PROJECT : SEGAS COMPOUND

DATE: 07/17/2020
PROJECT NO : E0616
REV No: 0
LOCATION :- STAFF BUILDING

SPEC. ITEM
Item Description UNIT QTY RATE AMOUNT
NO.
A LIGHT FIXTURES:-

Supply, install, connect and test light fixtures including all lamps including all
mounting devices and brackets as shown on the drawings, specification and as
scheduled. All light fixtures will be supplied and installed by Contractor .

Light fixtures should be products of :-


- Lanzini.
-3 Brothers.
- Elsweedy ( EGY LUX ) or approved equal.

1 Down light with 100w Lamp No 630 17300

2 Weather proof (IP54) wall mounted oblique with 100w lamp No 8 17300

3 Weather proof (IP54) wall mounted with 100w lamp No 26 17300

4 Chandeliers As Per Architect Design No 60 17300

B LIGHT SWITCHES

Supply, install and connect light switches complete including, conduits, conduit
fittings, switches, terminations, earthing, wiring from switches to branch circuit
according to specifications and as shown on drawings.
Switches should be products of :-
- GEWISS ( PLAYBUS RANGE )
- BTICHINO
- LEGRAND

1 One pole, one way 10A modular switch No 270 17300

2 Water proof two pole, one way 10A modular switch No 60 17300

C SOCKET OUTLETS

Supply, install, connect and test socket outlets complete including conduits,
conduit fittings, wiring, earthing back to panel board or to branch circuit complete
including plaster rings, wiring, earthing, terminations, socket plate, cover, plugs
all necessary accessories and ancillary work according to specification and
schedules.

Sockets should be products of :-


- GEWISS ( PLAYBUS RANGE )
- BTICHINO
- LEGRAND

1 10A Douplex socket No 295 17300

2 10A Water proof (IP 54) Douplex socket No 60 17300

3 10A Water proof (IP 54) Socket outlet No 12 17300

4 10A Switch Socket outlet No 60 17300

5 16A Water proof (IP 54) socket No 60 17300

D SWITCH POWER OUTLET

Supply, install, connect and test switch fuses complete including conduits, conduit
fittings, wiring, earthing back to panel board or to branch circuit complete
including plaster rings, wiring, earthing, terminations, socket plate, cover, plugs
all necessary accessories and ancillary work according to specification and
schedules.
Sockets should be products of :-
- GEWISS ( PLAYBUS RANGE )
- BTICHINO
- LEGRAND

1 16A Two pole Switch fuse NO 60 17300

2 25A Two pole Switch fuse NO 30 17300

3 32A Two pole Switch fuse NO 30 17300

TOTAL

ELECTRICAL WORKS B.O.Q. 1 Of 5


PROJECT : SEGAS COMPOUND
DATE: 07/17/2020
PROJECT NO : E0616
REV No: 0
LOCATION :- STAFF BUILDING

E BRANCH CIRCUITS

Supply, install, connect and test PVC insulated 450/750V stranded copper
conductor wires from branch circuit panelboards to light & power outlets
including raceways, termination, glands and all necessary accessories and
ancillary works required for complete operative system.
Embeded or concealed surface mounted conduits should be rigid PVC. Exposed
mounted conduits should be galvanized steel.
- PVC conduits should be products of MARSHAL TUFFLEX CO. or approved
equal.

1 3x2.5mm² branch circuit for feeding (2) light fixtures No 30 17300

2 3x2.5mm² branch circuit for feeding (4) light fixtures No 6

3 3x2.5mm² branch circuit for feeding (6) light fixtures No 30 17300

4 3x2.5mm² branch circuit for feeding (7) light fixtures No 1 17300

5 3x2.5mm² branch circuit for feeding (8) light fixtures No 1 17300

6 3x2.5mm² branch circuit for feeding (9) light fixtures No 30 17300

7 3x2.5mm² branch circuit for feeding (11) light fixtures No 1 17300

8 3x2.5mm² branch circuit for feeding (15) light fixtures No 3

9 3x2.5mm² branch circuit for feeding (17) light fixtures No 6 17300

10 3x4 mm² copper conductor branch circuit, for feeding 1 No. power Receptacles No 180 17300

11 3x6 mm² copper conductor branch circuit, for feeding 1 No. power Receptacles No 30 17300

12 3x10 mm² copper conductor branch circuit, for feeding 1 No. power Receptacles No 30 17300

13 3x4 mm² copper conductor branch circuit, for feeding 2 No. power Receptacles No 30 17300

14 3x4 mm² copper conductor branch circuit, for feeding 4 No. power Receptacles No 35 17300

15 3x4 mm² copper conductor branch circuit, for feeding 5 No. power Receptacles No 31 17300

16 3x4 mm² copper conductor branch circuit, for feeding 6 No. power Receptacles No 2 17300

Branch Circuit Distribution Panel Boards

Supply, install, connect and test the following panel boards complete with circuit
breakers, bus bars cabinets, conductors relays, residual current devices, indicator
lamps and all necessary accessories and ancillary works required in accordance
with the specification, construction drawings & attached schedules.

