Laporan Penyelidikan Tanah PT PPLI
Laporan Penyelidikan Tanah PT PPLI
GMS
KATA PENGANTAR
CV Geotek Multi Services (CV GMS) colaborate with Soil Mechanics Laboratory of Civil
Engineering Programme Study, Engineering Faculty under the coordination as Laboratory
tests has been requested by PT Prasadha Pamunah Limbah Industri. (PT PPLI ) to conduct
field investigation works on the location of Extend Cladding Wall (Perluasan Warehouse).
The location is at CMTF ARAK, Duri Regency, Riau Province, Indonesia. Due to this, a
highly qualified team on field investigation works has been established to perform all
activities which are specified for the works. Several reports on this works have been
delivered. This concept final report is a continuation of the previous preliminary report.
Upon further detailed evaluations and revisions, the report will be delivered as Final
Report of the works contract.
In general, this concept final report consists of several brief descriptions on identification
and scope of works. In addition to that, data from field tests results is presented although
some data may not be fully complete yet. Furthermore, some engineering analyses of the
obtained data to predict several geotechnical characteristics of the site are also explained in
this report. This report may also be considered as a draft final report of the field
investigation works.
We appreciate the opportunity for providing our service and we would like acknowledge
all parties, which have given the support for the successful completion of the field
investigation works.
i
DAFTAR ISI
KATA PENGANTAR..........................................................................................................................................i
DAFTAR ISI.......................................................................................................................................................ii
DAFTAR TABEL..............................................................................................................................................iv
DAFTAR GAMBAR...........................................................................................................................................v
BAB I PENDAHULUAN...................................................................................................................................1
1.1 Latar Belakang...................................................................................................................................1
1.2 Tujuan dan Lingkup Pekerjaan..........................................................................................................2
1.3 Lokasi Pekerjaan................................................................................................................................3
BAB II LANDASAN TEORI.............................................................................................................................4
2.1 Standard Penetration Test (SPT)........................................................................................................4
2.2 Fondasi Telapak.................................................................................................................................6
2.3 Fondasi Dalam...................................................................................................................................8
2.3.1 Kapasitas Daya Dukung Axial Tekan...........................................................................................8
2.3.2 Kapasitas Daya Dukung Aksial Tarik.........................................................................................10
2.4 Penurunan Fondasi...........................................................................................................................11
2.4.1 Penurunan Segera........................................................................................................................11
2.4.2 Penurunan Konsolidasi................................................................................................................14
2.5 Jarak Tiang......................................................................................................................................16
2.6 Potensi kembang susut tanah (swelling soil)...................................................................................16
BAB III PELAKSANAAN PENYELIDIKAN TANAH..................................................................................18
3.1 Pekerjaan di Lapangan.....................................................................................................................18
3.1.1 Pekerjaan Bor Dalam...................................................................................................................18
3.1.2 Standard Penetration Test (SPT).................................................................................................18
3.1.3 Sampling......................................................................................................................................19
3.2 Pekerjaan di Laboratorium...............................................................................................................19
BAB IV HASIL PENGUJIAN..........................................................................................................................21
4.1 Hasil uji lapangan............................................................................................................................21
4.2.1 Uji Standard Penetration Test (SPT)...........................................................................................21
4.2 Uji Laboratorium.............................................................................................................................23
4.2.1 Sifat Fisis Sampel Tanah.............................................................................................................23
4.2.2 Sifat Teknis Sampel Tanah..........................................................................................................27
BAB V ANALISA DAN REKOMENDASI.....................................................................................................30
5.1 Kondisi Umum.................................................................................................................................30
5.2 Stratigrafi Tanah..............................................................................................................................32
5.3 Kapasitas Fondasi Telapak..............................................................................................................33
5.4 Kapasitas Daya Dukung Axial Tekan Fondasi Dalam....................................................................35
5.5 Penurunan........................................................................................................................................39
5.6 Potensi Kembang-Susut (swelling soils)..........................................................................................40
ii
BAB VI PENUTUP...........................................................................................................................................41
DAFTAR PUSTAKA........................................................................................................................................42
iii
DAFTAR TABEL
Gambar 2. 1 Nilai A1 dan A2 untuk penurunan segera (Christian dan Carrier, 1978).............12
Gambar 2. 2 Penurunan Tiang Group (Navfac, 1986)......................................................................................16
Gambar 2. 3 Klasifikasi Potensi Swelling Tanah..............................................................................................17
BAB I
PENDAHULUAN
Oleh sebab itu penyelidikan tanah diperlukan dalam perencanaan fondasi suatu
struktur bangunan. Hasil penyelidikan tanah dapat menampilkan sifat fisis maupun sifat
teknis tanah. Kedua sifat ini diperlukan untuk mengetahui perilaku tanah dalam menerima
beban struktur.
