Immavu Village,
transformer s/s
MYS-387 C 27 Chikkaiahanachatra Hobli, Thandya
CEIG/EI-2/AEI-2/MYS-
Indl.Area, Nanjangud Tq., Mysore district.
387 C/14695-97/13-14
dt: 12.07.2013 for
66KV SC line on DC
tower
CEIG/EI-2/AEI-2/BS-
300/16625-28/11-12 dt:
Prestige Southridge,Sy.No: 43 of Ittamadu 9.09.2011 for 3 x 725
Village, Off: Outer ring Road, BSK 3rd KVA, 415V DG set &
BS-300 31
stage, Bangalore. Of M/s. Prestige Estate commissioning Approval
Projects Ltd., for 29348-52
dt:17.12.2011 for 2 x
725KVA, 415V DG set
CEIG/EI-2/AEI-2/BS-
M/s. Infosys Ltd., Plot No: 53, Electronic
BS-524 D 32 524 D/10122-25/13-14
City, Bangalore-100.
dt:13.06.2013
Aug-13
M/s.Cardolite Speciality Chemicals Pvt Ltd., CEIG/EI-3/AEI-3/MNG-
MNG-551 1 MSEZ ( Mangalore, Paila, Bajape Village, 551/16869-72/12-13
Mangalore, d.K.District. dt:01.09.2012
CEIG/EI-2/AEI-2/28997-
M/s. Inox Leisure Ltd., Garuda swagath
BS-587 2 001/12-13 dt:
Mall, Jayanagar, Bnagalore.
05.12.2012
M/s. Kirloskar Toyota Textile Machinery
CEIG/EI-2/AEI-2/41361-
BS-442 A 3 Pvt Ltd., Plot No: 10-13, Phase-II, Jigani
63/11-12 dt: 24.03.2012
Indl.Area, Jigani, Bangalore-105.
M/s. NDS Services Pay-TV Technology pvt
CEIG/EI-2/AEI-2/BS-
Ltd., Pritech Park, SEZ, Bellandur Village,
BS-165 D 4 165 D/19020-23/12-13
Varthur Hobli, Bangalore East Tq.,
dt: 12.09.2012
Bangalore.
CEIG/EI-2/AEI-2/BS-
M/s. Infosys Ltd, No:53, Electronic City,
BS-642 13 642/9976-79/13-14dt:
Hosur Road, Bangalore-100.
11.06.2013
CEIG/EI-2/AEI-2/BS-
578/26379-79/12-13dt:
15.11.2012 for 1 x
M/s. Takshasila Hospitals operating Pvt Ltd,
2000KVA, 11/433V
BS-578 14 Sy.no.52/2 & 52/3, Devarabeesanhalli,
transformer & metering
Varthur Hobli, Bangalore East Tq.
cubicle & 44687-91/12-
13 dt:26.03.2013 for LT
loads of MSB
CEIG/EI-2/AEI-2/SMG-
M/s. Shahi Exports (P) Ltd., Nidige
SMG-429 E 15 429E/13-16/12-13 dt:
Industrial Area, Nidige, Shimoga.
02.04.2012
M/s. Rashi Granites exports India Pvt Ltd, DCEI(BS)/AEI/TEC-
BS-648 K 16 Plot No:117, 118, Bommasandra Industrial 1(A-474)/10986-89/13-
Are, Anekal, Bangalore 14 dt: 21.08.2013
CEIG/EI-2/AEI-2/8063-
66/12-13 dt: 5.06.2012
Shriram Surabhi at Sy.No: 24/P, & 25,
for Block-A with 2 wings
BS-270B 3 Mallasandra Village, Uttarahalli Hobli,
connected transformer T
Bangalore.
Yard-2 & 3 & Block-B
connected to Yard-1
CEIG/EI-2/AEI-2MYS-
M/s. JSS New Hospital, at Sy.No: 18-20 &
MYS-547 5 547/35595-98/12-13 dt:
24, M.g.Road, Kasaba Hobli, Bangalore.
15.01.2013
CEIG/EI-2/AEI-2/BS-
Divyashree Techno Park (SEZ) Kundalahalli
BS-593 A 8 593 A/36130-33/12-13
Village, Varthur hobli, Bangalore
dt: 21.01.2013
CEIG/EI-2/AEI-2/12349-
52/12-13 dt:21.7.2012
for 2 x750,3x300KVA,
M/s. Shahi Exports India PVT, Industrial
SMG-429 B 17 415V voltage stabilizer &
Estate, Machenahalli, Shimoga-577 222.
21077-80/13-14 dt:
29.8.2013 for 1 x
500KVA, 415V stabilizer
CEIG/EI-2/AEI-2/HSN-
m/s. Precot Meridian, Plot No: 14P-16/26-
HSN-615 23 615/41218-21/12-13 dt:
28P, KIADB ( Textiles) SEZ, Hassan.
25.02.2013
CEIG/EI-2/AEI-2/BS-
Divyashree Techno Park (SEZ) Kundalahalli
BS-593 C 24 593/35852-55/12-13
Village, Varthur hobli, Bangalore
dt:16.01.2013
Oct-13
M/s. S.S.Properties Pvt Ltd, Ground floor. ," CEIG/EI-2/AEI-2/UDP-
UDP-629 1 pratham Abode" Vidyarathna Nagar, End 629/1255-58/13-14 dt:
Point Road, manipal, Udupi district. 06.04.2013
CEIG/EI-2/AEI-2/BS-
Sri.Anand Kumar Reddy, Sy.No:49/2,
BS-638 5 638/9058-61/13-14 dt:
Naganathapura, Begur Hobli, Bangalore.
04.06.2013
CEIG/EI-2/AEI-2/BS-
BS-541 12 Jayanagar GIS sub-station, Bangalore 541/17146-49/13-14 dt:
01.08.2013
CEIG/EI-2/AEI-2/SMG-
M/s. Techno Rings Plot No: 4, Industrial
SMG-671 3 671/19627-30/13-14 dt:
Estate, sagar Road, shimoga-577205
17.08.2013
CEIG/EI-2/AEI-2/BS-
688/28432-35/13-14 dt:
M/s. Bangalore Developers at sy.No:21/2 &
11.10.2013 for MSB
BS-688 7 7/9, Kammasandra Village, Attibele Hobli,
Towers D, E,F, G & 2 x
Anekal Tq., Bangalore.
500KVA, 11KV/433V
transformer centres.
M/s. Ashtech ( India ) Pvt Ltd., Near: UPCL DCEI/EI/MNG/F-HT
BS-686 N 8 Compound, Yellur Village, Udupi tq & Drg-35/6805-08/13-14
district. dt: 12.11.2013
CEIG/EI-2/AEI-2/SMG-
SMG-689 9 Gajanur in Shimoga Tq. 689/28608-11/13-14 dt:
15.10.2013
CEIG/EI-2/AEI-2/MDY-
AEE, Minor Irrigation Sub-division,
MDY-680 10 680/24714-17/13-14 dt:
Mandya.
23.09.2013
DCEI/MNG/F-HT-
M/s. Ashoka Impex, Belle, Arasikatte-
UDP-648 M 15 34/6954-57/13-14 dt:
Kunjarugiri Road, Udupi district.
13.11.2013
M/s. Ideal Homes Hi-Tec Residential
CEIG/EI-2/AEI-2/BS-
Layout, Sy.No: 59, 62,63, 64, 65, 66,67, 68
BS-164 16 164/20116-19/10-11 dt:
& 69, Kyalasanahalli Village, Jigani Hobli,
27.09.2010
Chandapura, Bangalore.
CEIG/EI--2/AEI-2/
Sri.Dr.L.Srinivas Reddy at property
BS-679/24430-
BS-679 2 No:2499/CA-27, 24th Main Road,
33/13-14 dt:
HSR Layout, Bangalore.
19.09.2013
M/s. Divya sree Infrastructure Project CEIG/EI-2/AEI-2/
Pvt ., at M/s. technopolis Block(B), BS-593 D/24070-
BS-593 D 3
Off:Old Airport road, yamlur Post, 73/13-14
Bangalore. dt:18.09.2013
CEIG/EI-2/AEI-2/
M/s. Sansera Engineering Pvt Ltd.,
BS-582 B/22490-
BS-582 B 4 No: 143/A, Jigani Link Road,
93/13-14 dt:
Bangalore-560 105.
05.09.2013
Sports Complex Hostel Block b CEIG/EI-2/AEI-2/
( International Hostel Block B) Near UDP-501 B/15950-
UDP-501 B 5
University Campus, Madhavanagar, 53/13-14 dt:
Manipal, Udupi District. 23.08.2012
CEIG/EI-2/AEI-2/
KSRTC, Mysore Division, Sy.No:
MYS-395A/17828-
MYS-395 A 6 27/1, 27/2B, 27/2A, Satagalli,
31/13-14
KSRTC Bus Stand, Mysore.
dt:12.08.2013
M/s. Taegu Tec India Pvt Ltd., Plot CEIG/EI-2/AEI-2/
No: 19 & 120., Bommasandra BS-610A/25663-
BS-610 A 7
Industrial Area, Phase-IV, 66/13-14 dt:
Bangalore-560 099. 30.09.2013
CEIG/EI-2/AEI-2/
M/s. Deeta Construction Pvt Ltd.,
BS-677A/26405-
BS-677 A 8 Sy.No: 51/2, 51/3, 51/4 & 39/5,
08/13-14 dt:
Devarabeesanhalli., Bangalore.
31.10.2013
M/s. Accenture Services Pvt Ltd., CEIG/EI-2/AEI-2/
Pritech park, SEZ Block (7), Outer BS-205 Q/25398-
BS-205 Q 9
Ring Road, Bellandur Village, 61/13-14 dt:
Varthur Hobli, Bangalore. 26.09.2013
M/s. N.D.Developers " ND Passion", CEIG/EI-2/AEI-2/
Sy.No: 86/1, 86/3, 88/1, 88/2, 88/3, BS-594 A/31658-
BS-594 A 10
Kudlu Village, Sarjapura Hobli, 61/13-14 dt:
Anekal Tq., bangalore. 14.11.2013
CEIG
/EI-2/AEI-2/MNG-
MNG-562 I 13 M/s. MSEZ Ltd, Mangalore
562 I/32085-88/13-
14 dt: 19.11.2013
CEIG/EI-2/AEI-2/
M/s. Sequent Scientific Ltd, 120 A &
MNG-691/28721-
MNG-691 17 B, Industrial Area, Baikampady, New
24/13-14 dt:
mangalore-575 011.
21.10.2013
M/s. Sarvodaya Sevasangha, CEIG/EI-2/AEI-2/
GPA:M/s. SJR nterprises Pvt Ltd., BS-452 D/32343-
BS-452 D 18
Property No:22, Hosur Main Road, 46/13-14 dt:
Adugodi, Bangalore. 21.11.2013
CEIG/EI-2/AEI-2/
M/s. Levis Strauss (I) Pvt., No:22, BS-452 E/35816-
BS-452 E 19
Hosur Road, Adugodi, Bangalore. 20/13-14 dt:
10.12.2013
M/s. Assetz Infrahomes LLI, No:CA CEIG/EI-2/AEI-2/
site No: 27, 24th Main road, 13 & 11, BS-679 A/32864-
BS-679 A 20
A cross, 1st sector, HSR layout, 67/13-14 dt:
Bangalore. 29.11.2013
CEIG/EI-2/AEI-2/
BS-310B/3757-
M/s. Embassy Tech Square at Sy.No:
60/13-14 dt:
10/1A. 10/1B, 11, 12/1, 12/2, 13/2,
06.05.2013 for MSB
BS-310 B 28 17/2 & 17/3 , Kh.no258/159/172
Block c, C & 1 x
Kadubeesanahalli, Outer Ring Road,
2MVA, 1 x2.5MVA,
Bangalore-37.
11/433V transformer
sub-station
Jan-14
M/s. Cessna Garden Developers Pvt
Ltd., Sy.o: 3/2B, 4(P0, 7/P, 8/1, 8/2,
CEIG/EI-2/AEI-
11(P), 12/3(P), 17/4(P), 38/2, 43 &
BS-71 H 1 2/29472-75/13-14 dt:
44, Kadubeesanhalli Village, Varthur
30.10.2013
Hobli, Outer Ring Road in
Marathahalli, Bangalore-37.
CEIG/EI-2/AEI-2/
BS-683/25033-
M/s. Golden Gate Projects, Kh.No:
36/13-14 dt:
3804/29/4, 29/5, 15/3D ( sy.No:
25.09.2013 Tower-
BS-683 6 15/3D, 29/4(P) & 29/5),
(1) (2) (3) & 4 &
Kasavanahalli Village, Varthur
club house together
Hobli, Bangalore.
with 4 x 500KVA
transformer centres
CEIG/EI-2/AEI-2/
M/s. Kasturi & Sons, Plot No: 13D,
BS-681/24731-
BS-681 14 Bommasandra Indl.Area, Jigani,
34/13-14
Anekal Tq., Bangalore.
dt:24.09.2013
CEIG/EI-2/AEI-2/
M/s. Infosys Ltd, No:350, Hebbal, MYS-455A/30279-
MYS-455 A 15
Electronic City, Hootagalli, Mysore. 82/12-13 dt:
10.12.2012
CEIG/EI-2/AEI-2/
Tataguni BWSSB(water) Pumping BS-472 B/32395-
BS-472 B 2
station. 98/13-14 dt:
23.11.2013
CEIG/EI-2/AEI-2/
T.K.Halli BWSSB(water) Pumping BS-472 C/32391-
BS-472 C 3
station. 94/13-14 dt:
23.11.2013
CEIG/EI-2/AEI-2/
M/s. Kasturi & Sons, Plot No: 13D,
BS-681 A/24735-
BS-681 A 4 Bommasandra Indl.Area, Jigani,
38/13-14
Anekal Tq., Bangalore.
dt:24.09.2013
Sri.D.Bhaskar Shetty, S/o.U.Sheena CEIG/EI-2/AEI-2/
shetty., Multiplex & Food Court UDP-711/39557-
UDP-711 5
Complex, Udupi-Manipal Road, 61/13-14 dt:
Manipal, Shivalli Village, Udupi Tq. 07.01.2014
M/s. RMZ Infotech Pvt Ltd., Eco
Space, Campus -1C, Sy.No: 17/2 to ACEI(BS)/AEI(T)/
BS-686 P 6 17/4, 20 to 25/8, 43/1 to 50, 4172-73/13-14 dt:
bellandur Village, Varthur Hobli, 29.01.2014
Bangalore.
