MURCIA WATER DISTRICT

Municipality of Murcia
Province of Negros Occidental
Republic of the Philippines
Email add: murciawaterdistrict@gmail.com
Tele/Fax No. (034) 458-8844

PROJECT PROFILE
SUSTAINABLE MANAGEMENT PROJECT
(MAINTENANCE AND PROTECTION (M&P) )
ON EXISTING PLANTATION 20,160 SQ.M.
YEAR 2023

October 16, 2023

IDENTIFYING INFORMATION
Project Title: Sustainable Management Project (Maintenance and
Protection on existing Established Plantation 20,160 sq. m.)
Project Site: Brgy. Amayco, Murcia
Project Objective: This project aims sustainable management of Maintenance
and Protection on the adopted Graduated NGP site
Project Duration: 1 month
Total Project Cost: Php 50,999
Source of Fund: Watershed Structures and Improvement
PROJECT DESCRIPTION
The Murcia Water District will develop the watershed and maintain the adopted NGP site. In
line with this, the MWD will implement a sustainable management plan. The plan is intended to
conduct Maintenance and Protection on the established plantation within the adopted NGP graduated
site.
The activities to be conducted such as underbrushing within the coffee, mirabilis, caliandra, and
Giant bamboo plantation covering of 20,160 sq.m., and application of fertilizer.

Budgetary requirements:
Activities: No./Unit: Cost: Total cost:

Underbrushing 35,280
coffee 9,500 sqm. 1.75 16,625
Mirabilis 4,100sq.m. 1.75 7,175
Caliandra 960sq.m. 1.75 1,680
Giant Bamboo 5,600sq.m 1.75 9,800
Application of fertilizer (vermi- 15,719
compost)
coffee 6,000 sdlgs 1.25 7,500
Mirabilis 4,900 sdlgs 1.25 6,125
Caliandra 275 sdlgs 1.25 343.75
Giant Bamboo 1,400 sdlgs 1.25 1,750
TOTAL: 50,999

For reference and approval.


Prepared by: Reviewed and checked by:

FOR. JOVELYN T. MACOY ENGR. LEAN S. ARRIESGADO


Forestry Assistant B Water Quality Head

Recommended by: Approved:

ENGR. PAUL G. OÑAS ENGR. WINSTON MAKILAN


Division Manager General Manager