Pekerjaan penyelidikan ini dibagi menjadi dua tahap, yaitu tahap pekerjaan lapangan
dan tahap pekerjaan di laboratorium. Tahap pekerjaan lapangan dimulai 28 oktober 2023
dan dapat diselesaikan pada tanggal 05 november 2023. Tahap selanjutnya adalah
pekerjaan laboratorium.
Laporan hasil penyelidikan tanah berisi informasi mengenai sifat-sifat tanah dan
analisa fondasi. Pembuatan laporan dilakukan setelah tahap pekerjaan laboratorium selesai
dilaksanakan.
.
1.2 Tujuan dan Lingkup Pekerjaan
Tujuan dari pada penyelidikan tanah adalah :
Memberikan informasi tentang sifat fisis tanah yang dapat digunakan sebagai
acuan pada penentuan bentuk perbaikan sifat tanah (soil improvement).
Memberikan informasi sifat teknis tanah, dalam hal ini kuat geser tanah (shear
strength soil) yang dapat digunakan sebagai acuan pada penentuan tipe fondasi
dan prakiraan kapasitas daya dukung fondasi serta besar penurunannya.
Memberikan informasi pada perencana tentang kemungkinan –kemungkinan yang
akan terjadi apabila segala keputusan telah diambil, disamping itu juga
memberikan informasi bagaimana mengantisipasi segala macam permasalahan
yang akan muncul di lapangan.
Adapun kegiatan yang dilakukan antara lain ini meliputi :
A. Pekerjaan Lapangan
BAB II
LANDASAN TEORI
2.1 Standard Penetration Test (SPT)
Salah satu pengujian lapangan yang paling umum dilakukan adalah SPT. Uji SPT
sudah lama dikembangkan dalam Teknik Fondasi, sehingga perumusan perhitungan
kapasitas daya dukung fondasi didasarkan data SPT telah dikenal oleh ahli Teknik Sipil.
Nilai SPT adalah jumlah pukulan pada tabung split barrel panjang 45 cm, dimana tabung
split barrel tersebut dibagi menjadi 3 bagian, masing-masing mempunyai panjang 15 cm.
Jumlah pukulan tersebut dinotasikan sebagai N 1, N2 dan N3. Nilai SPT, dinotasikan sebagai
N, merupakan jumlah N2 dan N3, sedangkan nilai N1 tidak diperhitungkan, jadi N = N2 +
N3.
Sesuai dengan prosedur perhitungan daya dukung fondasi dalam, hasil uji SPT yang
diperoleh dari lapangan harus dilakukan koreksi. Terdapat dua jenis koreksi, yaitu koreksi
terhadap pelaksanaan pengujian dan koreksi terhadap pengaruh kedalaman (tegangan
overburden). Skempton (1986) telah mengembangkan cara melakukan koreksi terhadap
nilai SPT sebagai berikut :
nilai SPT yang diperoleh dari uji lapangan, maka perlu dilakukan koreksi pelaksanaan
pengujian dengan mengambil acuan efisiensi 60%.
N '60 = CN N 60
…………………………………………………….………… 2-2
Perumusan koreksi kedalaman, CN disesuaikan dengan jenis tanah dan tipe konsolidasi,
seperti ditampilkan pada tabel di bawah ini.
Tabel 2. 1 Faktor Koreksi kedalaman
Jenis tanah dan tipe konsolidasi Perumusan CN
Pasir halus normal konsolidasi 2
CN =
σ'V
1+
σr
Pasir kasar normal konsolidasi 3
CN =
σ'V
2+
σr
Pasir overkonsolidasi 1. 7
CN =
σ' V
0. 7+
σr
dimana :
N’60 = Nilai SPT yang telah dilakukan koreksi pelaksanaan dan tegangan overburden.