CEIG/EI-2/AEI-2/
M/s. Sterling Brook Side, No: 14/1,
BS-63 A/41812-
BS-63 A 9 ITPL Main road, Kundalahalli
16/13-14 dt:
Colony, Bangalore.
22.1 .2014
CEIG/EI-2/AEI-2/
Court Complex, Dakshina kannada., MNG-685/25462-
MNG-685 10
Mangalore. 66/13-14 dt:
28.9.2013
CEIG/EI-1/AEI-1/
M/s. Precot Meridian Ltd, Plot
HSN-615B/45926-
HSN-615B 12 No:14P-16/26-28P, KIADB (Textile)
30/13-14 dt:
SEZ, Hassan.
13.02.2014
CEIG/EI-2/AEI-2/
M/s. 3M India Ltd., Plot No:48-51,
BS-198 C/36352-
BS-198 C 14 Electronic City, Hosur Road,
56/13-14 dt:
Bangalore-10.
18.12.2013
Mar
Sri.D.Bhaskar Shetty, S/o.U.Sheena CEIG/EI-2/AEI-2/
shetty., Multiplex & Food Court UDP-711/39557-
UDP-711 1
Complex, Udupi-Manipal Road, 61/13-14 dt:
Manipal, Shivalli Village, Udupi Tq. 07.01.2014
M/s. Mahadevapura small Hydel
Project, across Kaveri River, CEIG/EI-2/AEI-2/
Near:Mahadevapura Village, MDY-690/28640-
MDY-690 2
Srirangapatna Tq., Mandya Dist in 43/13-14 dt:
favour of M/s. Soham Renewable 19.10.2013
Energy India Pvt Ltd
CEIG/EI-2/AEI-2/
M/s. AT & S India Pvt Ltd., 12A, ATS-MYS-
MYS-350 5
Indl.Area, Nanjangud, Mysore. 350/28597-60/12-13
dt:30.11.2012
CEIG/EI-2/AEI-2/
BS-716F/40574-
78/13-14 dt:
Sri.K.Anil Kumar Reddy, GPA: M/s. 17.01.2014 for 3 x
Keerthi Estate, Sy.No: 61/1, 500KVA, 11/433V
BS-416 6
Kh,.No:689/61/1 Thoobarahalli, Tr & MSB Tower (1)
Varthur Hobli, Bangalore. consisting of Wing A
& B & Tower 92)
having Wing C, D &
E.
CEIG/EI-2/AEI-2/
M/s. Toyota Tsusho India Pvt Ltd,
RNG-66F/40279-
RMG-66F 7 Plot No:33 & 34, Bidadi,
83/13-14 dt:
Ramanagara
16.01.2014
CEIG/EI-2/AEI-2/
BS-719/46811-
15/13-14 dt:
18.02.2014
M/s. Sobha Developers, "Sobha Dew Residential MSB
Flower", Sy.No:64/1(P), 64/2(P) & Block (1), Block (2),
BS-719 13
65 (P), Sarakki Village, Uttarahalli block(3) & Block (4)
Hobli, Bangalore. each block having
BF+GF+4UF & 3 x
990KVA & 2 x
750KVA, 11/433v
compact s/s
CEIG/EI-2/AEI-2/
M/s. Jain Heights & Structures Pvt
BS-650A/47556-
BS-650 A 14 Ltd., No:2, 1st Cross, J.C Road,
60/13-14
Bangalore.
dt:21.02.2014
M/s. SKF India Ltd., SKF-Global CEIG/EI-2/AEI-2/
Technical centre, Plot No: 2, BS-435 B/42877-
BS-435 B 15
KIADB, Bommasandra Industrial 81/13-14
Area, Bangalore dt:25.01.2014
CEIG/EI-2/AEI-2/
M/s, Maris Spinners ltd.,
MYS-662/16879-
MYS-662 16 Kattemalalavadi-571 134, Hunsur tq.,
82/13-14
Mysore.
dt:30.07.2013
M/s. Adarsh Developers, Adarsh
CEIG/EI-2/AEI-2/
Palm Retreat-Tower-2, KH.No:130,
BS-693/31556-
BS-693 17 Panathur Grama Panchyath &
59/13-14
Kh.No:630, Doddakannahalli
dt:12.11.2013
Village, Bangalore.
CEIG/EI-3/AEI-3/
Cauvery Bhavan 'D' Block,
BN-266/21265-
BN-266 18 K.G.road, Bangalore in favour of EE
68/13-14 dt:
(Ele), BWSSB, Bangalore.
31.08.2013
CEIG/EI-2/AEI-2/
Madhuvanahalli, Kollegal Tq.,
MYS-637 20 BS-637/1447-50/13-
Chamrajnagar District.
14 dt: 9.04.2013
CEIG/EI-2/AEI-2/
Thunga Lift Bank Canal, gajanur
SMG-684 21 SMG-684/25425-28
Dam, shimoga District.
dt: 20.09.2013
CEIG/ACEI/EI-2/AEI-
2/BS-435C.50879-83/13-
M/s. SKF India Ltd., SKF-Global Technical
14 dt: 24.03.2014 for
BS-435 C centre, Plot No: 2, KIADB, Bommasandra
roof top solar plant on
Industrial Area, Bangalore
Block 1A & 1B & Block-
3 & GTCI-65 Block.
exing of files as per 4(1) a of RTI-2005 technical Section
Installation Details Catagory of File Date of Closure of File
CEIG/EI-2/AEI-2/
1 x 1600KVA, 11KV/433V transformer BS-610/1092-96/12-
13
CEIG/EI-2/AEI-2/
2 x 2500KVA, 11KV/433V HT sub-station feeding the loads BS-205I/13982-
of Block 5B 86/13-14
CEIG/EI-2/AEI-2/
1 x 750KVA, 11KV/433V transformer centre feeding the MNG-608/1153-
four number of 160KW motors at pumping station 57/13-14
CEIG/EI-2/AEI-2/
Addl. 1 x 2200KVA, 415V DG set BS-269B/1763-
66/13-14
CEIG/EI-2/AEI-2/
250KVA, 415V DG set BS-468A/2583-
86/13-14
CEIG/EI-2/AEI-2/
2 x 380KVA, 415V DG set BS-622A/1306-
10/13-14
CEIG/EI-2/AEI-2/
4 x 1650KVA, 415V DG set BS-521A/1314-
18/13-14
CEIG/EI-2/AEI-2/
3 x 750KVA, 415V Dg set BS-577A/1324-
28/13-14
CEIG/EI-2/AEI-
1 x 1250KIVA, 11KV/433V transformer sub-station 2/961-65/13-14
MSB Block A & B each block comprising of
BF+GF+13UF+TF together with 2 x 500KVA, 11KV/433V CEIG/ATS-BS-
transformer sub-station connected 11KV BESCOM 374/78-82/11-12
infrastructure
CEIG/EI-2/AEI-2/
1 x 750KVA, 415V Dg set ( out of 3 x 750KVA DG set) BS-456A/1753-
57/13-14
CEIG/EI-2/AEI-2/
1 x 500KVA, 415V DG set BAS-452/1758-
62/13-14
CEIG/EI-2/AEI-2/
1 x 2500KVA, 11KV/433V HT sub-station feeding the BS-165-H/1397-
loads of Block 6A & 6B 01/13-14
CEIG/EI-2/AEI-
1 x 1250KVA, 11KV/433V transformer sub-station 2/1454-58/13-14
CEIG/EI-2/AEI-2/
Addl. 1 x 2000KVA, 415V DG set MYS-628/2474-
77/13-14
CEIG/EI-2/AEI-2/
315KVA, 11KV/433V transformer sub-station UDP-501E/3141-
45/13-14
CEIG/EI-2/AEI-2/
LT floor loads of 2nd floor to an extent of 148KW in the BS-504H/3114-
MSB ( Block-5) (Wing-A) having 2BF+GF+9UF 18/13-14
CEIG/EI-2/AEI-2/
LT floor loads of 9th floor to an extent of 210.128KW in the BS-205J/3089-83/13-
MSB having (Block-7) 2BF+GF+2levels of MLCP+8UF 14
CEIG/EI-2/AEI-2/
1 x 1500KVA, 415V DG set BS-588/7272-76/13-
14
CEIG/EI-2/AEI-2/
Addl. 1 x 300KVA, 11KV/200V-1350V tranformer centre BS-197C/6685-
89/13-14
Replacement of 1 x 650KVA, 11KV/433V HT transformer CEIG/EI-2/AEI-2/
sub-station with new 1 x 2000KVA, 11KV/433V HT BS-606A/6691-
transformer sub-station 95/13-14
CEIG/EI-2/AEI-2/
2 x 1250KVA, 415V DG set SMG-633/7539-
43/13-14
CEIG/EI-2/AEI-2/
1 x 500KVA, 415V DG set SMG-429 D/77533-
37/13-14
CEIG/EI-2/AEI-2/
3 x 750KVA, 11KV/3.3KV ., 1 x 250KVA, MYS-557A/7528-
11KV/433V transformer sub-station. 32/13-14
CEIG/EI-2/AEI-2/
MSB having BF+GF+1st floor + 2nd floor( commercial ) 1 x BS-611/7847-50/13-
250KVA, 11KV/433V HT sub-station 14
CEIG/EI-2/AEI-2/
LT floor load of portion of 5th floor to an extent of 350KW BS-475 C/7862-
of the existing MSB having BF+GF+9UF+TF 66/13-14
Nos.of Blocks
( B1+B2+B3+B4+B5+B6+B7+B8+B9+B10+B11 & B12 )
CEIG/EI-2/AEI-2/
Block B1 having LGF+GF+1st floor, B2 to B8 having BS-515/7887-91/13-
GF+1UF & B9 ( having BF+GF+1UF, B3, B10 & B12 14
having GF 2 x 1600KVA, 11KV/433V transformer sub-
station, LT loads to an extent of 8112 KW
CEIG/EI-2/AEI-2/
LT loads of 1st floor+2nd floor+3rd floor to an extent of BS-284E/12489-
1069KW of the MSB Block(3) having BF+GF+9UF+TF 93/13-14
CEIG/EI-2/AEI-
11 screen Multiplex 2/12854-58/13-14
CEIG/EI-2/AEI-2/
Additional 2 x 500KVA, 1 x 250KVA, 415V DG set BS-617/12736-40/13-
14
1 x 1250KVA 11KV/433V transformer & connected
CEIG/EI-2/AEI-
equipments in place of 1 x 750KVA, 11KV/433V 2/10828-32/13-14
transformer at existing HT installation
CEIG/EI-2/AEI-
2 Screen 2/9175-79/13-14
CEIG/EI-2/AEI-2/
2 x 1010KVA, 415V DG sets BS-647/14285-89/13-
14
MSB consisting of building S1, S2, S3, S4, S5, S6, S7, S8,
CEIG/EI-2/AEI-2/
S9, S10, S11, S12, S13, S14, S15, S16 & S17 EACH BS-494 A/13928-
HAVING Stilt+12UF+TF & 4 x 990KVA, 11KV/433V 32/13-14
compact sub-station
CEIG/EI-2/AEI-2/
1 x 3000KVA, 11KV/433V transformer sub-station, 1 x SMG-633/13497-
865KVA, 430V/575V furnance transformer 500/13-14
CEIG/EI-2/AEI-2/
1 x 2588KVA, 11KV/575V-575V Furnance transformer SMG-646/13493-
2No.of 630A change over LBS panel 96/13-14
MSB consisting of Block A having GF+11UF & Block B CEIG/EI-2/AEI-2/
having GF+11UF & 1 x 500KVA, 11KV/433V transformer BS-643/14265-69/13-
centre, 1 x 62.5KVA, 1 x 40KVA, 415V DG set 14
CEIG/EI-2/AEI-2/
1 x 1000KVA, 11KV/433V HT transformer sub-station for SMG-429 C/14650-
Dormitory unit 54/13-14
CEIG/EI-2/AEI-2/
1 x 1000KVA, 11KV/433V HT sub-station & 1No.of SMG-429 D/14645-
additional 3 VCB HT panel 49/13-14
CEIG/EI-2/AEI-2/
LT loads of 7th floor to an extent of 630 KW in the MSB BS-205 M/14640-
Block (6) having 2BF+GF+2levels of MLCP+8UF 44/13-14
CEIG/EI-2/AEI-2/
LT lodas of 7th floor to an extent of 208KW in the MSB BS-184 F/14635-
Block (3) having BF+GF+9UF 39/13-14
CEIG/EI-2/AEI-2/
2 x 2000KVA, 11KV/415V HT installation ( wter treatment MDY-473 A/15119-
plant) & connected electrical load of water treatment 23/13-14
CEIG/EI-2/AEI-2/
1 x 500KVA, 415V DG set UDP-501-L/15696-
700/13-14
CEIG/EI-2/AEI-2/
1 x 500KVA, 415V DG set UDP-501-K/15691-
95/13-14
CEIG/EI-2/AEI-2/
LT loads to an extent of 350KW of the MSB comprising of UDP-501-D/15448-
LGF+UGF+3UF 52/13-14
CEIG/EI-2/AEI-2/
1 x 1010 KVA, 415V DG set BS-553A/16797-
01/13-14
CEIG/EI-2/AEI-2/
1 x 725KVA, 415V DG set BS-300/16792-96/13-
14
CEIG/EI-2/AEI-2/
3 x 1250KVA, 415V Dg set BS-524 D/16787-
91/13-14
CEIG/EI-2/AEI-2/