Panel boards should be products of :-


- Emg ( Schnieder )
- ARAB (abb)
1 BCP-FLATE No 30 17300

2 BCP-SR No 1 17300

MAIN DISTRIBUTION BOARDS

Supply, install, connect and test main distribution boards with all necessary
accessories circuit breakers, contractors, relays, indicator lamps, cable terminals
& all ancillary works required for complete operative system according to the
specifications & as shown on drawings.

1 SMB No 1 17300

2 SMDB-ST No 1 17300

TOTAL

ELECTRICAL WORKS B.O.Q. 2 Of 5


PROJECT : SEGAS COMPOUND
DATE: 07/17/2020
PROJECT NO : E0616
REV No: 0
LOCATION :- STAFF BUILDING

CABLE FEEDERS

Supply, install, connect and test PVC insulated, PVC sheathed 600/1000V
stranded copper cables from main feeder distribution panelboard to branch circuit
panels & starter panels including raceways, termination, glands and all necessary
accessories and ancillary works required for complete operative system..

power cables shall be products :-


- Elsweedy Co. or approved equal
Supply, install, connect and test
1 Pvc/Pvc condactor [(4x10)mm2 + 10mm2] and all necessary accessories and MT 8 17300
ancillary works required as specified and as shown on drawings.
Supply, install, connect and test

2 Pvc/Pvc condactor [(4x1x10)mm2 + 10mm2] and all necessary accessories and MT 300 17300
ancillary works required as specified and as shown on drawings.

Supply, install, connect and test

3 Pvc/PvC condactor [(4x1x50)mm2 + 25mm2] and all necessary accessories and MT 250 17300
ancillary works required as specified and as shown on drawings.

Supply, install, connect and test

4 Pvc/Pvc condactor [(4x240)mm2 + 120mm2] and all necessary accessories and MT 200 17300
ancillary works required as specified and as shown on drawings.

EARTHING (GROUNDING) SYSTEM

Furnishing, supplying, installing and testing a complete protective earthing (PE)


system complete with earthing pits, earthing electrodes, equalizer bars, earth
1 continuity conductor, and earthing conductor to switchboards, diesel generator set LS LS 17300
and transformers complete with all accessories, fixing brackets, tets links,
complete with all accessories, fixing brackets, tets links suspensions, drilling and
cutting for complete installation all in accordance with technical specifications
and drawings

NB
Earthing impedance must be <= 2 ohm
Grounding system components shall be products :-
- Furse Co. or approved equal

TELECOMMUNICATION SYSTEM

Supply, install, connect and test Telephone System complete including conduits,
conduit fittings,(2x0.6mm) cabling, earthing complete including plaster rings,
wiring, earthing, terminations, socket plate, cover, plugs all necessary accessories
and ancillary work according to specification and Design

Telecommunication system cabling & outlets shall be products of :-


- Avaya Co. or approved equal

Supply, install, connect and test socket RJ-11 telephone outlets complete
including conduits, conduit fittings, (2x0.6mm) cabling, earthling complete
including plaster rings, wiring, earthling, terminations, socket plate, cover, plugs
all necessary accessories and ancillary work according to specification and Design
1 NO 180 17200
Sockets should be products of :-
'legrand
avaya

TOTAL

ELECTRICAL WORKS B.O.Q. 3 Of 5


PROJECT : SEGAS COMPOUND
DATE: 07/17/2020
PROJECT NO : E0616
REV No: 0
LOCATION :- STAFF BUILDING

Supply, install, connect and test of MF frame complete as specified and indicated
2 in the drawings with all necessary termination, conduits, raceways, patch cords, NO 1 17200
cables and all necessary accessories required to complete operative system

Supply, install, connect and test of 10 pair wall mount telephone frames complete
as specified and indicated in the drawings with all necessary termination,
3 NO 30 17200
conduits, raceways, patch cords, cables and all necessary accessories required to
complete operative system

Supply, install, connect and test of 10 pair jelly filled cable complete as specified
4 and indicated in the drawings with all necessary termination, conduits, MT 700 17200
raceways,and all necessary accessories required to complete operative system

T.V & SATELLITE SYSTEM

Supply, install, connect and test central dishes System complete including
conduits, conduit fittings, coaxial cable, distribution amplifiers , splitters ,
earthing complete including wiring, earthing terminations and all necessary
accessories and ancillary work according to specification and Design

Supply, install, connect and test of


1 No 4 17200
Tee splitters one input two output

Supply, install, connect and test of


2 No 5 17200
Tee splitters one input four output

Supply, install, connect and test of


3 No 10 17200
Tee splitters one input six output

Supply, install, connect and test of


4 No 60 17200
T.V outlet

Supply, install, connect and test of

5 complete Coaxial cable network including all necessar cabling, raceways & LS LS 17200
accessories. The item shall be complete with all necessary works according to the
specifications & the tender drwings.

TOTAL

ELECTRICAL WORKS B.O.Q. 4 Of 5


PROJECT : SEGAS COMPOUND
DATE: 07/17/2020
PROJECT NO : E0616
REV No: 0
LOCATION :- STAFF BUILDING

ELECTRICITY WORKS

DIVISION Summary Page

Page 1

Page 2

Page 3

Page 4

TOTAL

ELECTRICAL WORKS B.O.Q. 5 Of 5