Professional Documents
Culture Documents
CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01
5 LOAD CALCULATIONS
A) Self-weight of Structural Members are generated in STAAD by defining the self-weight command.In addition to
selfweight 10% considered for connections and fixtures.
* Note: Vermiculite based lightweight cementitious Fire proofing is considered and applied through STAAD pro.
Specification command.
B) Self Weight of Grating = 0.5 kN/m2
D) Cable Duct load (1200 x400 assumed 2 Ducts Lvs) 960 kg/m per duct
E) Cable Tray Load 600 mm (Total gravity load considered) 0.85 kN/m + 0.85 kN per each level
F) Blind Flooring load below Air Cooler (150 mm thick assumed) .It has been considered in Staad Model.
CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01
5.5 LC 5 : ET (Equipment Test Load)
Not Applicable
Not Applicable
Note
1) Intermediate beam at tier level is designed for 25% of load on main portal beams in transverse direction.
Reduction of 10% in vertical loading shall be considered for main portal beams if intermediate beams are provided.
LC 11 : TL (Friction Load)
The friction force at each tier on every portal in both longitudinal and transverse directions shall be considered
as follows
For four or more pipes supported on a tier : 10% of the design vertical loading of the pipes,
For single to three pipes supported on a tier : 30% of the design vertical loading of the pipes.
Friction forces considered as uniformly distributed over the entire span of the beam at each tier.
Not Applicable
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).
CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01
Basic wind speed Vb = 44 m/s For Vadodara, Annex-A, IS: 875 (Part-3)-2015
Design Factors :
Risk coefficient factor k1 = 1.07 *From Table-1, IS: 875 (Part-3) - 2015
Terrain & Height factor k2 = *From Table-2, IS: 875 (Part-3) - 2015 (Category-2)
Topography factor k3 = 1 *From CL-6.3.3,IS: 875 (Part-3) - 2015
Imp. Fact. for cyclonic reg. k4 = 1 *From CL-6.3.4, IS: 875 (Part-3) - 2015
CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01
Transverse Wind loads on pipe & strucrure are calculated as per design basis as below
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).
CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01
Refer Appendix - E
Soil Type 2
5.0 (Transvers Direction)
Response Reduction Factor (R)
4.5 (Longitudinal/Braced direction)
Damping Factor 0.02
seismic load generated by STAAD.pro software by using seismic response spectrum definition command
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).
CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01
seismic load generated by STAAD.pro software by using seismic response spectrum definition command
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).
CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01
seismic load generated by STAAD.pro software by using seismic response spectrum definition command
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).
CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01
5.12 LC 23 : (PSV_POP)
Not Applicable