LT load of 5th floor to an extent of 239.35KW in the MSB BS-184 D/16893-
Block(3) having BF+GF+9UF 97/13-14
CEIG/EI-2/AEI-2/
800KVA, 11KV/433V transformer 1RMU(1VL+3OD) in UDP-501 H/15388-
addition to the existing 2 x 500KVA, 11/433V transformer 91/13-14
CEIG/EI-2/AEI-2/
replacement of existing 2 x 200KVA, 11/433V transformer UDP-501 H/15595-
bearing RR NoHT-92 by 2 x 500KVA, 11/433v transformer 99/13-14
Aug-13
CEIG/EI-2/AEI-2/
2 x 2000KVA, 33KV/433V transformer sub-station & 2 x MNG-551/17217-
750KVA, 415V DG set & connected load 20/13-14
replacement of existing Projection with Digital Projection for CEIG/EI-2/AEI-
3 screen Multiplex theatre 2/17397-01/13-14
CEIG/EI-2/AEI-
2 x 1010KVA, 415V DG sets 2/17706-10/13-14
CEIG/EI-2/AEI-2/
LT loads to an extent of 765KW + 440KVAR with the BS-660/19621-25/13-
existing 2 x 1000KVA, 11KV/33V transformer sub-station 14
CEIG/EI-2/AEI-2/
1 x 500KVA, 415V DG set feeding the blocks A,D & E BS-452B /19894-
97/13-14
Sep-13
CEIG/EI-2/AEI-2/
1 x 2000KVA, 11/433V transformer sub-station Mys-648K/21689-
93/13-14
CEIG/EI-2/AEI-2/
M.S.Building having BF+GF+7UF fed to 1 x 500KVA, MNG-668/22697-
11KV/433V transformer centre, 1 x 62.5KVA, 415V DG set 700/13-14
CEIG/EI-2/AEI-2/
4 x 625KVA, 415V DG set BS-578 B/21970-
74/13-14
CEIG/EI-2/AEI-2/
1 x 1500KVA, 415V DG set feeding the Block-A BS-359 B/23926-
30/13-14
CEIG/EI-2/AEI-2/
2 x 750KVA, 415V DG set MYS-547 A/24409-
13/13-14
LT loads to an extent of 622KW in the MSB (IGCC) having CEIG/EI-2/AEI-2/
GF+3UF+TF fed from1 x 630KVA, 11KV/433V BS-583 B/24647-
transformer 51/13-14
CEIG/EI-2/AEI-2/
1 x 4000KVAm 11KV/433v transformer sub-station HSN-615/25082-
connected 11KV BESCOM Infrastructure 86/13-14
3 x 20MVA, 66/11KV ( Power transformer) & its connected CEIG/EI-2/AEI-2/
switchgears 1 x 100KVA, 11KV/433V Auxiliary BS-593 C/25689-
transformer 92/13-14
Oct-13
CEIG/EI-2/AEI-2/
1 x 82.5KVA, 415V & 1 x 62.5KVA, 415V DG set UDP-629/26391-
95/13-14
CEIG/EI-2/AEI-2/
2 x 160KVA, 415V DG set BS-638 A/29209-
13/13-14
CEIG/EI-2/AEI-2/
1 x 1500KVA, 415V DG set BS-88 E/29196-
200/13-14
CEIG/EI-2/AEI-2/
LT loads of 5thy floor to an extent of 305KW in the MSB BS-205 S/29380-
Block-7 having 2BF+GF+2levels of MLCP+8UF 84/13-14
CEIG/EI-2/AEI-
3 screen 2/29428-32/13-14
CEIG/EI-2/AEI-2/
LT loads of 5thy floor to an extent of 347KW in the MSB BS-205 O/29375-
Block-6 having 2BF+GF+2levels of MLCP+8UF 79/13-14
CEIG/EI-2/AEI-2/
LT loads of 6h floor to in the MSB Block-7 having BS-205 R/29645-
2BF+GF+2levels of MLCP+8UF 49/13-14
CEIG/EI-2/AEI-2/
LT loads of 6th floor to an extent of 107.3KW in the MSB BS-105 D/29609-
(1) having 2BF+GF+7UF 13/13-14
Nov-13
CEIG/EI-2/AEI-2/
1 x 500KVA, 415V DG set HSN-674 A/31520-
24/13-14
CEIG/EI-2/AEI-2/
1 x 500KVA, 415V DG set UDP-501 P/32134-
38/13-14
CEIG/EI-2/AEI-2/
1 x 1600KVA, 11KV/433V transformer sub-station UDP-684 M/32851-
55/13-14
40 x 100KVA, 11KV/433V transformer for residential
layout 3 x 100 KVA for STP & pump-House, 2No.of RMU
consisting of 2OD + 4 VL 11 KV BESCOM infrastructure CEIG/EI-2/AEI-2/
consisting of 1R x 3C x 400sqmm XLPE cable from Jigani BS-164/32889-93/13-
MUSS to a length of 4.6Km & 1R x 3C x 400sqmm, 11KV 14
XLPE cable from existing F13/11KV Chandapura feeder to a
length of 500mtrs., 2No.of OD in the cable route
CEIG/EI-2/AEI-2/
LT loads of GF+8UF+TF in the M.S.Building (08) to an BS-205 G/33240-
extent of 917KW 44/13-14
Dec-13
Residential cum commercial M.S.Building consisting of
CEIG/EI-2/AEI-
three wings, Wing-A having GF+14UF, B & C wings having
2/MNG-
GF+13UF fed from 1 x 500KVA, 11KV/433V transformer
703/33281-85/13-
sub-station , 1 x 250KVA, 415V DG set & connected 11KV
14
MESCOM infrastructure
CEIG/EI-2/AEI-
3 x 1500KVA, 415V DG set 2/BS-593
D/35804-09/13-14
CEIG/EI-2/AEI-
1 x 1010KVA, 415V DG set 2/BS-582
B/34567-71/13-14
CEIG/EI-2/AEI-
MSB having GF+17UF to an extent of 1100KW
2/36258-63/13-14
CEIG/EI-2/AEI-
1 x 160KVA, 415V DG set 2/MYS-395A/
36251-56/13-14
CEIG/EI-2/AEI-
1 x 1010KVA, 415V DG set 2/BS-610
A/36201-04/13-14
CEIG/EI-2/AEI-
3 x 1450KVA, 415V DG sets 2/BS-677A/
36197-200/13-14
CEIG/EI-2/AEI-
1 x 250KVA, 415V DG set feeding loads of MSB Wing © 2/BS-594
A/36188-91/13-14
CEIG/EI-2/AEI-
1 x 200KVA, 415V DG set 2/MYS-534
A/36346-51/13-14
CEIG/EI-2/AEI-
LT loads of 4th floor to an extent of 168KW in the MSB
2/BS-269
Block(3) Wing A
J/34738-42/13-14
CEIG/EI-2/AEI-
LT loads to an extent of 400KW at GF(partial) & Mezzanine
2/BN-271
floor in the MSB having LBF+UBF+GF+4UF
B/36523-27/13-14
CEIG/EI-2/AEI-
Replacement 1 x 6.3MVA, 66/11KV power transformer by 1
2/BS-372
x 20MVA, 66/11KV power transformer
A/36503-08/13-14
CEIG/EI-2/AEI-
LT loads of 8th floor to an extent of 970KW in the MSB
2/BS-184
Block(3) ( A & B wing) having BF+GF+9UF
G/36486-90/13-14
CEIG/EI-2/AEI-
2/MNG-
Addl 1 x 1010KVA, 415V DG set
691/36480-85/13-
14
CEIG/EI-2/AEI-
2 x 500KVA, 415V DG set 2/BS-452B/
36923-28/13-14
CEIG/EI-2/AEI-
LT loads of 3rd to 7th UF to an extent of 438.8KVA in the
2/BS-452
MSB having 2BF+GF+7UF
E/36863-68/13-14
CEIG/EI-2/AEI-
1 x 500KVA, 415V DG set 2/BS-679
A/36905-10/13-14
CEIG/EI-2/AEI-
1 x 500KVA, 415V DG set 1 x 1010KVA, 415V DG set
2/BS-609
feeding the Block-A, Block-, MLCP & club house vlock
A/36601-04/13-14
CEIG/EI-2/AEI-
2 x 380KVA, 415V Dg sets feeding the loads of MSB Block
2/BS-519B/
(k)
36597-600/13-14
Residential MSB Tower (1) & (2) each tower having CEIG/EI-2/AEI-
BF+GF+10UF 3 x 500KVA, 11KV/433V transformer 2/BS-709 /38518-
centres & connected 11KV BESCOM infrastructure 23/13-14
common area & utility loads of MSB of Block-B consisting CEIG/EI-2/AEI-
of 2BF+GF+9UF+TF 2 x 2000KVA, 11KV/433V HT sub- 2/BS-564/38530-
station 35/13-14
CEIG/EI-2/AEI-
common area & utility loads of MSB Block- C having
2/BS-310
BF+GF+9UF & its connected
B/36551-56/13-14
Jan-14
CEIG/EI-2/AEI-
4 x 1800KVA, 415V DG sets feeding the MLCP & Block
2/BS-564
(b)
C/39173-78/13-14
CEIG/EI-2/AEI-
2 x 500KVA, 415V DG sets 2/BS-279
A/39934-39/13-14
CEIG/EI-2/AEI-
848.22KWP, 415V roof top Solar Power Plant for captive
2/BS-699
consumption only
A/40535-40/13-14
CEIG/EI-2/AEI-
60.48KWP, 415V roof top Solar Power Plant for captive
2/BS-699 /40541-
consumption
46/13-14
CEIG/EI-3/AEI-
3/RNG-
3 x 1250KVA, 1 x 500KVA, 415V DG set
281/41286-90/13-
14
CEIG/EI-2/AEI-
2 x 1500KVA, 2 x 1010KVA DG sets feeding to Block-B &
2/BS-359
C
D/41320-24/13-14
CEIG/EI-2/AEI-
Residential MSB Block J having LBF+UBF+GF+21UF & 3
2/BS-519
x 990KVA, 11KV/433V compact sub-station
A/40965-70/13-14
CEIG/EI-2/AEI-
1 x 1000KVA, 11KV/433V transformer sub-station 2/BS-681/44491-
96/13-14
CEIG/EI-2/AEI-
2 x 725KVA, 415V DG set
2/47859-64/13-14
Feb-14
CEIG/EI-2/AEI-
1 No.of 4 screen multiplex
2/44959-66/13-14
CEIG/EI-2/AEI-
1 x 500KVA, 415V Dg set 2/BS-472
B/45839-44/13-14
CEIG/EI-2/AEI-
1 x 500KVA, 415V Dg set 2/BS-472
C/45845-50/13-14
CEIG/EI-2/AEI-
1 x 1010KVA, 415V & 1 x 180KVA,
2/BS-681
415V DG sets
A/45816-21/13-14
CEIG/EI-2/AEI-
MV loads in the common area of Basement floor & in food
2/UDP-
court at ground floor in the building having BF+GF+2UF 1 x
711/46411-15/13-
630KVA, 11KV/433V TR s/s
14 dt:17.02.2014
CEIG/EI-2/AEI-
1 x 625KVA, 415V DG set
2/46913-18/13-14
CEIG/EI-2/AEI-
1 x 625KVA, 415V DG set
2/46919-24/13-14
CEIG/EI-2/AEI-
1 x 125KVA, 415V DG set 2/BS-63 A/47758-
63/13-14
CEIG/EI-2/AEI-
MSB ( District Court) having BFGF+3UF ( out of 2/MNG-
bF+GF+6UF) fed 2 x 490KVA, 11/433V transformer s/s 685/47866-70/13-
14
CEIG/EI-2/AEI-
1 x 1500KVA, 415V DG set 2/BS-88C/47752-
57/13-14
CEIG/EI-2/AEI-
LT loads of B wing 9th floor to an extent of 216KW in the
2/BS-184
MSB Block(3) having BF+GF+9UF
H/47878-83/13-14
CEIG/EI-2/AEI-
additional load to an extent of 150KW(warehouse) 2/BS-198
C/48359-64/13-14
Mar-14
CEIG/EI-2/AEI-
2/UDP-
3 No.of multiplex screen
711/48771-77/3-
14
6MW mini hydel project consisting of 3 x 2MW, 6.6KV CEIG/EI-2/AEI-
synchronous generators, 2 x 6MVA, 6.6KV/66KV generator 2/MDY-
transformer, 2 x 200KVA, 6.6KV/415V Auxiliary 690/48941-46/13-
tramnsformer.1 x 125KVA, 415V DG set 14
CEIG/EI-2/AEI-
Addl.2No.of Intermediate 66KV EHT tower 7& its 2/MYS-
connected line 350/48972-77/13-
14
CEIG/EI-2/AEI-
1 x 750KVA, 415V Gas generator 2/RNG-66F/
48760-65/13-14
CEIG/EI-2/AEI-
LT loads of 6th floor ( west Wing) to an extent of 182.46KW
2/BS-105
in the MSB 1 having 2BF+GF+7UF+TF
F/49676-81/13-14
CEIG/ACEI/EI-
replacement of existing 1 x 200KVA, 11/433V transformer
3/AEI-3/BN-266/
by 1 x 500KVA, 11/433V transformer sub-station.
