Estimate Takeoff

You might also like

You are on page 1of 4

RFCCU_PR_05_QTY.

_ ESTIMATE
Q= L= W= D= T= H= Total/
Description Qty Length Width Depth Thickness Height Calculation Unit
nos m m m m m
CONCRETE (M30 Grade)

Pile cap -PC1 8 4 4 1.2 153.6


Pedestal 8 1.9 1.3 2.7 53.4

Pile cap -PC2 1 16 8.8 1.2 169.0


Pedestal 4 1.9 1.3 2.7 26.7

Pile cap -PC3 1 11.2 8.8 1.2 118.3


Pedestal 4 1.9 1.3 2.7 26.7

Pile cap -PC4 1 8.8 8.8 1.2 92.9


Pedestal 4 1.9 1.3 2.7 26.7
Total 667.1 Cum

PCC-C10 Grade
(75 mm Projection each side)

Pile cap -PC1 8 4.15 4.15 0.075 10.33


Pile cap -PC2 1 16.15 8.95 0.075 10.84
Pile cap -PC3 1 11.35 8.95 0.075 7.62
Pile cap -PC4 1 8.95 8.95 0.075 6.01
Total 34.80 Cum

Excavation

Pile cap -PC1 8 4.4 4.4 3.6 557.6


Pile cap -PC2 1 16.4 9.2 3.6 543.2
Pile cap -PC3 1 11.6 9.2 3.6 384.2
Pile cap -PC4 1 9.2 9.2 3.6 304.7
Total 1789.6 Cum

GROUT (TYPE G1) 50mm


(Non Shrink cementanious Grout)

Pile cap -PC1 8 4 4 0.05 6.4


Pile cap -PC2 1 16 8.8 0.05 7.0
Pile cap -PC3 1 11.2 8.8 0.05 4.9
Pile cap -PC4 1 8.8 8.8 0.05 3.9
Total 13.44 Cum
REINFORCEMENT
8 mm 1 MT
10 mm 1.3 MT
12 mm 1.12 MT
16 mm 0 MT
20 mm 1.1 MT
25 mm 22.3 MT
32 mm 9.8 MT
36.62 MT
TOTAL
BAR NO BAR DIA. SIDES LENGTH WEIGHT
6 25 4450 1 4.45 17.16821
NO OF
PEDESTALS NO OF TIES
14 25 6.01

You might also like