#915 - INS-690 [PL]- Inspection installation and pressure test of PPR
pipe embedded for Plumbing System (Cold Water) and Wall opening at 11F. Verified | TCV Engineering | MEP-Sleeve and Opening Created 01-27-2024
Forms MEP: Installation of Sleeve and Opening #60 | Closed | [PL]- Inspection installation and pressure test of PPR pipe embedded for Plumbing System (Cold Water) and Wall opening at 11F.
Task messages (time in ICT)
TCV Engineering SHD-313-00 [MEP]-11TH Floor Pipe Floor Sleeves and Wall Opening.pdf 27 Jan 01:38 PM TCV Engineering Photo 1 27 Jan 04:27 PM TCV Engineering Photo 2 27 Jan 04:27 PM TCV Engineering Photo 3 27 Jan 04:27 PM TCV Engineering Photo 4 27 Jan 04:27 PM TCV Engineering Photo 5 27 Jan 04:27 PM TCV Engineering Photo 6 27 Jan 04:27 PM TCV Engineering Photo 7 27 Jan 04:27 PM TCV Engineering Photo 8 27 Jan 04:27 PM TCV Engineering Photo 9 27 Jan 04:27 PM