σr = reference stress = 100 kPa.
σ’v = tegangan overburden efektif.
N60 = Nilai SPT yang telah dilakukan koreksi pelaksanaan
dan
( ) (
2
) …………………………………….……….
N 55 B+F 3 D
qa = 1 + 0. 33
F2 B B 2-7
Dimana:
D = kedalaman fondasi, meter
B = lebar fondasi, meter
N55 = nilai SPT untuk tingkat efisiensi 60%.
qa = daya dukung ijin, kPa, untuk penurunan sebesar 25,4mm.
Tabel 2. 2 Faktor F
N60
SI Fps
F1 0.05 2.5
F2 0.08 4
F3 0.3 1
F4 1.2 4
(sumber: Bowles, 1996)
Persamaan 2-6 digunakan apabila nilai B ≤ F4, sedangkan Persamaan 2-7 digunakan
apabila nilai B > F4. Nilai parameter F tergantung pada data SPT yang digunakan, seperti
tampak pada tabel di bawah ini. Hasil perhitungan fondasi telapak disajikan pada Tabel
5.1 dan Tabel 5.2.
Lb
q e= 0 . 40 N' 60 σr ≤ 4 . 0 N' 60 σr
B
….……........................………………… 2-13
Lb
q e= 0 . 40 N' 60 σr ≤ 3 .0 N' 60 σ r
B
…………………….…............................. 2-14
q e= C N'60 (MN/m2)
………………………………………………………… 2-15
Dimana nilai C = 0,20 dan N adalah nilai SPT pada ujung tiang
Metode Briaud et al (1985)
Briaud et al (1985) mengusulkan perumusan untuk menghitung kekuatan ujung tiang yang
didasarkan pada data SPT. Perumusan tersebut dapat dituliskan sebagai berikut:
q e=19 . 7σ r ( N 60 )0 . 36
....................................................................................... 2-16
Ppu = A p qe
………………………….……................................………….. 2-17
σr
fs = N 60
50
…………………………….…………..………………..………… 2-18
σr
fs = N
100 60
…................................………………………….……………… 2-19
f s =0 .224 σ r ( N 60 )0 .29
...................................................................................... 2-20
Psu = A s f s
…………………………….…………..............................……….… 2-21
Dimana :
qe = kekuatan ujung tiang, kN/m2
fs = tahanan satuan skin friction, kN/m2
N’60 = Nilai rerata SPT terkoreksi cara pengujian dan tegangan overburden, dihitung 2B
dibawah ujung tiang sampai 1B di atas ujung tiang.
N60 = Nilai rerata SPT hanya terkoreksi cara pengujian
B = lebar/diameter fondasi, meter
Lb = panjang penanaman fondasi
σr = tegangan referensi, ditentukan sebesar 100 kPa.
Ap = luas penampang pile
qe = satuan kapasitas ujung tiang, kN/m2.
Ppu = Kapasitas daya dukung ujung tiang, kN atau ton
As = luas selimut tiang
Pus = Kapasitas daya dukung gesekan (skin friction), kN atau ton
Hasil prakiraan kapasitas daya dukung fondasi menunjukkan bahwa kapasitas daya
dukung makin besar sesuai dengan kedalaman tiang, diambil factor keamanan FK = 3.00.
Hasil perhitungan dilihat pada Tabel 5.3 dan Tabel 5.4.
Pu P
Pijin = = su
SF SF
....……………………….………….…………….……….. 2-22
dimana :
Pijin = Kapasitas ijin aksial tarik
Psu = Kapasitas batas aksial tekan, yang disumbangkan dari kekuatan lekatan (skin
friction)
SF = factor keamanan
Hasil perhitungan kapasitas daya dukung ijin tarik dapat dilihat pada Tabel 5.5 dan Tabel
5.6, dalam perhitungan kapasitas daya dukung ijin tarik ini diambil faktor keamanan, SF =
3.00.
q0 B
Se = A 1 A 2
Es
…………………………………………………………… 2-23
dimana :
Se = penurunan segera (elastic settlement)
q0 = daya dukung netto
B = lebar fondasi
A1, A2 =faktor pengaruh, lihat pada Gambar 2.2.