50072-77/13-14
CEIG/EI-2/AEI-
LT loads of Residential MSB Block (1) consisting of Wing
2/BS-705 /50155-
A having BF+GF+12UF
60/13-14
CEIG/EI-2/AEI-
2/MYS-
1 x 8MVA, 66/11KV Power transformer at 220/66/11KV s/s
637/50521-25/13-
14
CEIG/ACEI/EI-
common area utility loads of MSB (5) Block (D1) having
2/AEI-2/BS-593
3BF+GF+6UF+TF & 1 x 1600KVA, 1 x 2000KVA,
E /51027-32/ 13-
11/433V HT transformer s/s
14
CEIG/ACEI/EI-
3 x 1500KVA, 415V DG set feeding the MSB block D1 2/AEI-2/BS-
Building-5 593J /51365-69/
13-14
LT loads of Residential MSB (1) consisting of (a) Block(1) CEIG/ACEI/EI-
having BF+SF+GF+7UF (b) Block(2) having 2/AEI-2/BS-698
BF+GF+SF+7UF fed from 1 x 500KVA, 11/433V A/51408-13/ 13-
transformer 14
CEIG/EI-2/AEI-
a) 72KWP capacity on Block-3 (b) 324 Kwp capacity on
2/BS-435C/
Block 1 A & 1B © 125Kwp capacity on GTCI Block
51736-42/13-14
Date of
Date of Closure of File Distructio Remarks
n
pporved Number & Date
03.04.2013
03.04.2013
09.04.2013
04.04.2013
04.04.2013
16.04.2013
19.04.2013
15.04.2013
17.04.2013
9.04.2013
9.04.2013
9.04.2013
02.04.2013
01.04.2013
10.04.2013
16.04.2013
16.04.2013
09.04.2013
10.04.2013
17.04.2013
20.04.2013
27.04.2013
26.04.2013
26.04.2013
27.04.2013
24.04.2013
04.04.2013
25.04.2013
16.05.2013
10.05.2013
10.05.2013
10.05.2013
14.05.2013
06.05.2013
06.05.2013
15.05.2013
15.05.2013
15.05.2013
15.05.2013
10.05.2013
20.05.2013
20.05.2013
15.05.2013
20.05.2013
21.05.2013
21.05.2013
21.05.2013
23.05.2013
23.05.2013
23.05.2013
25.05.2013
25.05.2013
27.05.2013
27.05.2013
27.05.2013
30.05.2013
30.05.2013
08.05.2013
03.06.2013
03.06.2013
03.06.2013
06.06.2013
22.06.2013
26.06.2013
25.06.2013
15.06.2013
15.06.2013
10.06.2013
07.06.2013
15.06.2013
15.06.2013
13.06.2013
29.06.2013
12.06.2013
06.06.2013
11.06.2013
01.07.2013
01.07.2013
01.07.2013
09.07.2013
05.07.2013
02.07.2013
02.07.2013
09.07.2013
12.07.2013
12.07.2013
12.07.2013
12.07.2013
12.07.2013
12.07.2013 0
12.07.2013 0
17.07.2013
18.07.2013
18.07.2013
22.07.2013
22.07.2013
25.07.2013
25.07.2013
23.07.2013
23.07.2013
22.07.2013
24.07.2013
27.07.2013
29.07.2013
29.07.2013
30.07.2013
30.07.2013
30.07.2013
29.07.2013
30.07.2013
22.07.2013
24.07.2013
02.08.2013
05.08.2013
08.08.2013
07.08.2013
05.08.2013
07.08.2013
17.08.2013
17.08.2013
17.08.2013
19.08.2013
20.08.2013
20.08.2013
24.08.2013
26.08.2013
28.08.2013
31.08.2013
31.08.2013
03.09.2013
03.09.2013
06.09.2013
06.09.2013
05.09.2013
06.09.2013
06.09.2013
05.09.2013
04.09.2013
05.09.2013
13.09.2013
16.09.2013
17.09.2013
19.09.2013
21.09.2013
21.09.2013
21.09.2013
25.09.2013
26.09.2013
25.09.2013
25.09.2013
25.09.2013
26.09.2013
30.9.2013
30.9.2013
03.10.2013
10.10.2013
10.10.2013
11 .10.2013
10.10.2013
10.10.2013
21.10.2013
25.10.2013
28.10.2013
29.10.2013
29.10.2013
29.10.2013
30.10.2013
30.10.2013
30.10.2013
31.10.2013
31.10.2013
05.11.2013
06.11.2013
14.11.2013
19.11.2013
06.11.2013
06.11.2013
11.11.2013
19.11.2013
16.11.2013
11.11.2013
21.11.2013
11.11.2013
21.11.2013
21.11.2013
29.11.2013
29.11.2013
29.11.2013
29.11.2013
30.11.2013
02.12.2013
09.12.2013
10.12.2013
06.12.2013
16.12.2013
16.12.2013
16.12.2013
16.12.2013
16.12.2013
16.12.2013
18.12.2013
06.12.2013
18.12.2013
21.12.2013
21.12.2013
21.12.2013
21.12.2013
27.12.2013
27.12.2013
27.12.2013
23.12.2013
23.12.2013
23.12.2013
30.12.2013
30.12.2013
30.12.2013
30.12.2013
23.12.2013
01.01.2014
04.01.2014
10.01.2014
10.01.2014
16.01.2014
16.01.2014
17.01.2014
17.01.2014
21.01.2014
21.01.2014
20.01.2014
22.01.2014
25.01.2014
31.01.2014
20.01.2014
24.01.2014
05.02.2014
12.02.2014
12.02.2014
11.02.2014
17.02.2014
19.02.2014
19.02.2014
22.02.2014
24.02.2014
22.02.2014
21.02.2014
24.02.2014
28.02.2014
04.03.2014
05.03.2014
07.03.2014
07.03.2014
05.03.2014
04.03.2014
04.03.2014
11.03.2014
11.03.2014
11.03.2014
12.03.2014
14.03.2014
14.03.2014
14.03.2014
14.03.2014
14.03.2014
14.03.2014
15.03.2014
15.03.2014
20.03.2014
Corrigendu
m No:
CEIG/EI-
2/AEI-2/S
19.03.2014 MG-684/
2603-
08/14-15
dt:
05.05.2014
19.03.2014
25.03.2014
26.03.2014
29.03.2014
29.03.2014
29.03.2014
cataloging and indexing of files as
No of Pages
File No Sl.NO. Subject
in the file
Apr-14
Sri.Ganesh.M.P.Ashiyana A & B
Mangalore
Bangalore
South
45(P), 46(1), 46(2) & 50(P),
BS-735 A 15
Bellandur Village, Varthur Hobli,
Bangalore
Bangalore
Systems Pvt Ltd., Level-7, Tower-
South
BS-403 D 16 3, Building 2B, Vrindavan Tech
Village, Outer Ring Road,
Bangalore.
Shimoga
May-14
M/s. Infosys Ltd., No:350, Hebbal
Mysore
Bangalore
South
Pvt Ltd., No:39/40, HP Avenue,
BS-321 B 5
Electronic City, Phase-I, Hosur
Raod, Bangalore.
Bangalore South
Purvankara Projects Ltd, Purva
BS-609 6 Highlands, Sy.No:19(P),
Mallasandra Village, Bangalore.
Bangalore South
Ltd (GPA), "Salapuria Greenage",
SY.No: 4/1(P) to 4/9P of
BS-519B 13 Bommanahalli, SY.No: 6/9P to
6/13P of Hongasandra Village,
Begur Hobli, off: Bommanahalli,
Bangalore.
Kumbalagodu in Ramanagara Tq
RNG-198 A 15
a
& Dist.
Bangalore.
Bangalore
e South
BS-574 31 Hoody-Somanahalli
M/s. Infosys Ltd., Plot No:347/A,
Mysore
MYS-291 H 32 347/C, 348, 349, 373 to 375, Hebbal
Electronic City, Hootogalli, Mysore.
Bangalore
M/s. Acuprint Systems, Plot No:21,22
South
BS-757 33 & 23, Bommasandra-Jigani Link
Road, Indl.Area, Anekal, Bangalore.
Jun-14
M/s. Bremels Rubber Industries (P)
Udupi
South
South
BS-694 9 Plot No: 92, KIADB Indl.Area, Jigani
Phase-II, Anekal Tq,. Bangalore.
e South
M/s. Arya Gruha Pvt td., "Arya
BS-698 B 10 Hamsa" KH.No: 756, No:28/1,
Kothanur Village, Bangalore.
Bangalore South
M/s. Embassy property Development
Ltd., M/s. Embassy tech Square
( Block-A), sy.No: 10/1A, 1B, 11,
BS-310 C 11
12/1, 12/2, 13/2, 17/2 & 17/3, Kh No:
298/159/172, Cessna Business Parl,
Outer Ring Road, Bangalore-37.
Jul-14
Sri.R.Neelakanta Rao, M/s. J.N.R
Bangal
City Centre, No:30, Rajaram Mohan
BS-761 1 ore
Road, Sam,pangiram Nagar,
South
Bangalore.
Bangal
18 ore M/s. Bosch Ltd., P.B.No: 3000, Hosur
BS-59A
Road, Adugodi, Bangalore
South
Bangal
Vikas Tech Park s/s to
BS-728 14 ore
Devarabeesanahlli s/s
South
M/s. RMZ Ecoworld Infrastructure (p)
Ltd., Block 8A, Sy No: 96(P), 98,
Bangal 99(P), 100, 101, 102/1 & 2, 102/3,
BS-784 A ore 103, 104/1, 104/2, 105/(P) & 106(P)
South of Bhoganahalli Village & Sy No:
72/1, 72/2(P), 72/5, Doddakannahalli,
Varthur Hobli, Bangalore.
15
35
M/s. Infosys Ltd., Infosys IT & TTES
SEZ, Plot No: 347/A, 347/C, 348,
MYS-291 L 36
349, 373 to 375, Hebbal Electronic
City, Mysore.
37
Nov-14
M/s. Confident Projects (I) Pvt Ltd.,
GPA: Sri.K.G.Padmanabha &
BS-797 sri.Vasanthkumar, Sy No: 81 & 52,
Sompura Village, Sarjapura Hobli,
1 Bangalore.
Sri.Chatrabhuj Bassarmal ,
Bangal Pardhanani, Kh.No:464/159/172/2/1,
BS-750 ore Sy.No: 10/1B, 10/3 & 11,
South Kadubeesanahalli Village, Varthir
HobliBangalore.
12
M/s. Integrated Food Park Pvt Ltd.,
Vasanthnarasapura indl.Area,
Kempanna Dodderi, (88., 89/1, 89/2,
TMR-747 A
92/1, 92/2) Bathasandra Villages,
(21, 22/1B, 22/1B, 22/2, 23,24,16,25)
Kora Hobli, Tumkur District.
13
Sri.C.B.Pardhanani, Kh
No:464/159/172/2/1 sy No: 10/1B,
BS-750 A
10/3 & 11, Kadubeesanahlli, Varthur
14 Hobli, Bangalore.
M/s. Sudhashree tech Park Pvt Ltd.,
GPA: M/s. Prestige Exora Business
BS-777 B Park, No: 143/1, Prestige Tech Park,
Bellandur Village, Outer Ring Road,
15 Bangalore.
Dec-14
M/s. State street Services India Pvt
Ltd., 4th floor, Block-8A, M/s. RMZ
BS-784 F 1 Ecoworld infrastructure Pvt Ltd.,
Bhoganahalli, Doddakannahalli,
Varthur Hobli, Bangalore.
Mangal
MNG-562 Mangalore SEZ Ltd., Mangalore
ore
16
M/s. CNNL, Manchanbele Project
Ramanagar
20
M/s. Rama Bhavan Complex
Mangal
MNG-785 21 Condominium, Navabharath Circle,
ore
Mangalore.
Bangalore
BS-816 Properties, Sy No: 608,
Nyanappanahalli, Begur Hobli,
South
bangalore.
6
34
Sri.Prashanth.K.Sanil, Willos
MNG-870 2 Residency, Opp:Petrol Pump,
Neermarga, Mangalore.
Bangalore South
Apr-14
Residential MSB Block-A having 2BF+LGF+UGF+5UF
CEIG/EI-2/AEI-2/MNG-
& Block-B having LGF+UGF+5UF fed from 2 x
708/34718-21/13-14
250KVA, 11/433V tr centres & connected BESCOM
dt:6.12.2013
Inftastructure
CEIG/ACEI/EI-2/AEI-2/79-
Additional 1 x 500KVA, 415V DG set
83/13-14 dt: 02.04.2014
CEIG/ACEI/EI-2/AEI-2/BS-
Tem 2 x 2500KVA, 11/433V transformer sub-station at
165B/8873-76/12-13 dt:
Block-8, 4A & 4B
15.06.2012
CEIG/ACEI/EI-2/AEI-2/BS-
1 x 2500KVA, 11KV/433V HT sub-station feeding the
735/18-22/13-14 dt:
loads of the MSB having BF+GF+8UF
02.04.2014
a) 11KV BESCOM Infrastructure consisting of
(2OD+1VL) RMU, 11KV metering cubicle, 1R x 3Cx
CEIG/ACEI/EI-2/AEI-2/BS-
400sqmm XLPE cable to a length of 360mtrs
205 V/51434-38/13-14 dt:
(100mtrs.from F-18 feeder of RMZ MUSS & 260mtrs
29.03.2014
from primal MUSS) B) Single HT breakerpanel with the
existing 1 x 2500KVA, 11/433V transformer s/s
CEIG/ACEI/EI-2/AEI-2/BS-
1 x 2000KVA, 11/433V transformer s/s feeding the MSB
205 U/51429-33/13-14 dt:
Block (1)
29.03.2014
CEIG/ACEI/EI-2/AEI-2/BS-
Addl. 1 x 2000KVA, 11KV/433V Tr with the existing 1
578C/50608-12/13-14 dt:
x 2000KVA, 11KV/433V Tr s/s
20.03.2014
CEIG/EI-2/AEI-2/RNG-145
Addl.LT loads to an extent of 161KW ( feeding the loads
C/50567-72/13-14 dt:
of flash Tower, Mini Venice & Spinning Mushroom)
20.03.2014
CEIG/EI-2/AEI-2/34752-
Addl. 1 x 500KVA, 415V DG set
55/13-14 dt: 6.12.2013
CEIG/EI-2/AEI-2/50532-
3 x 750KVA, 415 DG sets
36/13-14 dt: 20.03.2014
CEIG/ACEI/EI-2/AEI-2/BS-
LT loads of 7th floor to an extent of 702.42KVA in the
403D/51424-28/13-14 dt:
MSB 2B having BF+GF+7UF
29.03.2014
CEIG/ACEI/EI-2/AEI-2/BS-
372B/25734-37/13-14 dt: 1 x 6.3MVA, 66/11KV transformer bay
01.10.2013
CEIG/ACEI/EI-2/AEI-2/BS-
71 L/585-89/13-14 dt: 8 x 3259KVA, 11KV DG set freeding the wing 7A & B
08.04.2014
CEIG/ACEI/EI-2/AEI-2/BW-
120A/1664-69/13-14 dt: 1 x 125KVA, 415V DG set
07.03.2014
CEIG/EI-2/AEI-2/MNG-
714/41366-70/3-14 dt:
22.01.2014 for common are & common area & utility loads of MSB ( forum Mall)
utility loads of MSB & 3 x having B2+B1+GF+4UF+TF
2500KVA, 33KV/433V
transformer s/s.
May-14
CEIG/EI-2/AEI-2/48731- 1no.of 66KV Isolation bay with existing 12.5/16MVA &
35/13-14 dt: 04/03.2014 16/20MVA, 66/11KV s/s
CEIG/EI-2/AEI-2/BS-
100KW Solar on grid system power plant for captive
730/50033-37/13-14 dt:
consumption
14.03.2014
CEIG/ACEI/EI-2/AEI-2/BS-
1No.of 66KV terminal bay for BMRCL at 220/66/11KV
695/31810-13/13-14 dt:
subramanyapura s/s.
