You are on page 1of 1

THE FIELD SURVEY PARTY

The following is a list of person who may compose a field survey party. Their duties
and responsibilities are given opposite their respective designotions. The given
composition is primarily designed for large scale surveys which is expected to the
undertake field surveys covering days or weeks using either conventional or
sophisticated surveying instruments such as those for surveys using electronic, enertial,
and positioning systems. In coming up with an organization for a field surveys party, the
principle of flexibility must be adapted. The duties and responsibility of member of a
survey party should not always be fixed but should be modified so as to suit prevailing
work requirements and conditions, problems in field operations, and the availability and
useg of surveying equipment. Hence, for smaller scale surveys and where conventional
surveying equipment are utilized, the given composition should be reduced to what is
deemed preferable or suitable. The composition, duties and responsibilities given in this
list should serve as a referencefor one who intends to organize a field survey party.

You might also like