Es = modulus Young
Gambar 2. 1 Nilai A1 dan A2 untuk penurunan segera (Christian dan Carrier, 1978)
Moulus Young dapat ditentukan dengan uji konsolidasi. Pada tanah lempung dapat
ditentukan dengan parameter koefisien volume of compressibility, mv, dimana dirumuskan
sebagai:
( )
1 eo − e1
mv =
1+eo σ 1 '− σ o '
.................................................................................. 2-24
dimana :
σ’1, σ’o = tegangan efektif
e0, e1 = masing-masing angka pori awal dan akhir pembebanan
Modulus Young, Es, dapat dirumuskan sebagai berikut:
1
Es =
mv
.................................................................................................... 2-25
Sedangkan, Modulus Young dapat ditentukan dengan uji Triaxial, dengan perumusan
sebagai berikut:
( 1− μ ) Es,t r
Es =
( 1+ μ ) ( 1− 2μ )
........................................................................................ 2-26
Modulus Young dapat juga ditentukan melalui uji lapangan, seperti ditampikan pada Tabel
2.3.
Tabel 2. 3 Persamaan Modulus Es pada beberapa pengujian (Sumber: Bowles, 1997)
Perhitungan penurunan segera pada fondasi pile, dapat digunakan perumusan empiris
Meyerhof (1976), perumusan empiris tersebut untuk menentukan penurunan pile group
didasarkan pada nilai qonus, yaitu:
q 'e I B g
δ =
2 qc
……………………………………………….………………... 2-27
zi
I = 1 − ≥ 0.5
8Bg
………………………..……………………….……..... 2-28
dimana :
δ = penurunan pile group
Pg
q’e = equivalent net bearing pressure = B g x Lg
Pg = beban yang bekerja pada pile group
Bg = lebar pile group = lebar imaginary footing
Lg = panjang pile group = panjang imaginary footing
σr = reference stress = 100 kPa
qc = Nilai qonus pada kedalaman zi sampai zi + Bg
zi = kedalaman imaginary footing
Untuk friction pile, letak imaginary footing ditentukan pada kedalaman 2/3
panjang penanaman pile, pada end bearing pile, letaknya pada ujung tiang.
Untuk tipe pile campuran (friction dan end bearing pile) letak imaginary
footing diantara 2/3 panjang penanaman dan ujung tiang, lihat Gambar 2.3.
δ c=
H
1+e 0
Cc log
(
σ 'o +Δσ
σ 'o ) ............................................................ 2-27
b. Penurunan Over Konsolidasi
δ c=
H
1+e 0
σ 'p
Cr log ' +
H
( )
σ o 1+e 0
Cc log
σ 'p +Δσ
σ 'o ( ) ............................ 2-28
Dimana:
H = tebal lapisan tanah
Cc = koefisien konsolidasi
Cr = koefisien kompresi
eo = angka pori awal
σ’o = tegangan overburden efektif
σ’p = tegangan overkonsolidasi
Δσ = penambahan tegangan tanah akibat beban
Namun pada lempung dengan konsistensi menengah sampai keras (medium to hard clay),
qu > 75 kPa, penurunan konsolidasi relatif kecil sehingga bisa diabaikan. Bowles (1996)
menyatakan terdapat korelasi antara qu terhadap N70, yaitu
q u =kN70
.................................................................................................... 2-29
Nilai k diambil 12, maka apabila dikonversikan terhadap nilai SPT diperoleh nilai SPT, N 70
≈ 6 untuk qu = 75 kPa.
potensi swelling diklasifikasikan menjadi empat kategori, seperti ditampilkan pada Tabel
2.3. Potensi swelling pada suatu tanah oleh Seed dkk (1962) dirumuskan sebagai:
S=2. 16 x 10−3 ( PI )2 . 44
………………….……….….………………………….. 2-30
Dimana :
S = potensial swelling
PI = Index plastisitas
Tabel 2. 4 Klasifikasi potensi swelling
BAB III
PELAKSANAAN PENYELIDIKAN TANAH
ini sesuai dengan jumlah pukulan per 300 mm penetrasi split spoon sampler. Standard
Penetration Test dilakukan pada setiap kedalaman dengan interval 2.00 meter sampai
mencapai kedalaman rencana, yaitu bacaan SPT >50 3x berturut-turut.