16.11.2013
CEIG/ACEI/EI-2/AEI-2/BS-
LT loads of 2nd floor to an extent of 88KW in the MSB
452 F/198-202/13-14 dt:
having 2BF+GF+7UF
03.04.2014
CEIG/ACEI/EI-2/AEI-2/BS-
321/1703-07/14-15 Addl 1 x 1500KVA, 415V DG set.
dt:22.04.2014
CEIG/ACEI/EI-2/AEI-2/BS-
MSB Block-2, Wing 'F' having B2+B1+GF+20UF+TF &
370/15551-54/11-12
( out of Block(1) consisting wings of A, B,C, D & Block
dt:25.08.2011 for Block,Wing
(2) consisting of wing E & F, 12 x 500KVA, 11/433V
A to H & J to N & 28 x
transformer centres) 2 x 500KVA, 11/433V transformer
500KVA, 11/433V
centres
transformer centre
CEIG/ACEI/EI-2/AEI-2/BS-
LT loads of 8th floor to an extent of 129KW in the MSB
323A/994-98/13-14 dt:
having LBF+UBF+GF+9UF
16.04.2014
CEIG/EI-2/AEI-2/14724-
LT loads of 9th, 10th & 11th floor of the MSB to an
26/07-08 dt: 28.08.2007 for
extent of 79.5KW in the existing MSB having
MSB having
LBF+UBF+MF+SF+13UF
LBF+UBF+MF+SF+13UF
CEIG/ACEI/EI-2/AEI-
2/40180-84/13-14 dt: Addl 1 x 2500KVA, 11/433V transformer.
13.01.2014
CEIG/ACEI/EI-2/AEI-2/
MNG-710A/36341-44/13-14 4 x 1800KVA, 415V & 1 x 1065KVA, 415V DG sets
dt: 18.12.2013
CEIG/ACEI/EI-2/AEI-
2MNG-714A/2085-89/14-15 six screen multiplex theatre
dt:30.04.2014
CEIG/EI-2/AEI-2/BS-519B/
2 x 500KVA, 415V DG sets feeding the loads of the MSB
31509-12/13-14 dt:
Block-J.
11.11.2013
CEIG/ACEI/EI-2/AEI-2/BS-
270 E/2231-35/14-15 dt: 2 x 200KVA,1 x 100KVA, 2 x 82.5KVA, 415V DG set
03.05.2014
CEIG/ACEI/EI-2/AEI-2/BS-
MLCP (Club House) having BF+GF+7UF & 1 x
609 /41326-29/12-13
dt:28.02.2013 990KVA, 11/433V compact s/s.
CEIG/EI-2/AEI-2/BW-191
LT loads of 4th floor to an extent of 203KW in the MSB Block
M/48692-96/13-14 dt:
(c ) having GF+7UF
04.03.2014
CEIG/ACEI/EI-2/AEI-2/BS-213
1 x 750KVA, 1 x 500KVA, 1 x 250KVA, 415V DG sets
C/2681-85/14-15 dt:05.05.2014
Common area & LT loads of MSB Block (1) & (2) each block
CEIG/ACEI/EI-2/AEI-2/4118-
having 2BF+GF+6UF & 1 x 1250KVA, 11/433V transformer
22/14-15 dt:21.05.2014
sub-station & its connected 11KV BESCOM infrastructure.
CEIG/ACEI/EI-2/AEI-2/BS-642
1 x 1010KVA &1 x 1250KVA, 415V DG sets
B/4390-94/14-15 dt:24.05.2014
CEIG/EI-2/AEI-2/BS-677B/ LT loads of ground floor, 1st floor, 2nd floor, 3rd floor & 5th
49517-21/13-14 dt: 11.03.2014 floor to an extent of 1164KW in the MSB having BF+GF+5UF
CEIG/ACEI/EI-2/AEI-2/2935-
40Kwp roof top solar power plant for captive consumption.
39/14-15 dt:07.05.2014
CEIG/EI-2/AEI-2/BS-726
A/49650-54/13-14 dt: 1 x 160KVA, 415V DG set feeding the Block (A)
12.03.2014
CEIG/ACEI/EI-2/AEI-2/BS-698
2 x 180V 415C DG sets ( out of 3 x 180KVA, 415V DG sets)
B/1106-10/13-14 dt: 16.04.2014
CEIG/ACEI/EI-2/AEI-2/2764-
2 x 250KVA, 415V sets
68/14-15 dt:05.05.2014
CEIG/ACEI/EI-2/AEI-2/MNG-
745A/4929-34/14-15 dt: 1 x 200KVA, 415V DG set
29.05.2014
CEIG/ACEI/EI-2/AEI-2/MNG-
744A/4935-40/14-15 dt: 1 x 200KVA, 415V DG set
29.05.2014
CEIG/ACEI/EI-2/AEI-2/CHN-
713/40284-88/13-14 dt: 2 x 1250KVA, 415V DG sets
16.01.2014
CEIG/EI-2/AEI-2/CHN-
740/51038-42/13-14 dt: 1 x 20MW, 11KV generator & its connected load.
25.03.2014
ACEI/BS/AEI/PI/870-71/14-15
4 multiplex screen
dt: 03.05.2014
Commaon area & utility loads of MSB Tower (4) having
CEIG/EI-2/AEI-2/BS-398A/
20494-97/13-14 dt: 24.08.2013
2BF+GF+13UF together with 2 x 2000KVA, 11/433V
HT transformer s/s.
CEIG/EI-2/AEI-2/MNG-562
1 x 750KVA, 11/433V transformer s/s & its connected
F/25006-09/13-14 dt:
load
25.09.2013
CEIG/EI-2/AEI-2/MNG-562
remaining 1 x 1000KVA, 11/433V transformer sub-station ( out
G/31551-54/13-14 dt:
of 2 x 1000KVA TR) feeding the loads of
12.11.2013
CEIG/ACEI/EI-2/AEI-2/
MSB Block-A Wing-4 having GF+8UF & 1 x 250KVA,
MYS-514A/29616-19/13-14
11/433V transformer.
dt: 31.10.2013
3 screen Multiplex
CEIG/ACEI/EI-2/AEI-2/UDP-
Residential MSB having BF+GF+12UF & 1 x 125KVA, 415V
766/5124-28/14-15
DG set., 1 x 750KVA, 11/433V transformer centre
dt:30.05.2014
Common area & utility loads of MSB having 2BF+GF+5UF ( LT
CEIG/ACEI/EI-2/AEI-2/BS-
loads of GF+1st floor) together with 1 x 1250KVA, 11/433V
762/3980-84/14-15
transformer sub-station & its connected 11KV BESCOM
dt:19.05.2014
Infrastructure.
CEIG/ACEI/EI-2/AEI-2/BS- Comman area & utility loads of the MSB having 3BF+GF+5UF
763/4490-94/14-15 & 2 x 2500KVA, 11/433 transformer s/s & 11KV BESCOM
dt:26.05.2014 infrstructure
CEIG/ACEI/EI-2/AEI-2/BS-
MSb Block (F1) having BF+GF+4UF+TF replaced 1 x 750KVA,
707/35940-44/13-14 dt:
11/433V transformer s/s
13.12.2013
Jul-14
Common area & Utility loads of MSB (a) Office Block having
CEIG/ACEI/EI-2/AEI-2/BS-
GF+8UF (b)Hotel Block having LBF+UBF+GF+9UF & 1 x
761/4010-14/14-15
750KVA, 11/433V & 2 x 400KVA, 11V/433V transformer sub-
dt:19.05.2014
station & connected 11KV BESCOM Infrastructure.
CEIG/ACEI/EI-2/AEI-2/BS-
719A/5433-37/14-15 dt: 2 x 500KVA, & 1 x 250KVA,415V DG set
06.06.2014
4 Multiplex screen
CEIG/ACEI/EI-2/AEI-2/BS-
706A/1698-702/14-15 dt: 2 x 200KVA, 415V DG stes
25.04.2014
5 Multiplex screen
CEIG/ACEI/EI-2/AEI-2/BS-
Residential MSB wing A & B each wing having BF+GF+6UF &
765/5017-21/14-15 dt:
2 x 250KVA, 11/433V transformer & its connected 11KV
29.05.2014
CEIG/EI-2/AEI-2/BS-645
A/21476-79/13-14 dt:
02.09.2013
1 x 250KVA, 415V DG set
CEIG/ACEI/EI-2/AEI-2/BS-
Residential MSB having BF+GF+7UF+TF, 1 x 250KVA,
771/6393-98/14-15 dt:
11/433V transformer, 1 x 160KVA, 415V DG set.
19.06.2014
Addl LT loads to an extent of 593KW with existing 1 x
CEIG/ACEI/EI-2/AEI-2/2968-
2000KVA, 1 x 1500KVA, 1 x 750KVA & 1 x 500KVA, 11/433V
72/14-15 dt:08.05.2014
HT installation.
CEIG/EI-2/AEI-2/BS-
669/17794-97/13-14 dt: Residential MSB Block-B having BF+GF+8UF & 1 x
08.08.2013 for Block-A & B 500KVA, 11/433V transformer centre.
& 2 x 500KVA transformer
CEIG/ACEI/EI-2/AEI-2/BS-761
A/10413-17/14-15 dt:
16.07.2014
2 x 380KVA, 415V DG set
CEIG/ACEI/EI-2/AEI-2/BS-
398B/33406-09/13-14 dt: 1 x 1500KVA, 415V DG set
02.12.2013
CEIG/ACEI/EI-2/AEI-2/BS-769
1 x 1500KVA, 415V DG set
D/6428-32/14-15 dt: 19.06.2014
CEIG/ACEI/EI-2/AEI-2/BS-769
1 x 1500KVA, 415V DG set
E/6417-21/14-15 dt: 19.06.2014
CEIG/ACEI/EI-2/AEI-2/10637- Roof Top Solar Plant (a) 252 Kwp capacity on SRR(1) (b)
42/14-15 dt: 21.07.2014 249Kwp capacity at SRR(2)
CEIG/ACEI/EI-2/AEI-2/BS-
LT floor loads of ground floor to 6th UF to an extent of 1381KW
593G/2804-08/14-15
in the MSB(5) Block D1 having 3BF+GF+6UF
dt:05.05.2014
CEIG/ACEI/EI-2/AEI-2/BS-
Residential MSB having BF+LGF+UGF+17UF, 1 x 750KVA,
772/6388-92/14-15 dt:
11/433V transformer,
19.06.2014
Aug-14
CEIG/ACEI/EI-2/AEI-2/BS-372
1 x 3000KVA, 11KV DG set
F/7270-74/14-15 dt: 26.06.2014
CEIG/ACEI/EI-2/AEI-2/BS-
LT loads of 3rd & 4th floor to an extent of 126.64KW in the
359E/8637-41/14-15 dt:
MSB Block(B) having BF+GF+9UF
30.06.2014
CEIG/ACEI/EI-2/AEI-2/BS- Common area & utility loads of MSB Block (B4) having
769/7240-44/14-15 dt: 3BF+GF+8UF & 2 x 1600KVA, 11KV/433V transformer s/s &
25.06.2014 its connected 11KV BESCOM infrastructure
CEIG/ACEI/EI-2/AEI-2/BS-372
Addl 1 x 3000KVA, 11KV/433V transformer.
D/6986-90/14-15 dt: 24.06.2014
CEIG/ACEI/EI-2/AEI-2/BS-372
1 x 2000KVA, 415V DG set
E/6981-85/14-15 dt: 24.06.2014
Solar Roof Top Plant (a) 120KWP capacity Solar Roof Top
CEIG/ACEI/EI-2/AEI-2/2975-
Plant on Block (2) (b) 306Kwp Solar Roof Top plant on Block
79/14-15 dt:08.05.2014
(4)
1 x 7MVA, 66/6.6KV tr s/s, 1 x 250KVA, 6.6KV/433V Auxiliary
CEIG/ACEI/EI-2/AEI-2/MYS- tr, 3 x 1500KW, 6.6KV motors at Alambur pumping station for
721/47234-38/13-14 dt: arranging power supply to an extent of 5500KVA on 66KV in
20.02.2014 favour of Executive Engineer, Kabini Canals division, CNNL,
nanjangud, Mysore for their lift irrigation scheme Stage-I
CEIG/ACEI/EI-2/AEI-2/BS- Common area & utility loads of MSB having BF+GF+9UF & 2 x
777/11206-10/14-15 dt: 1600KVA, 11/433V transformer s/s & its connected 11KV
24.07.2014 BESCOM infrastructure
CEIG/ACEI/EI-2/AEI-2/BS-
778/10968-72/14-15 dt: 5KW 3phase solar Roof Top Plant
23.07.2014
CEIG/ACEI/EI-2/AEI-2/BS-724
A/13583-88/14-15 dt: 1 x 1600KVA, 415 V set, 2 x 1813KVA, 415V DG set
04.08.2014
CEIG/ACEI/EI-2/AEI-4/BS-763
A/11840-44/14-15 dt: 2 x 1500KVA, 415V DG set( out of 3 x 1500KVA, 415V DG set)
01.08.2014
CEIG/ACEI/EI-2/AEI-2/5399-
3 x 2000KVA, & 2 x 250KVA,415V DG set
403/14-15 dt: 06.06.2014
Nil
7 multiplex screen
Sep-14
CEIG/ACEI/EI-2/AEI-4/MNG-438 MSB (sports centre) having GF+2UF+TF with connected loads
D/11125-29/14-15 dt: of 262.2KW fed from the existing 1 x 3MVA, 11/433V
23.07.2014 transformer s/s
CEIG/ACEI/EI-2/AEI-2/MNG-
767A/5941-45/14-15 dt: 1 x 1000KVA, 415V DG set
16.06.2014
a) Resdiential cum commercial MSB A having LGF+UGF+8UF
CEIG/ACEI/EI-2/AEI-2/UDP-
(b) Residential Building B having Stilt+GF+3UF together with 1
754/1914-19/13-14 dt:
x 630KVA, 11/433V transformer centre & connected 11KV
30.04.2014
MESCOM Infratsructure, 1 x 125KVA, 415V DG set.
CEIG/ACEI/EI-2/AEI-2/MNG-774
1 x 125KVA, 415V DG set
A/9670-74/14-15 dt: 10.07.2014
CEIG/ACEI/EI-2/AEI-2/1550-
1 x 35KVA, 415V DG set.
