SHAFT (1)
BRACKE
CLAMP HOUSING
(1) (2)
SPRING CLAMP
(2) (4)
BASE SPRING
(2)
G CLAMP
(4)
G HANDLE CASTING
SHAFT
4 5 6 7 8 9 10
BEARING
HOUSING
SHAFT
BASE
HANDLE
CLAMP
CASTING
BRACKET
SPRING
4 5 6 7 8 9 10
HOUSING GRILL (2)
OR SWITCH KNOB
1 2 3 4 5 6 7
FRAME
SUPPORT HOUSING
HANDLE
GRILL
FAN ASSY
BLADE
MOTOR
SWITCH EL UNIT
KNOB
1 2 3 4 5 6 7
(L0) 20" Fan, LT = 1 1 2 3 4 5 6 7
Gross Requirements 0 0 0 0 0 0 0
Scheduled Receipts 0 0 0 0 0 0 0
Projected OH Inventory 100 100 100 100 100 100 100
Net Requirements 0 0 0 0 0 0 0
Planned Order Receipts 0 0 0 0 0 0 0
Planned Order Release 0 0 0 0 0 0 900
(L1) Housing, LT = 1 1 2 3 4 5 6 7
Gross Requirements 0 0 0 0 0 0 900
Scheduled Receipts 0 0 0 0 0 0 0
Projected OH Inventory 100 100 100 100 100 100 100
Net Requirements 0 0 0 0 0 0 800
Planned Order Receipts 0 0 0 0 0 0 800
Planned Order Release 0 0 0 0 0 800 0
(L2) Frame, LT = 2 1 2 3 4 5 6 7
Gross Requirements 0 0 0 0 0 800 0
Scheduled Receipts 0 0 0 0 0 0 0
Projected OH Inventory 0 0 0 0 0 0 0
Net Requirements 0 0 0 0 0 800 0
Planned Order Receipts 0 0 0 0 0 800 0
Planned Order Release 0 0 0 800 0 0 0
(L2) Support, LT = 1 1 2 3 4 5 6 7
Gross Requirements 0 0 0 0 0 1600 0
Scheduled Receipts 0 0 0 0 0 0 0
Projected OH Inventory 50 50 50 50 50 50 0
Net Requirements 0 0 0 0 0 1550 0
Planned Order Receipts 0 0 0 0 0 1550 0
Planned Order Release 0 0 0 0 1550 0 0
(L2) Handle, LT = 1 1 2 3 4 5 6 7
Gross Requirements 0 0 0 0 0 800 0
Scheduled Receipts 0 0 0 0 0 0 0
Projected OH Inventory 400 400 400 400 400 400 0
Net Requirements 0 0 0 0 0 400 0
Planned Order Receipts 0 0 0 0 0 400 0
Planned Order Release 0 0 0 0 400 0 0
(L2) Hub, LT = 1 1 2 3 4 5 6 7
Gross Requirements 0 0 0 750 0 0 0
Scheduled Receipts 0 0 0 0 0 0 0
Projected OH Inventory 0 0 0 0 0 0 0
Net Requirements 0 0 0 750 0 0 0
Planned Order Receipts 0 0 0 750 0 0 0
Planned Order Release 0 0 750 0 0 0 0
(L2) Blades, LT = 2 1 2 3 4 5 6 7
Gross Requirements 0 0 0 3750 0 0 0
Scheduled Receipts 0 0 0 0 0 0 0
Projected OH Inventory 0 0 0 0 0 0 0
Net Requirements 0 0 0 3750 0 0 0
Planned Order Receipts 0 0 0 3750 0 0 0
Planned Order Release 0 3750 0 0 0 0 0
(L2) Motor, LT = 1 1 2 3 4 5 6 7
Gross Requirements 0 0 0 0 0 900 0
Scheduled Receipts 0 0 0 0 0 0 0
Projected OH Inventory 0 0 0 0 0 0 0
Net Requirements 0 0 0 0 0 900 0
Planned Order Receipts 0 0 0 0 0 900 0
