quoted price shall include for all the necessary items for the
complete and fully functioning of the system.
Ground floor & upper floor Main electrical supply
Upgrade of existing main distribution board at main building
including supply and installation of 32A, 4 pole MCB with all
necessary accessories.
S.2 Main Distribution Board (MDB) at ground floor, wall mounted 1.00 Item
type
Earthing system
S.3 Supply and installation of earth pit including earth 1.00 Item
electrode (Earth rod or plate) and all accessories as per
B.S 6651 standard for earthling to achieve an earth resistance
of less than 10 ohms.
Cables
Supply and installation of 600/1000V main feeder cable in PVC
conduit, XLPE insulated or PVC insulated, PVC sheathed, copper
conductor cable with four core.
Rate to include for supply and installation of cable
terminations at both ends and necessary glands
Note
S.4 Power cable from external power source (Main 50.00 m
Distribution Board of the main building) to MDB of new building:
1 x 4C x 6sqmm Cu/XLPE/SWA/PVC cable including
termination cost at both ends.
Supply all materials and provide final sub circuit point wiring
for the following outlets with PVC conduit, 10A switches
and connectors Including other materials required to make
complete installation as specified and as shown in the electrical
drawings.
S.8 Wiring of wall mounted fan point using 2x1Cx2.5 Sqmm 10.00 nr
Cu/PVC/PVC and 1Cx2.5 sqmm PVC/Cu earth cable in ring
circuit with PVC conduits, 13A switched socket outlet and
fixing accessories at high level.
S.9 Wiring of 13A switched socket outlet using 27.00 nr
2x1Cx2.5Sqmm Cu/PVC/PVC and 1Cx2.5Sqmm Cu/PVC
earth cable in ring circuit with PVC conduits c/w PVC
conduit and fixing accessories.
S.34 Supply and Installation of ESE type lightning protection system to 1.00 Item
cover total building structure with Level 01 protection comply
with NFC 17 102 standards as per the drawings and specifications.
Final document
S.36 Obtain a Chartered Electrical Engineer's Certificate for the 1.00 Item
final testing and commissioning report as per the requirement
Additional Items
The Contractor shall list here and price any Items shown on the
drawings, mentioned in the specifications or required for
the satisfactory completion of this section, but not mentioned
herein. Any such Items not listed below shall be deemed to be
included.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TOOL 1%
TRANSPORT 1%
CONTINGENCY 1%
OH 5%
MU 20%
LKR
Item No Description Qty Rate Amount
Earthing System
Cu Plate 1 32,500.00 32,500.00
Earth pit 1 3,800.00 3,800.00
Cu tape 6 1,400.00 8,400.00
CAD welding 1 4,000.00 4,000.00
Bentronite 1 1,000.00 1,000.00
Clamp 1 1,000.00 1,000.00
Labor 1 12,500.00 12,500.00
Other 1 7,500.00 7,500.00
70,700.00
Tool 707.00
Transport 707.00
Contingency 707.00
OH 3,641.05
MU 15,292.41
To be Quoted 91,760.00
Socket
Fittings Supply
Fittings Installation