3.1.3 Sampling
Sampel tak terganggu diambil pada tanah cohesive dengan interval pengambilan,
biasanya setiap kedalaman 5.00 meter. Pengambilan sampel jenis tersebut digunakan
tabung dengan diameter 76 mm, yang biasa disebut dengan Shelby tube.
Tabung tersebut dipertajam pada ujung bawahnya dan ujung atasnya dihubungkan
dengan rod bor dan ditekan secara hidrolis ke dalam dasar lubang bor. Apabila
diperkirakan tabung telah penuh maka selanjutnya tabung ditarik ke atas dan diberi lapisan
paraffin cair pada kedua ujung tabung kemudian segera dikirim ke Laboratorium Mekanika
Tanah untuk dilakukan pengujian.
BAB IV
HASIL PENGUJIAN
4.1 Hasil uji lapangan
4.2.1 Uji Standard Penetration Test (SPT)
Hasil pengujian SPT di lapangan dibuat korelasi antara nilai SPT N60 terhadap
kedalaman. Seperti ditampilkan pada Gambar 4.1.
N-SPT
N_60
5 (N1)_60
10
Depth (m)
15
20
25
30
35
(a) BH-01
N-SPT
N_60
5 (N1)_60
10
Depth (m)
15
20
25
30
35
(b) BH-02
Sesuai Gambar 4.1 secara umum menunjukkan bahwa kedalaman -0.00 – -0.30 meter
merupakan tanah urugan mengandung pasir, kerikil, dan adukan semen (earthfill), dengan
ketebalan 0.30 m. Kedalaman lapisan berikutnya berupa tanah lanau dan/atau tanah
lempung kepasiran dengan ketebalan 5.00-6.00 m, merupakan tanah berbutir halus (soft
clay) bercampur dengan pasir. Lapisan ketiga berupa tanah lempung mulai kedalaman 6.00
sampai dengan 25.00 m untuk BH-01 dan BH-02 bercampur dengan butiran pasir dengan
konsistensi firm to hard clay. Pada titik BH-01 dan BH-02 ada kedalaman 25.00 m sampai
dengan akhir penyelidikan (31,00 m sampai kedalaman akhir boring) berupa pasir dengan
konsistensi padat sampai sangat padat (dense to very dense sand). Kedalaman tanah keras
(nilai N-SPT >50)mulai pada kedalaman 24.00 m pada BH-01, 30.00 m ditemukan pada
titik BH-02. Kedalaman tanah dengan daya dukung baik (keras) mulai pada kedalaman
20.00m, untuk BH-01 sementara pada BH-02 nilai N-SPT meningkat drastis mulai
kedalaman 18.00 m (N-SPT=60) dan meningkat lagi pafa kedalaman 40.00 m (N-
SPT=60). Jadi dapat ditarik kesimpulan bahwa terdapat lapisan tanah yang keras dengan
ketebalan yang cukup dengan pembacaan SPT , N-SPT >60 tiga kali berturut turut.
Stratigrafi tanah dapat dilihat pada Lampiran 1.
Sand
Silt
40
30
20
10
0
2 4 6 8 10 12 14 16 18 20 22
Kedalaman
Sesuai Gambar 4.2 menunjukkan bahwa tanah berbutir halus (lempung dan/atau
lanau) sangat mendominasi sampel tanah pada lokasi BH-1 dan BH-02 sampai kedalaman
pengambilan sampel UDS (kedalaman 20.00), kecuali pada pada kedalaman 10 – 12.00
meter pada BH-01, dimana jenis tanah adalah berbutir kasar (pasir). Sementara pada BH-
02, sampai kedalaman sampai 20.00 m semua jenis tanah di dominasi oleh tanah butiran
halus (lanau dan lempung). Sesuai klasifikasi tanah USCS, perbedaan tanah butiran kasar
dan butiran halus (lanau dan lempung) bisa menggunakan saringan no 200 (#200).
Perbedaan ukuran butiran lanau dan lempung dapat ditentukan melalui nilai Batas Cair
(Liquid Limit) dan Indeks Plastisitas sampel tanah tersebut. Nilai Batas Cair dan Indek
Plastisitas tanah sampel disajikan pada Gambar 4.3.