54/14-15 dt:22.04.2014
CEIG/ACEI/EI-2/AEI-2/8970-
LT loads to an extent of 160KW of Bio Boiler House
74/14-15 dt: 03.07.2014
CEIG/ACEI/EI-2/AEI-2/BS-
LT loads of 4th floor {(half portion of B wing (east)} to n extent
105H/1878-82/14-15
of 89.86KW in the MSB (1) having 2BF+GF+7UF.
dt:30.04.2014
CEIG/ACEI/EI-2/AEI-2/12532-
3 x 1500KVA, 415V DG sets
36/14-15 dt: 08.08.2014
CEIG/ACEI/EI-2/AEI-2/12491-
5 x 1500KVA, 415V DG sets
95/14-15 dt: 07.08.2014
CEIG/ACEI/EI-2/AEI-2/9180-
2 x 1010KVA, & 1 x 1000KVA, 415V DG set
84/14-15 dt: 07.07.2014
CEIG/ACEI/EI-2/AEI-2/9095-
1 x 2000KVA, 415V DG set
99/14-15 dt: 04.07.2014
CEIG/ACEI/EI-2/AEI-2/4118-
22/14-15 dt:21.05.2014 for Block common area & LT loads MSB Block (1) having 2BF+GF+6UF
(1) & (2) together with 1 x with the existing 1 x 1250KVA, 11/433V Tr s/s
1250KVA s/s
CEIG/ACEI/EI-2/AEI-2/BS-569
B/12121-25/14-15 dt: 2 x 500KVA & 1 x 380KVA, 415V DG set
04.08.2014
CEIG/ACEI/EI-2/AEI-4/14360-
1 x 1250KVA, 11/433V temporary Tr s/s-3
64/14-15 dt: 27.08.2014
CEIG/ EI-2/AEI-2/BS-
539/14113-16/12-13 dt:
1 x 2000KVA, 11/433V TR s/s
08.08.2012 for MSB & 1 x 2MVA
TR s/s
CEIG/ACEI/EI-2/AEI-2/14450-
2 x 1250KVA, 415V & 2 x 750KVA, 415V DG set
54/14-15 dt: 30.08.2014
CEIG/ACEI/EI-2/AEI-2/BS-462
3 x 1010KVA & 2 x 500KVA, 415V DG sets feeding the towers
A/13628-32/14-15 dt:
B1-B6, c1-C4 & D1-D2
19.08.2014
CEIG/ACEI/EI-2/AEI-4/UDP-
254/17941-45/14-15 1 x 63KVA, 415V DG set
dt:25.09.2014
CEIG/ACEI/EI-2/AEI-4/MYS-291
LT loads of to an extent of 10KW for Drivers Lounge building
L/12538-42/14-15 dt:
having GF+TF
08.08.2014
CEIG/ACEI/EI-2/AEI-2/BS-372
LT loads to an extent of 570.1Kw for stability centre-1203 with
G/13560-64/14-15 dt:
the existing 2 x 2.5MVA, 11/433V transformer s/s
18.08.2014
Oct-14
CEIG/ACEI/EI-2/AEI-2/MYS-304
1 x 180KW, 415V Stream Turbo generator set
B/3967-71/14-15 dt:19.05.2014
CEIG/ACEI/EI-2/AEI-2/BW-191
LT loads of 5th & 6th floor to an extent of 331KW in the MSB
N/13594-98/14-15 dt:
Tower 'C" having GF+7UF
18.08.2014
CEIG/EI-2/AEI-2/BS-683/25033-
Residential MSB Tower-2 Tower-3 & Tower-4 each tower
36/13-14 dt: 25.09.2013 Tower
having BF+GF+10UF together with 3 x 500KVA, 11/433V Tr
1, 2,3 & 4 & Club House
centres & connected 11KV BESCOM infrastructure.
together with 4 x 500KVA Tr
CEIG/ACEI/EI-2/AEI-2/BS-205
LT loads of GF 1st floor to an extent of 235KW in the MSB
AC/12099-103/14-15 dt:
Block-5
04.08.2014
CEIG/ACEI/EI-2/AEI-4/MNG-
LT loads of residential MSB having GF+11UF together with 1 x
804/19986-90/14-15
250KVA, 11/433V Tr centre &
dt:14.10.2014
CEIG/ACEI/EI-2/AEI-2/BS-205
LT loads of 3rd floor to an extent of 349.6KW in the MSB
AE/17921-25/14-15
Block(4) having 2BF+GF+9UF
dt:23.09.2014
CEIG/ACEI/EI-2/AEI-4/MNG-714
C/11137-41/14-15 dt: LT loads of ground floor to an exstent of 45KW at Forum Mall
24.07.2014
CEIG/EI-2/AEI-2/BS-
LT loads of residential MSB Block(1) Wing B having
705/34768-71/13-14 dt:
BF+GF+12UF
6.12.2013
CEIG/EI-2/AEI-2/BS-705
A /34798-801/13-14 dt: 2 x 500KVA, 11/433V distribution tr
6.12.2013
Nov-14
CEIG/ACEI/EI-2/AEI-2/BS-777
A/ 22551-55/14-15
dt:31.10.2014
2 x 1500KVA, 415V DG set
Common area & utility loads of MSB having Block (A) having
` 2BF+GF+9UF+TF & 2 x 2000KVA, 11/433V transformer sub-
station
CEIG/ACEI/EI-1/AEI-1/BN-
280 A/20724-28/14-15
dt:20.10.2014 1 x 500KVA, 415V DG set feeding the loads of existing
MSB Block © & (D)
CEIG/ACEI/EI-2/AEI-2/18185-
1 x 1250KVA, 415V DG set
89/14-15 dt:27.09.2014
CEIG/ACEI/EI-2/AEI-2/BS-205
LT loads of 3rd floor to an extent of 220KW in the MSB {Block
AD/17841-45/14-15
(7)} having 2BF+GF+8UF
dt:22.09.2014
CEIG/ACEI/EI-2/AEI-2/BW--
LT loads of 1st & 2nd floor to an extent of 606.56KW in the
191O/ 20347-51/14-15
MSB Block (B) having LBF+UBF+GF+7UF
dt:16.10.2014
CEIG/ACEI/EI-2/AEI-2/BS-784 LT loads of 8th, 9th & 10th floor to an extent of 826.6KW in the
D/20336-41/14-15 dt:16.10.2014 MSB Block (8A) having 3BF+GF+10UF
CEIG/ACEI/EI-2/AEI-2/20836-
1 x 1500KVA & 1 x 1010KVA, 415V DG set
40/14-15 dt:23.10.2014
CEIG/ACEI/EI-2/AEI-2/BS-
777 /23444-49/14-15 1 x 1500KVA, 415V DG set
dt:10.11.2014
CEIG/ACEI/EI-2/AEI-4/MYS-662
48.8Kwp Capacity 3Phase Solar Roof top Plant.
A/22025-29/14-15 dt:30.10.2014
Dec-14
CEIG/ACEI/EI-2/AEI-2/22035-
LT loads to an extent of 209KW in the existing MSB Block (8A)
39/14-15 dt:30.10.2014
CEIG/ACEI/EI-2/AEI-2/16286-
1 x 500KVA, 415V Dg set
90/14-15 dt: 10.09.2014
CEIG/ACEI/EI-2/AEI-2/BS-
LT loads of Ground floor to an extent of 144.47KW in the MSB
205AF/20587-91/14-15
Block(5)
dt:17.10.2014
CEIG/ACEI/EI-2/AEI-2/21818- LT loads of 1st & 2nd floor to an extent of 398.4KW in the MSB
22/14-15 dt:29.10.2014 Block(B4)
CEIG/ACEI/EI-2/AEI-4/25329-
1 x 40KVA, 415V DG set by 1 x 62.5KVA, 415V DG set
33/14-15 dt:27.11.2014
CEIG/ACEI/EI-2/AEI-2/19873-
LT loads to an extent of 3693KW
77/14-15 dt:13.10.2014
CEIG/ACEI/EI-2/AEI-2/BS-
248/17946-50/14-15 1 x 160KVA, 415V DG set
dt:25.09.2014
CEIG/ACEI/EI-2/AEI-2/BS-
Lt loads of ground floor ( east wing) to an extent of 257.8KW in
105 /23100-04/14-15
the M.S.Building (1) ( east Wing) having 2BF+GF+7UF
dt:05.11.2014
CEIG/ACEI/EI-2/AEI-2/23496-
1 x 2500KVA, 11/433V transformer s/s for utility block (S11)
500/14-15 dt:11.11.2014
CEIG/ACEI/EI-2/AEI-2/26067-
71/14-15 dt: 02.12.2014
1 x 1010KVA, 415V DG set
CEIG/ACEI/EI-2/AEI-2/20631-
211Kwp roof top solar power plant for captive consumption
35/14-15 dt:17.10.2014
CEIG/ACEI/EI-2/AEI-2/18292-
1 x 320KVA, 415V DG set feeding the loads of North Block
96/14-15 dt:27.09.2014
Jan-15
CEIG/ACEI/EI-2/AEI-4/BS-
1 x 2200KVA, 415V Additional DG set feeding the existing
205AH/26222-26/14-15
loads of utility block.
dt:02.12.2014
CEIG/ACEI/EI-2/AEI-4/BS-
1 x 2200KVA, 415V Additional DG set feeding the existing
205AG/26217-21/14-15
loads of MSB Block (7)
dt:02.12.2014
Replacement of existing 8145KVA, 11KV DG sets 7 & 8 each
CEIG/ACEI/EI-2/AEI-4/24309-
with similar 8145, 11KV Old DG sets earlier in operation at
13/14-15 dt:14.11.2014
position 5 & 6
CEIG/ACEI/EI-2/AEI-2/26839-
Addl 1 x 1500KVA, 415V DG set
43/14-15 dt:10.12.2014
CEIG/ACEI/EI-2/AEI-4/25282-
1 x 200KVA, 415V DG set
86/14-15 dt:26.11.2014
CEIG/ACEI/EI-2/AEI-4/25291-
1 x 200KVA, 415V DG set
95/14-15 dt:26.11.2014
CEIG/ACEI/EI-2/AEI-2/30149-
1 x 250KVA, & 1 x 380KVA, 415V DG set
53/14-15 dt: 08.01.2015
CEIG/ACEI/EI-2/AEI-2/26959-
50Kwp Solar Roof Top Grid Power system
63/14-15 dt:10.12.2014
CEIG/ACEI/EI-2/AEI-2/BS-
716/40574-78/13-14
dt:17.01.2014 for 3 x 500KVA, Residential MSB consisting of Wing C, D & E each wing
11/433V tr & MSB Tower(1) having BF+GF+9UF & 1 x 500KVA, 11/433V Tr s/s.
consisting of Wing A & B &
Tower (2) having wing C, D & E.
CEIG/ACEI/EI-2/AEI-2/30466-
70/14-15 dt: 13.01.2015
2 x 1500KVA, 415V DG sets
CEIG/ACEI/EI-2/AEI-2/BS-76A/ Replacement of Old metering panel ( Panel No:10 7 11) by
9386-90/14-15 dt: 08.07.2014 new metering panels
CEIG/ACEI/EI-2/AEI-2/26630-
3 x 500KVA, 415V DG sets.
34/14-15 dt:09.12.2014
CEIG/ATS--MNG-340/10216-
Building Type-D Medical PG Hostel Block havingBF+GF+6UF
21/11-12 dt: 22.07.2011
3 Screen Multiplex
CEIG/ACEI/EI-2/AEI-2/2226-
1 x 1000KVA, 415V DG set
30/14-15 dt:31.05.2014
CEIG/EI-2/AEI-2/BS-613/28741-
444/13-14 dt: 22.10.2013
1 x 3.45KWp & 2 x 5.06KWp Solar PV system
CEIG/ACEI/EI-2/AEI-2/28257-
Eight screen Multiplex Theatre
61/14-15 dt:26.12.2014
CEIG/ACEI/EI-2/AEI-2/33644-
48/14-15 dt:07.02.2015
LT loads of 7th , 8th & 9th floor to an extent of 512.8KW in the
MSB having BF+GF+9UF
CEIG/ACEI/EI-2/AEI-2/32424-
5 x 1500KVA, 415V DG sets
28/14-15 dt:03.02.2015
CEIG/ACEI/EI-2/AEI-2/32419-
2 x 1500KVA, 415V DG sets
23/14-15 dt:03.02.2015
CEIG/ACEI/EI-2/AEI-2/26643- LT loads of 1st floor & 2nd floor & 3rd floor half portion to an
47/14-15 dt:9.12.2014 extent of 280KW in the existing MS Block-8A
CEIG/ACEI/EI-2/AEI-2/BS-
1 x 500KVA, 11/433V transformers/s for arranging power
812/22145-49/14-15
supply to LT loads of GF+3UF in Block (A1)
dt:30.10.2014
CEIG/ACEI/EI-2/AEI-2/MYS-786
1 x 160KVA, 415V DG set
A/23090-94/14-15 dt:05.11.2014
CEIG/ACEI/EI-2/AEI-4/MNG-
810/22150-54/14-15
dt:30.10.2014 Residentail cum
Commercial MSB 1 x 315KVA,
Commercial loads of GF, 1st & portion of 2nd floor in the MSB
11/433V HT s/s & residential
having 2BF+GF+11UF fed from 1 x 315KVA, 11/433V HT s/s
loads of (3rd to 11UF & portion
of 2nd UF) fed from 1 x 750KVA,
11/433V tr together with 2 x
250KVA, 415V DG sets
CEIG/ACEI/EI-2/AEI-2/33948- LT loads of ground floor & 4th floor to 9th floor to an extent of
52/14-15 dt:11.02.2015 1755KW in the existing MSB having B3+B2+B1+GF+9UF.
Mar-15
CEIG/ACEI/EI-2/AEI-2/BS-
370/15551-54/11-12
dt:25.08.2011 for Block,Wing MSB Block-2 comprising of Wing'E' having
A to H & J to N & 28 x B2+B1+GF+20UF+TF
500KVA, 11/433V
transformer centre
CEIG/ACEI/EI-2/AEI-2/35210-
1 x 1000KVA, 11/433V transformer
14/14-15 dt: 21.02.2015
CEIG/ACEI/EI-2/AEI-2/33720- LT loads of ground floor & 3rd , 4th & 5th floor to an extent of
24/14-15 dt:09.02.2015 1430KW of B wing in the MSB having LBF+UBF+GF+5UF
CEIG/ACEI/EI-2/AEI-2/BS-
LT loads of 1st floor to fifth floor to an extent of 1092.1KW in
724 /26636-40/14-15
the MSB having 2BF+GF+11UF
dt:09.12.2014
CEIG/ACEI/EI-2/AEI-2/32905-
1 x 200KVA, 415V & 2 x 125KVA, 415V DG sets
09/14-15 dt:04.02.2015
CEIG/ACEI/EI-2/AEI-4/MNG- Residential cum Commercial MSB having BF+GF+7UF & 1 x
815/28015-19/14-15 500KVA, 11/433V transformer centre & 1 x 82.5KVA, 415V
dt:23.12.2014 DG set
CEIG/ACEI/EI-2/AEI-4/34656-
2 x 160KVA, 415V DG sets
60/14-15 dt:18.02.2015
CEIG/ACEI/EI-2/AEI-2/BS-
LT loads of 9th floor to an extent of 63.3KW in the MSB having
143D/3795-99/14-15
GF+9UF
dt:14.05.2014
CEIG/ACEI/EI-2/AEI-4/28873-
150Kwp capacity Solar Roof Top Power Plant.