Planned Order Release 0 0 0 0 900 0 0
(L2) Switch, LT = 1 1 2 3 4 5 6 7
Gross Requirements 0 0 0 0 0 900 0
Scheduled Receipts 0 0 0 0 0 0 0
Projected OH Inventory 20 20 20 20 20 20 0
Net Requirements 0 0 0 0 0 880 0
Planned Order Receipts 0 0 0 0 0 880 0
Planned Order Release 0 0 0 0 880 0 0
(L2) Knob, LT = 1 1 2 3 4 5 6 7
Gross Requirements 0 0 0 0 0 900 0
Scheduled Receipts 0 200 0 0 0 0 0
Projected OH Inventory 0 200 200 200 200 200 0
Net Requirements 0 0 0 0 0 700 0
Planned Order Receipts 0 0 0 0 0 700 0
Planned Order Release 0 0 0 0 700 0 0
8
1000
0
100
900
900
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
8
0
0
0
0
0
0
LT = 1 , LFL 1 2 3 4 5 6
Gross Requirements 0 15 0 20 0 10
Scheduled Receipts 0 0 0 0 0 0
Projected Inventory 0 0 0 0 0 0 0
Net Requirements 0 15 0 20 0 10
Planned Order Receipt 0 15 0 20 0 10
Planned Order Release 15 0 20 0 10 0
LT = 1, LS = 23 (EOQ) 1 2 3 4 5 6
Gross Requirements 0 15 0 20 0 10
Scheduled Receipts 0 0 0 0 0 0
Projected Inventory 0 0 0 8 8 11 11
Net Requirements 0 15 0 12 0 0
Planned Order Receipt 0 23 0 23 0 0
Planned Order Release 23 0 23 0 0 0
7 8 9 10 11 12
0 0 25 30 0 20
0 0 0 0 0 0 Unit cost Cost
0 0 0 0 0 0 Inv held 0 100 0
0 0 25 30 0 20
0 0 25 30 0 20
0 25 30 0 20 0 N-Ord 6 2500 15000
7 8 9 10 11 12
0 0 25 30 0 20
0 0 0 0 0 0 Unit cost Cost
1 1 1 22 15 15 Inv held 93 100 9300
0 0 24 8 0 5
0 0 46 23 0 23
0 46 23 0 23 0 N-Ord 5 2500 12500
Total
15000
Total
21800
ITEM LT (days)
Stapler Assembly 1
Base Assembly 1
Top Jaw 2
Bottom Jaw 3
Top Assembly 1
Pin 1
Spring Assembly 1
Base Plate 2
Base Molding 3
Jaw Support 1
Stake Rivet 1
Tension Plate 1
Top Plate 1
Top Cover 1
Locator Plate 2
Copper Spring 1
Slide Pin 1
Slide Housing 1
LT TIME BUCKET (week)
Level Item
(Wks) 1 2 3 4 5
0 Stapler Assembly 1
1 Base Assembly 1
2 Base Plate 2
2 Base Molding 3
2 Jaw Support 1
2 Stake Rivet 1
2 Tension Plate 1
1 Top Jaw 2
1 Bottom Jaw 3
1 Top Assembly 1
2 Top Plate 1
2 Top Cover 1
2 Locator Plate 2
1 Spring Assembly 1
2 Pin 1
2 Copper Spring 1
2 Slide Pin 1
2 Slide Housing 1
(L0) Stapler, LFL, LT = 1 1 2 3 4 5 6
Gross Requirements 1000 1000 1000 500 500 1500
Scheduled Receipts 0 0 0 0 0 0
Projected Inventory 1038 38 0 0 0 0
Net Requirements 0 962 1000 500 500 1500
Planned Order Receipt 0 962 1000 500 500 1500
Planned Order Release 962 1000 500 500 1500 0