Menurut Gambar 4.3 (a) menunjukkan bahwa nilai Batas Cair > 50% sampai pada
kedalaman pengambilan sampel 20,00 meter tidak ditemukan pada BH-01 dan BH-02
sehingga dapat disimpulkan bahwa kandungan tanah non plastis dan plastisitas rendah
lebih mendominasi sampel tanah. Untuk menentukan apakah sampel kandungan tanah
lempung dan tanah lanau perlu ditinjau nilai Indeks Plastisitas terhadap garis A (A-lines)
pada Bagan Plastisitas (Plasticity Chart). Sesuai Gambar 4.3 (b) terlihat bahwa titik
kedalaman 2,50 m-23,50 m pada BH-01 sampai dengan BH-02 cenderung kandungan
tanah lempung lebih mendominasi, sedangkan pada kedalaman >24,00 cenderung
kandungan tanah berbutir kasar mendominasi pada kedalaman tersebut.
a) BH-01 b) BH-02
Gambar 4. 3 Nilai Batas Cair (LL) dan Indeks Plastisitas (IP) sampel tanah
Menurut Gambar 4.4, secara umum menunjukkan bahwa kadar air tanah asli, w,
makin berkurang sampai kedalaman -15,00 pada BH-01. Hal ini disebabkan sampai
kedalaman -18,00 meter, kandungan butiran halus semakim bertambah. Hal ini juga sesuai
dengan angka pori, dimana makin dalam lapisan tanah, angka pori cenderung makin besar.
Sebaliknya pada BH-02 kadar air tanah cenderung semakin besar karena kandungan pasir
semakin besar. Telah diketahui bahwa angka pori berpengaruh terhadap tingkat
pemampatan tanah. Semakin tinggi angka pori, tingkat pemampatan makin besar.
Sesuai Gambar 4.3 (a) dan Gambar 4.4 (a) pada tanah kelempungan, terlihat bahwa
kadar air asli, w, lebih rendah dibandingkan kadar air Batas Cair (LL). Hal ini
menunjukkan bahwa tanah dalam kondisi plastic, tingkat konsistensi lunak sampai kaku
(soft to stiff clays soil). Selain itu, juga terlihat pada BH-01 dan BH-02 bahwa terdapat
kecenderungan kedalaman tanah makin besar, kadar air makin berkurang.
Klasifikasi potensi kembang susut (swelling soils) ditentukan dengan cara Seed et al
(1962), seperti ditampilkan pada Tabel 2.3. Hasil perhitungan nilai potensial swelling, S,
pada sampel disajikan pada Gambar 4.5. Mengacu pada Tabel 2.3 menunjukkan bahwa
terdapat potensi swelling yang relatif tinggi, yaitu pada kedalaman 10.00 – 15.00 meter.
Namun potensi kembang susut tersebut tidak terlalu dikawatirkan, karena posisi lapisan
tanah tersebut jauh di dalam tanah, sehingga selalu dalam posisi terendam air, tidak ada
perbedaan kadar air. Tanah kembang susut akan terlihat potensinya apabila terdapat
perbedaan kadar air.
Hasil uji konsolidasi menunjukkan rentang nilai Koefisien Pemampatan, Cc antara 0,05 –
0,30 pada BH-01 dan BH-02. Pada kedalaman -15.00 nilai Cc adalah terbesar yaitu
berkisar 0,20 untuk BH-01 dan 0,30 pada BH-02. Secara umum nilai Koefisien
Pemampatan makin bertambah sesuai dengan kedalaman sampel. Nilai Koefisien
Pemampatan dapat dilihat pada Gambar 4.7.
Data uji laboratorium secara lengkap dapat dilihat pada Lampiran 4.