77/14-15 dt:31.12.2014
ection
Date of
Date of Closure of File Distructio Remarks
n
Apporved Number & Date
dd/mm/yyyy
CEIG/EI-2/AEI-2/
MNG-708/192-97/14- 03.04.2014
15
CEIG/EI-2/AEI-2/BS-
08.04.2014
580/562-67/14-15
CEIG/EI-2/AEI-2/
MNG-562 D/887- 09.04.2014
92/14-15
CEIG/EI-2/AEI-
10.04.2014
2/913-18/14-15
CEIG/EI-2/AEI-2/BS-
10.04.2014
165B/940-45/14-15
CEIG/EI-2/AEI-2/BS-
10.04.2014
735/934-39/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-205V/928- 10.04.2014
33/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-205U/920- 26.04.2014
25/14-15
CEIG/ACEI/EI-2/
AEI-2/MNG- 05.04.2014
725/438-42/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-578C/ 16.04.2014
1005-10/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-735B/ 16.04.2014
1011-16/14-15
CEIG/ACEI/EI-2/
16.04.2014
AEI-2/1034-39/14-15
CEIG/ACEI/EI-2/
AEI-2/RNG-145 16.04.2014
C/1025-31/14-15
CEIG/EI-2/AEI-2/BS-
16.04.2014
105E/1051-56/14-15
CEIG/EI-2/AEI-2/BS-
735 A/999-1004/14- 16.04.2014
15
CEIG/ACEI/EI-2/
AEI-2/BS-403D/ 19.04.2014
1129-34/14-15
CEIG/ACEI/EI-2/
AEI-2/MYS-291G/ 21.04.2014
1430-35/ 14-15
CEIG/ACEI/EI-2/
AEI-2/BS-372B/ 21.04.2014
1516-21/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-71 L/1632- 23.04.2014
37/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-71 23.04.2014
M/1626-31/14-15
CEIG/ACEI/EI-2/
AEI-2/BW-120A/ 25.04.2014
1664-69/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-741/1670- 25.04.2014
75/ 1664-69/14-15
CEIG/ACEI/EI-2/
AEI-2/MNG- 25.04.2014
727/1692-97/ 14-15
CEIG/ACEI/EI-2/
AEI-2/BS-541D/ 25.04.2014
1677-81/14-15
CEIG/ACEI/EI-2/
AEI-2/SMG- 26.04.2014
602/1718-23/14-15
CEIG/ACEI/EI-2/
AEI-2/MNG- 26.04.2014
714/1730-34/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-732/1823- 28.04.2014
28/14-15
CEIG/ACEI/EI-2/
05.05.2014
AEI-2/2721-26/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-730/2812- 06.05.2014
17/14-15
CEIG/ACEI/EI-2/
08.05.2014
AEI-2/2944-48/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-452F/2949- 08.05.2014
54/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-321/3263- 12.05.2014
68/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-370/3242- 12.05.2014
47/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-323 12.05.2014
A/3278-83/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-79/3270- 12.05.2014
75/14-15
CEIG/ACEI/EI-2/
AEI-2/RNG-46 13.05.2014
D/3647-52/14-15
CEIG/ACEI/EI-2/
AEI-2/MNG-710 14.05.2014
A/3829-34/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-731/3901- 17.05.2014
05/14-15
CEIG/ACEI/EI-2/
AEI-2/MNG-714A/ 17.05.2014
3932-37/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-519B/ 19.05.2014
3998-4003/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-736/3987- 19.05.2014
92/14-15
CEIG/ACEI/EI-2/
AEI-2/RNG-198 19.05.2014
A/3972-76/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-270E/ 19.05.2014
4004-09/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-755/ 4355- 23.05.2014
60/14-15
CEIG/ACEI/EI-2/
AEI-2UDP-743/ 23.05.2014
4361-65/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-71K/4565- 26.05.2014
70/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-609 28.05.2014
B/4652-57/14-15
CEIG/ACEI/EI-2/AEI-
2/MDY-510/4894-99/14- 28.05.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-749/4870-75/14- 28.05.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-609/4645-50/14- 28.05.2014
15
CEIG/ACEI/EI-2/AEI-
2/BW-191 M/4638- 28.05.2014
44/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-213C/4997-01/14- 29.05.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-642 A/4966-72/14- 29.05.2014
15
CEIG/ACEI/EI-2/
AEI-2/BS-642B/ 30.05.2014
5118-23/14-15
CEIG/ACEI/EI-2/
AEI-2/BS-677B/ 30.05.2014
5132-36/14-15
CEIG/ACEI/EI-2/AEI-
2/MNG-744/5051- 30.05.2014
55/14-15
CEIG/ACEI/EI-2/AEI-
2/MNG-745/5047- 30.05.2014
51/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-574/5056-60/14- 30.05.2014
15
CEIG/ACEI/EI-2/AEI-
2/MYS-291 H/5112- 30.05.2014
17/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-757/5183-87/14- 31.05.2014
15
CEIG/ACEI/EI-2/AEI-
02.06.2014
2/5245-50/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-205 X/5371-76/14- 04.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/MNG-658/5418- 06.06.2014
22/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-726 A/5428-32/14- 06.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-726/5423-27/14- 06.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-748/5624-28/14- 09.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-541G/5649-53/14- 09.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-759/5700-05/14- 10.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-694/5741-45/14- 10.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-698 A/5719-24/14- 10.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-310 C/5766- 11.06.2014
71/14-15
CEIG/ACEI/EI-2/AEI-
16.06.2014
2/5911-17/14-15
CEIG/ACEI/EI-2/AEI-
16.06.2014
2/5925-30/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-758 A/6104-09/14- 16.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/MNG-745 A/6655- 20.06.2014
60/14-15
CEIG/ACEI/EI-2/AEI-
2/MNG-744 A/6523- 20.06.2014
28/14-15
CEIG/ACEI/EI-2/AEI-
2/CHN-713/6422-27/14- 19.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/CHN-740/6230-35/14- 18.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-758/6450-55/14- 19.06.2014
15
CEIG/ACEI/EI-2/AEI-
18.06.2014
2/6237-43/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-398A/6196- 18.06.2014
201/14-15
CEIG/ACEI/EI-2/AEI-
2/CHN-740A/6244- 18.06.2014
49/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-594/6251-56/14- 18.06.2014
15
CEIG/ACEI/EI-2/AEI-
2/MNG-562 F/6202- 18.06.2014
07/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-706/6861-66/14- 23.06.2014
15
CEIG/ACEI/EI-2/AEI-
4/UDP-238 B/6211- 18.06.2014
16/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-562 G/6796- 23.06.2014
80/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-562 K/7374- 26.06.2014
80/14-15
CEIG/ACEI/EI-2/AEI-
4/MYS-514 A/8097- 26.06.2014
102/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-737/8103- 26.06.2014
08/14-15
CEIG/ACEI/EI-2/AEI-
26.06.2014
4/8120-25/14-15
CEIG/ACEI/EI-2/AEI-
4/UDP-766/8109-14/14- 26.06.2014
15
CEIG/ACEI/EI-2/AEI-
4/BS-762/8258-63/14- 28.06.2014
15
CEIG/ACEI/EI-2/AEI-
4/BS-763/8252-57/14- 28.06.2014
15
CEIG/ACEI/EI-2/AEI-
28.06.2014
4/BS-/8358-63/14-15
CEIG/ACEI/EI-2/AEI-
4/MYS-746/8376-81/14- 28.06.2014
15
CEIG/ACEI/EI-2/AEI-
4/BS-707/8551-56/14- 30.06.2014
15
CEIG/ACEI/EI-2/AEI-
4/BS-761/8833-38/14- 01.07.2014
15
CEIG/ACEI/EI-2/AEI-
4/BS-719A/8907-12/14- 01.07.2014
15
CEIG/ACEI/EI-2/AEI-
4/MNG-220B/8964- 03.07.2014
69/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-731/9074- 04.07.2014
79/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-733/9267- 07.07.2014
73/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-724/9247-52/14- 07.07.2014
15
CEIG/ACEI/EI-2/AEI-
2/BW-45 B/9687-92/14- 10.07.2014
15
CEIG/ACEI/EI-2/AEI-
09.07.2014
4/9504-09/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-706 A/9999-04/14- 11.07.2014
15
CEIG/ACEI/EI-2/AEI-
14.07.2014
2/10042-45 /14-15
CEIG/ACEI/EI-2/AEI-
2/BS-765/9916-21 /14- 11.07.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-645 A/9930-35 11.07.2014
/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-742/10191-95 /14- 15.07.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-372 C/10343-48 16.07.2014
/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-768/10391-95 /14- 16.07.2014
15
CEIG/ACEI/EI-2/AEI-
2/MNG-751/10486-90 17.07.2014
/14-15
CEIG/ACEI/EI-2/AEI-
2/MNG-753/10481-85 17.07.2014
/14-15
CEIG/ACEI/EI-2/AEI-
2/MNG-752/10501- 17.07.2014
05/14-15
CEIG/ACEI/EI-2/AEI-
2/MNG-770/10496- 17.07.2014
500/14-15
CEIG/ACEI/EI-2/AEI-
2/MNG-771/10491- 17.07.2014
95/14-15
CEIG/ACEI/EI-2/AEI-
2/RNG-104 B/10513- 17.07.2014
18/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-669/10650-55/14- 21.07.2014
15
CEIG/ACEI/EI-2/AEI-
22.07.2014
4/10912-17/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-761 A/11239- 24.07.2014
44/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-398 B/11217- 24.07.2014
22/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-769 D/11379- 28.07.2014
84/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-769 E/11373- 28.07.2014
78/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-776/11470-75/14- 28.07.2014
15
CEIG/ACEI/EI-2/AEI-
2/BE-365 D/11460- 28.07.2014
64/14-15
CEIG/ACEI/EI-2/AEI-
2/BE-365 E/11455- 28.07.2014
59/14-15
CEIG/ACEI/EI-2/AEI-
2/MNG-562 E/11432- 28.07.2014
36/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-593 F/11497- 30.07.2014
502/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-593 G/11481- 30.07.2014
85/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-772/10623-28/ 18.07.2014
14-15
CEIG/ACEI/EI-2/AEI-
01.08.2014
2/11859-64/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-372 F/12091- 04.08.2014
96/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-359 E/12239- 04.08.2014
44/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-769 D/12272- 05.08.2014
77/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-769 /12459-63/14- 07.08.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-372 D/12079-84/ 04.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-372 E/12085-90/ 04.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/11990-95/ 14-15
04.08.2014
CEIG/ACEI/EI-2/AEI-
2/MYS-721/12354-59/ 07.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/MYS-722/12348-53/ 07.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/MYS-723/13113-18/ 12.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-777/13023-28/ 14- 12.08.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-778/13372-77/ 14- 16.08.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-724 A/13583-88/ 18.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-763 A/13565-70/ 18.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/CHN-740 D/13460-65/ 16.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-769/13657-62/ 14- 19.08.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-59A/13571-76/ 14- 18.08.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-462/13681-86/ 14- 19.08.2014
15
CEIG/ACEI/EI-2/AEI-
2/13505-10/ 14-15
18.08.2014
CEIG/ACEI/EI-2/AEI-
4/MYS-782/13466-71/ 16.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-769C/13663-68/ 19.08.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-569/13792-96/ 14- 22.08.2014
15
CEIG/ACEI/EI-2/AEI-
2/13893-98/ 14-15
25.08.2014
CEIG/ACEI/EI-2/
AEI-4/14612-17/14- 30.08.2014
15
CEIG/ACEI/EI-2/
AEI-2/BS-755 30.08.2014
A/14444-49/14-15
CEIG/ACEI/EI-2/
AEI-4/MNG-173 30.08.2014
A/14746-51/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-438 D/15179- 02.09.2014
84/ 14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-767/15173-78/ 02.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-767 A/15167- 02.09.2014
72/ 14-15
CEIG/ACEI/EI-2/AEI-
4/UDP-754/15126-31/ 02.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-774/15504-09/ 03.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-774 A/15498- 03.09.2014
503/ 14-15
CEIG/ACEI/EI-2/AEI-
4/UDP-533A/15247-52/ 03.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/15229-34/ 14-15
02.09.2014
CEIG/ACEI/EI-2/AEI-
4/MNG-738/15221-26/ 02.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-221 B/15775- 06.09.2014
80/ 14-15
CEIG/ACEI/EI-2/AEI-
2/BS-105 H/15769-74/ 05.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-220C/15753-58/ 05.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-562 M/16377- 11.09.2014
82/ 14-15
CEIG/ACEI/EI-2/AEI-
2/BS-728/16246-50/ 14- 10.09.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-784 A/16468-73/ 12.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-784 C/16524-29/ 15.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-784 D/16518-23/ 15.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/RNG-775/16484-89/ 15.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/16550-55/ 14-15
16.09.2014
CEIG/ACEI/EI-2/AEI-
2/16544-49/ 14-15
16.09.2014
CEIG/ACEI/EI-2/AEI-
2/BS-760/16511-16/ 14- 15.09.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-642 B/16557-62/ 16.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/TMR-747/16966-71/ 17.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/17070-75/ 14-15
18.09.2014
CEIG/ACEI/EI-2/AEI-
2/BS-569 B/17155-60/ 19.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/17394-98/ 14-15
20.09.2014
CEIG/ACEI/EI-2/AEI-
2/BS-784 B/17893-98/ 23.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-539/17951-56/ 14- 25.09.2014
15
CEIG/ACEI/EI-2/AEI-
2/BN-280/18283-88/ 14- 27.09.2014
15
CEIG/ACEI/EI-2/AEI-
4/19046-51/ 14-15
30.09.2014
CEIG/ACEI/EI-2/AEI-
2/BS-462A/18312-16/ 27.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/UDP-795/19271-76/ 30.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/UDP-254 A/19277-82/ 30.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MYS-291 J/19313-18/ 30.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/UDP-787/19242-48/ 30.09.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MYS-291 L/193097- 30.09.2014
12/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-372 G/19301- 30.09.2014
06/14-15
CEIG/ACEI/EI-2/AEI-
2/UDP-501 R/18857- 29.09.2014
61/14-15
CEIG/ACEI/EI-2/AEI-
2/UDP-501 R/18852- 29.09.2014
56/14-15
CEIG/ACEI/EI-2/AEI-
2/UDP-301/ 18862- 29.09.2014
66/14-15
CEIG/ACEI/EI-2/AEI-
2/UDP-501'O'/ 18867- 29.09.2014
71/14-15
CEIG/ACEI/EI-2/AEI-
4/MYS-304 B/19337-42/ 01.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MYS-781/19590-94/ 09.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-438 E/19574- 09.10.2014
78/ 14-15
CEIG/ACEI/EI-2/AEI-
2/BS-105 K/19580-84/ 09.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-105 J/19585-89/ 09.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BW-191 N/20364-69/ 16.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-791/20396-402/ 16.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-683/20433-37/ 14- 16.10.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-205 AC/20652-57/ 18.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-804/21325-29/ 27.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-205 AE/ 21220- 27.10.2014
25/ 14-15
CEIG/ACEI/EI-2/AEI-
2/BS-793/20745-49/ 14- 20.10.2014
15
CEIG/ACEI/EI-2/AEI-
2/UDP-756/19674-79/ 13.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/20679-81/ 14-15
20.10.2014
CEIG/ACEI/EI-2/AEI-
2/BS-698 A/20959-64/ 25.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/20663-69/ 14-15
18.10.2014
CEIG/ACEI/EI-2/AEI-
2/21812-17/ 14-15
29.10.2014
CEIG/ACEI/EI-2/AEI-
2/22115-20/ 14-15
30.10.2014
CEIG/ACEI/EI-2/AEI-
4/MNG-714 C/22123- 30.10.2014
28/ 14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-808/22522-27/ 31.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-/22541-45/ 14- 31.10.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-705/22535-40/ 14- 31.10.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-705 A/22529-34/ 31.10.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-797/22565-70/ 14- 03.11.2014
15
CEIG/ACEI/EI-2/AEI-
4/23301-06/ 14-15
07.11.2014
CEIG/ACEI/EI-2/AEI-
2/23349-54/ 14-15
10.11.2014
CEIG/ACEI/EI-2/AEI-
2/BS-777A/23773-78/ 13.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-205 W/23804-08/ 13.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BN-280A/23779-84/ 13.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/24303-08/ 14-15
14.11.2014
CEIG/ACEI/EI-2/AEI-
2/24438-43/ 14-15
18.11.2014
CEIG/ACEI/EI-2/AEI-
2/BS-205AD/24372-76/ 15.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BW-119 O/24327-32/ 15.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-784 D/24321-26/ 15.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-750/24996-01/ 14- 24.11.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-747 A/25027-32/ 24.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-750 A/25394-99/ 27.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-777 B/25388-93/ 27.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MYS-662 A/25469-74/ 28.11.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/25711-16/ 14-15
29.11.2014
CEIG/ACEI/EI-2/AEI-
2/25699-704/ 14-15
29.11.2014
CEIG/ACEI/EI-2/AEI-
2/BS-784 F/26280- 03.12.2014
85/14-15
CEIG/ACEI/EI-2/AEI-
02.12.2014
2/26064-69/14-15
CEIG/ACEI/EI-2/AEI-
2/26273-79/ 14-15
03.12.2014
CEIG/ACEI/EI-2/AEI-
2/BS-764/26392-97/ 14- 06.12.2014
15
CEIG/ACEI/EI-2/AEI-
2/26653-58/ 14-15
09.12.2014
CEIG/ACEI/EI-2/AEI-
2/26659-64/ 14-15
09.12.2014
CEIG/ACEI/EI-2/AEI-
4/26784-88/ 14-15
10.12.2014
CEIG/ACEI/EI-2/AEI-
4/27623-28/ 14-15
19.12.2014
CEIG/ACEI/EI-2/AEI-
2/BS-248/27611-16/ 14- 19.12.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-105/23100-04/ 14- 17.12.2014
15
CEIG/ACEI/EI-2/AEI-
2/27463-68/ 14-15
18.12.2014
CEIG/ACEI/EI-2/AEI-
2/BS-719/27306-10/ 14- 17.12.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-184 K/27887-92/ 22.12.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-798/28022-27/ 14- 23.12.2014
15
CEIG/ACEI/EI-2/AEI-
4/MNG-562 L/28138- 24.12.2014
143/ 14-15
CEIG/ACEI/EI-2/AEI-
2/28120-125/ 14-15
24.12.2014
CEIG/ACEI/EI-2/AEI-
2/RNG-799/28238-43/ 24.12.2014
14-15
CEIG/ACEI/EI-2/AEI-
2/28126-131/ 14-15
24.12.2014
CEIG/ACEI/EI-2/AEI-
4/28132-137/ 14-15
24.12.2014
CEIG/ACEI/EI-2/AEI-
4/MNG-785/28528-33/ 29.12.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-221/28486-91/ 29.12.2014
14-15
CEIG/ACEI/EI-2/AEI-
4/28492-97/ 14-15
29.12.2014
CEIG/ACEI/EI-2/AEI-
4/28522-27/ 14-15
29.12.2014
CEIG/ACEI/EI-2/AEI-
4/28479-84/ 14-15
29.12.2014
CEIG/ACEI/EI-2/AEI-
4/28534-39/ 14-15
29.12.2014
CEIG/ACEI/EI-2/AEI-
4/28211-216/ 14-15
24.12.2014
CEIG/ACEI/EI-2/AEI-
4/28109-13/ 14-15
24.12.2014
CEIG/ACEI/EI-2/AEI-
2/BS-811/28653-58/ 14- 31.12.2014
15
CEIG/ACEI/EI-2/AEI-
2/BS-817/28647-52/ 14- 31.12.2014
15
CEIG/ACEI/EI-2/AEI-
UDP-134J/29013-18/ 31.12.2015
14-15
CEIG/ACEI/EI-2/AEI-
2/29358-63/ 14-15
03.01.2015
CEIG/ACEI/EI-2/AEI-
2/BS-205 AH/29121-26/ 02.01.2015
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-205 AG/29127-32/ 02.01.2015
14-15
CEIG/ACEI/EI-2/AEI-
2/29115-20/ 14-15
02.01.2015
CEIG/ACEI/EI-2/AEI-
4/MNG-801/29590-95/ 07.01.2015
14-15
CEIG/ACEI/EI-2/AEI-
2/29610-15/ 14-15
07.01.2015
CEIG/ACEI/EI-2/AEI-
4/MNG-802/29584-89/ 07.01.2015
14-15
CEIG/ACEI/EI-2/AEI-
2/29574-79/ 14-15
07.01.2015
CEIG/ACEI/EI-2/AEI-
2/BS-813/30119-24/ 14- 08.01.2015
15
CEIG/ACEI/EI-2/AEI-
2/BS-292/30492-97/ 14- 13.01.2015
15
CEIG/ACEI/EI-2/AEI-
2/30471-76/ 14-15
13.01.2015
CEIG/ACEI/EI-2/AEI-
2/RNG-66 G/30413-18/ 13.01.2015
14-15
CEIG/ACEI/EI-2/AEI-
4/30525-30/ 14-15
13.01.2015
CEIG/ACEI/EI-2/AEI-
4/30519-24/ 14-15
13.01.2015
CEIG/ACEI/EI-2/AEI-
4/30513-18/ 14-15
13.01.2015
CEIG/ACEI/EI-2/AEI-
4/BS-683 A/31200-05/ 21.01.2015
14-15
CEIG/ACEI/EI-2/AEI-
4/31282-87/ 14-15
21.01.2015
CEIG/ACEI/EI-2/AEI-
2/BS-688/29618-22/ 14- 07.01.2015
15
CEIG/ACEI/EI-2/AEI-
2/30686-90/ 14-15
14.01.2015
CEIG/ACEI/EI-2/AEI-
2/BS-716/30721-26/ 14- 14.01.2015
15
CEIG/ACEI/EI-2/AEI-
2/30963-68/ 14-15
19.01.2015
CEIG/ACEI/EI-2/AEI-
2/31031-35/ 14-15
19.01.2015
CEIG/ACEI/EI-2/AEI-
2/31356-61/ 14-15
22.01.2015
CEIG/ACEI/EI-2/AEI-
2/31365-69/ 14-15
22.01.2015
CEIG/ACEI/EI-2/AEI-
2/31517-22/ 14-15
22.01.2015
CEIG/ACEI/EI-2/AEI-
2/BS-788/31551-56/ 14- 27.01.2015
15
CEIG/ACEI/EI-2/AEI-
2/31920-25/ 14-15
29.01.2015
CEIG/ACEI/EI-2/AEI-
4/MNG-796/32077-81/ 29.01.2015
14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-340/32072-76/ 29.01.2015
14-15
CEIG/ACEI/EI-2/AEI-
2/BS-803/31608-13/ 14- 27.01.2015
15
CEIG/ACEI/EI-2/AEI-
2/RNG-145 D/31564- 27.01.2015
69/ 14-15
CEIG/ACEI/EI-2/AEI-
03.02.2015
4/32725-30/14-15
CEIG/ACEI/EI-2/AEI-
4/MYS-324 A/32326- 02.02.2015
31/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-714E/32429- 03.02.2015
34/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-714 D/32435- 03.02.2015
40/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-184 L/33392- 06.02.2015
97/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-816/33463-68/14- 06.02.2015
15
CEIG/ACEI/EI-2/AEI-
4/MNG-714 F/33095- 05.02.2015
100/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-800/33366-71/14- 06.02.2015
15
CEIG/ACEI/EI-2/AEI-
4/BS-184 M/33649- 07.02.2015
53/14-15
CEIG/ACEI/EI-2/AEI-
06.02.2015
2/33536-40/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-823 A/33710- 09.02.2015
15/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-824A/33704- 09.02.2015
09/14-15
CEIG/ACEI/EI-2/AEI-
09.02.2015
2/33682-87/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-613/33688-93/14- 09.02.2015
15
CEIG/ACEI/EI-2/AEI-
10.02.2015
2/33919-24/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-763 A/33751- 09.02.2015
55/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-824/34069-74/14- 12.02.2015
15
CEIG/ACEI/EI-2/AEI-
2/TKR-747 B/34098- 12.02.2015
104/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-823/34075-80/14- 12.02.2015
15
CEIG/ACEI/EI-2/AEI-
13.02.2015
2/34275-82/14-15
CEIG/ACEI/EI-2/AEI-
13.02.2015
2/34181-86/14-15
CEIG/ACEI/EI-2/AEI-
2/UDP-501 S/34112- 12.02.2015
17/14-15
CEIG/ACEI/EI-2/AEI-
13.02.2015
2/34203-08/14-15
CEIG/ACEI/EI-2/AEI-
18.02.2015
2/34764-69/14-15
CEIG/ACEI/EI-2/AEI-
20.02.2015
2/35121-26/14-15
CEIG/ACEI/EI-2/AEI-
20.02.2015
2/35127-32/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-784 I/35468- 24.02.2015
72/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-812/35440-45/14- 23.02.2015
15
CEIG/ACEI/EI-2/AEI-
4/MYS-786 A/35193- 21.02.2015
98/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-822/34778-83/14- 18.02.2015
15
CEIG/ACEI/EI-2/AEI-
2/BS-822 A/34772- 18.02.2015
77/14-15
CEIG/ACEI/EI-2/AEI-
4/MYS-786/35187- 21.02.2015
92/14-15
CEIG/ACEI/EI-2/AEI-
25.02.2015
4/35775-80/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-810/35769- 25.02.2015
74/14-15
CEIG/ACEI/EI-2/AEI-
25.02.2015
4/35763-68/14-15
CEIG/ACEI/EI-2/AEI-
25.02.2015
4/35750-54/14-15
CEIG/ACEI/EI-2/AEI-
27.02.2015
4/35909-13/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-811/35935-40/14- 27.02.2015
15
CEIG/ACEI/EI-2/AEI-
2/BS-817 A/35916- 27.02.2015
21/14-15
CEIG/ACEI/EI-2/AEI-
05.03.2015
4/36413-17/14-15
CEIG/ACEI/EI-2/AEI-
05.03.2015
4/36426-31/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-609/36704-08/14- 07.03.2015
15
CEIG/ACEI/EI-2/AEI-
07.03.2015
4/36596-601/14-15
CEIG/ACEI/EI-2/AEI-
09.03.2015
2/36769-74/14-15
CEIG/ACEI/EI-2/AEI-
10.03.2015
2/36819-23/14-15
CEIG/ACEI/EI-2/AEI-
11.03.2015
2/36949-53/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-724/37210-14/14- 12.03.2015
15
CEIG/ACEI/EI-2/AEI-
17.03.2015
2/37497-502/14-15
CEIG/ACEI/EI-2/AEI-
4/MNG-815/37707- 19.03.2015
12/14-15
CEIG/ACEI/EI-2/AEI-
20.03.2015
2/37747-52/14-15
CEIG/ACEI/EI-2/AEI-
20.03.2015
2/37733-38/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-815/38067-72/14- 23.03.2015
15
CEIG/ACEI/EI-2/AEI-
24.03.2015
4/38248-52/14-15
CEIG/ACEI/EI-2/AEI-
25.03.2015
4/38324-28/14-15
CEIG/ACEI/EI-2/AEI-
25.03.2015
2/38253-57/14-15
CEIG/ACEI/EI-2/AEI-
25.03.2015
2/38318-22/14-15
CEIG/ACEI/EI-2/AEI-
27.03.2015
4/38500-05/14-15
CEIG/ACEI/EI-2/AEI-
2/BS-143 D/38468- 26.03.2015
72/14-15
CEIG/ACEI/EI-2/AEI-
26.03.2015
4/38372-77/14-15
CEIG/ACEI/EI-2/AEI-
30.03.2015
4/38819-23/14-15
0