BH-02
SC/CL 2.68 19.50 19.30 53.82 21.90 24.28 27.86 21.26 6.60 9.94 16.04 0.626 0.1138
ML 2.66 32.36 18.25 26.24 41.81 31.95 33.47 24.61 8.85 7.77 13.53 0.890 0.2122
CL 2.75 30.25 19.16 42.18 31.93 25.89 29.93 20.75 9.18 15.44 3.16 0.834 0.1649
SC 2.67 19.14 20.37 79.98 6.13 13.89 - - - 0.70 22.61 0.351 0.0359
BAB V
ANALISA DAN REKOMENDASI
Pengertian kapasitas fondasi telapak adalah kapasitas daya dukung lapisan tanah
permukaan. Daya dukung tanah didasarkan data hasil pengujian Laboratorium dan Uji
Standard Penetration Test (Uji SPT). Pada data uji laboratorium didasarkan pada sampel
kedalaman 4.00 meter, sedangkan pada uji N-SPT didasarkan nilai rata-rata SPT pada
kedalaman 0.00 – 4.00 meter. Hasil perhitungan kapasitas daya dukung tanah didasarkan
data uji laboratorium disajikan pada Tabel 5.1. Sedangkan kapasitas daya dukung tanah
didasarkan data SPT ditampilkan pada Tabel 5.2. Kapasitas daya dukung fondasi dangkal
hanya dipakai untuk bangunan yang ringan saja seperti pagar, perkerasan jalan akses dan
bangunan sejenis. Untuk bangunan utama, kapasitas daya dukung fondasi dangkal tidak
disarankan.
Tabel 5. 1 Kapasitas daya dukung tanah ijin (kPa) didasarkan data uji laboratorium
(Meyerhof)
SPT CPT
Width (m) Depth (m)
BH-01 BH-02 CPT-1 CPT-2 CPT-3 CPT-4
1.00 2.00 199 134 227 214 210 250
Catatan :
Harga ditentukan dari sampel kedalaman 3.00 meter. Diambil nilai FK = 3,00
Tabel 5. 2 Kapasitas daya dukung fondasi telapak (kN/m2) didasarkan data lapangan
(sondir dan boring)
De Mello,
Schmertmann & 105 135 - - - -
Mayne
Meyerhof 100 199 50 53 52 77
Bowles 257,9 332,8 168 173 172 214
Hatanaka&Uchi 107,4
126,8 - - - -
da
De Mello,
B=1.50 m Schmertmann & 145 185,2 - - - -
Mayne
Meyerhof 116 233 43 46 45 67
Bowles 194 175,3 168 173 172 214
Hatanaka&Uchi
143,2 169,1 - - - -
da
De Mello,
B=2.00 m Schmertmann & 178,7 227,3 - - - -
Mayne
Meyerhof 132 264 39 42 41 61
Bowles 158,7 204,9 168 173 172 214
Hatanaka&Uchi
179 211,3 - - - -
da
De Mello,
B=2.50 m Schmertmann & 207,7 363,2 - - - -
Mayne
Meyerhof 149 297 37 40 40 58
Bowles 135,8 175,3 168 173 172 214
Catatan :
Harga N-SPT diambil rata-rata qonus pada kedalaman 0.00 – 4.00 meter
Kapasitas daya dukung fondasi dalam disajikan dalam dua versi yaitu didasarkan pada data
sondir dan didasarkan pada data SPT. Kedua perhitungan tersebut menghasilkan kapasitas
daya dukung yang berbeda. Perumusan daya dukung didasarkan data SPT sesuai untuk
digunakan pada tanah pasir dan lanau. Hasil perhitungan daya dukung fondasi tiang
(driven pile) disajikan pada Tabel 5.3 dan Tabel 5.4.
Tabel 5. 3 Kapasitas daya dukung ijin axial fondasi dalam (Driven Pile Foundation),
didasarkan pada data SPT
Catatan : FK = 3.00.
Satuan dalam ton
Daya dukung fondasi tiang untuk BH-02 hanya bisa diperkiraan sampai kedalaman 30.00
m
Tabel 5. 4 Kapasitas daya dukung ijin axial fondasi dalam (Driven Pile Foundation),
didasarkan pada data SPT
Catatan: FK = 3.00.
Satuan dalam ton
Kapasitas daya dukung fondasi dalam didasarkan data SPT ditampilkan dalam
bentuk grafik, seperti pada Gambar 5.2.
Hasil perhitungan daya dukung fondasi tiang axial tekan dengan metode Meyerhof
menghasilkan daya dukung yang berbeda untuk daya dukung tarik dan daya dukung tekan.
Pada panjang penanaman, L = 20 meter, kapasitas daya dukung tekan metode Meyerhof
menghasilkan kapasitas daya dukung lebih tinggi dibandingkan dengan daya dukung tarik
metode Meyerhof. Daya dukung tiang aksial pada lokasi boring BH-02 paling kecil
dibandingkan dengan BH-01. Artinya kekuatan tanah/lapisan tanah pada lokasi sekitar
lubang bor BH-02 merupakan lokasi tanah lebih lunak dibandingkan dengan tanah pada
sekitar titik bor BH-01.
Sesuai dengan hasil analisa tersebut di atas, maka disarankan untuk menggunakan
nilai kapasitas daya dukung axial tekan didasarkan pada kekuatan tanah dari data BH-02
dengan metode Meyerhof.
Gambar 5. 2 Hubungan kapasitas daya dukung fondasi tiang didasarkan data SPT BH-01terhadap
panjang penanaman
Gambar 5. 3 Hubungan kapasitas daya dukung fondasi tiang didasarkan data SPT BH-01 terhadap
panjang penanaman
5.5 Penurunan
Pada saat pelaksanaan bor di lapangan menunjukkan bahwa muka air tanah pada
kedalaman11.50– 12.50 meter. Sedangkan salah satu sifat tanah lempung lunak jenuh air
adalah mempunyai potensi besar untuk memampat akibat proses konsolidasi. Oleh sebab
itu dapat dipastikan bahwa penurunan akibat konsolidasi sangat mungkin terjadi.
Penurunan konsolidasi memerlukan waktu relatif lama (long term), tergantung pada jenis
tanah dan beban. Pada lokasi Perluasan Warehouse, proses penurunan konsolidasi akan
memerlukan waktu sekitar 4-5 tahun. Untuk mempercepat proses konsolidasi dapat
dilakukan dengan memasang vertikal drain.
BAB VI
PENUTUP
Demikian rincian laporan penyelidikan tanah pada lokasi rencana Pembangunan Perluasan
Warehouse (Extend Cladding Wall) yang dilaksanakan oleh PT Prasadha Pamunah Limbah
Indonesia (PT PPLI) di lokasi (Central Mud Treating Facility) CMTF ARAK Duri, Riau.
Besar harapan agar pelaksanaan kelak sesuai dengan yang diharapkan dan tidak terjadi
kendala apapun juga. Sukses selalu.
Terima kasih
DAFTAR PUSTAKA
Briaud, J.L. et.al. (1985), Behavior of Piles and Pile Groups in Cohesionless Soils, Report
No. FHWA/RD-83/038, Federal Highway Administration, McLean VA
Briaud, J.L. dan Miran, Jerome. (1991), The Cone Penetration Test, Report No. FHWA –
TA-91-004, Federal Highway Administration, Washington DC.
Burland, J.B., Burbidge, M.C. (1984), Settlement of foundations on sand and gravel,
Proceedings of the Institution of Civil Engineers, Part 1, 1985, 78, Dec., 1325-1381
Coduto, Donald. (1994), Foundation Design, Prentice Hall, Englewood Cliffs, New Jersey.
Hatanaka, M., Uchida, A. (1996). Empirical correlation between penetration resistance
and effective friction of sandy soil. Soils & Foundations, Vol. 36 (4), 1-9, Japanese
Geotechnical Society
Martin, R., et al, Concrete Pile design in Tidewater”, ASCE, J. Geotechnical Engineering.
113, No. 6, 1987.
Mayne, P.W. (2001), Geotechnical site characterization using Cone, piezocone, SPTu, and
VST, Civil and Environmental Engineering Department, Georgia Institute of Technology
Meyerhof, G.G. (1976), Penetration Test and Bearing Capacity of Cohesionless Soils”,
ASCE Journal of the Soil Mechanics and Foundations Division, vol. 82, No. SM1, p.1-19.
Sanglerat G. (1972), The Penetrometer and Soil Exploration; Interpretation of penetration
diagrams-theory and practice, Development in Geotechnical Engineering Vol. 1 Elsivier
Publishing Company Amsterdam.
Schmertmann, J.H. (1975), Measurement of insitu shear strength, keynote lecture,
Proceedings of the conference on in-situ measurement of soil properties, June 1-4, 1975,
vol. II, American Society of Civil Engineers
Schmertmann J.H. (1978), Guidelines for Cone Penetration Test; Performance and
Design, Report FHWA-TS-78-209, Federal Highway Administration, Washington DC.
Seed at. al. (1962), Studies of Swell and Swell Pressure Characteristics of Compacted
Clays”, Bulletin No. 133, Highway Research Board, p.12-39