ATA 53 - LEFT AND RIGHT COUNTERTORQUE CROSSBEAM FITTING PLATE
ASSEMBLIES P/N 109-0330-17 INSPECTION OF.
/
REVISION LOG
New lssue
An opprapriote entry should be mode in the oircroft lag baok upan occomplishmenl.
lf ownership of aircroft has changed, please, forword to new owner.
P::::im::. 1 nf 1 A.
~~LEONARDO
~ HRICDPTERS
1. PLANNING INFORMATION
A. EFFECTIVITY
AII the A 109S helicopters.
B. COMPLIANCE
► For helicopter having accumulated less than 3000 (three thousand) landings:
at- reaching of 3000 landings or within the next 200 landings whichever
comes later and subsequently each 1500 landings.
► For helicopter having accumulated more than 3000 (three thousand) landings:
within the next 200 landings and subsequently each 1500 lahdings.
C. CONCURRENT REQUIR~MENTS
N.A.
D.REASON
This Service Bulletin is issued in order to introduce an inspection to the LH and RH
countertorque crossbeam fitting plate assemblies P/N 109-0330-17 (made of
aluminum alloy) to verify the presence of cracks near the bossed holes of the plate.
E. DESCRIPTION
Product lmprovement - Cases of cracks of the aluminum alloy 7475 LH and RH
countertorque crossbeam_fitting plate assemblies P/N 109-0330-17 around the bossed
holes of the plates have been reportad on AW109 series helicopters. In no case these
cracks had any effect on the conduit of flight.
The performed investigation concluded that the cracks reported on the fitting plates
are due to a marginality of the design, associated with the peculiar installation process
and that the cracks do not affect the Safety of the Flight.
This Service Bulletin is issued with the purpose to provide the necessary instructions
to perform an eddy current non-destructive inspection to verify the presence of cracks
on the LH and RH countertorque crossbeam fitting plate assemblies P/N 109-0330-17
in the area highlighted in the Figure1.
F.APPROVAL
The content of this Service Bulletin is approved under the authority of D0A nr.
EASA.21.J.005. For helicopters registered under other Aviation Authorities, before
applying the Service Bulletin, applicable Aviation Authority approval must be óhecked
within Leonardo Helicopters customer portal.
),
S.B. Nº109S-078
DATE: March 6, 2018
DC\/IQll"\11.1• /
~~LEONARDO
~ HEl/COPTERS
G. MANPOWER
To comply with this Service Bulletin approximately sixteen (16) Maintenance-Man-
Hours are deemed necessary.
Maintenance-Man-Hours are based on hands-on time and can change with personnel
and facilities available.
l. REFERENCES
1) PUBLICATIONS
DATA MODULE DESCRIPTION
DM01 0B-A-00-20-00-00A-120A-A Make the helicopter safe for
maintenance
2)ACRONYMS
DOA Design Organization Approval
EASA European Aviation Safety Agency
LHD Leonardo Helicopters Division
LH Left
LS Local Supply
N.A. Not Applicable
P/N Part Number
RH Right
SB Service Bulletin
S/N Serial Number
S.B. Nº109S-078
DATE: March 6, 2018
Ri::\/IC::l()"I· / p,,.,,.,. ~ ,-.f 1.d
-¡~LEONARDO
~ HELJCOPTERS
3) ANNEX
Annex A EDDY CURRENT WORK INSTRUCTIONS
J. PUBLICATIONS AFFECTED
Air vehicle maintenance planning information (EASA).
Air vehicle maintenance planning information (FAA).
S.B. Nº109S-078
DATE: March 6, 2018
P,:,na .d nf 1.d Rl=\/l~l()f\l· /
~~LEONARDO
~ HEUCOPTERS
2. MATERIAL INFORMATION
A. REQUIRED MATERIALS
1) PARTS
N.A.
2) CONSUMABLES
The following consumable materials, or equivalent, are necessary to accomplish this
Service Bulletin:
# P/N DESCRIPTION Q.TY NOTE
TT-N-95
(cod. 531055030) Aliphatic naphtha AR
CCC-C-46
2 Soft lint-free cloth AR
(cod. 590210190)
3) LOGISTIC MATRIX
LOGISTIC P/N Q.TY (PER HELO) NOTE PART
N/A N/A N/A
B. SPECIAL TOOLS
The following special tools, or equivalent, are necessary to accomplish this Service
Bulletin:
# P/N DESCRIPTION Q.TY NOTE PART
3 MIZ-21SR Eddy Current instrument 1 (1-3-5)
4 VM229F-6 45º absolute shielded probe 100+500 kHz 1 (2-3-5)
5 VM99FBN-21 Adapter 1 (2-3-5)
6 VM99BM Cable assy (2-3-5)
7 Commercial Flat calibration reference block in AL-AL Y 1 (5)
7475, with notch 0,5 mm deep
8 Commercial PTFE adhesive tape 1 (5)
S.8. Nº109S-078
DA TE: March 6, 2018
DC\/IC'l"IU• /
~~LEONARDO
~ HELICOl'TERS
request the tools supply on loan. As soon as the present Service Bulletin is
implemented the tools supplied on loan shall be promptly returned to LHD.
(85) Local supply.
S.B. Nº109S-078
DATE: March 6, 2018
OC\/ICIAll.1- /
~tLEONARDO
~ HELICOPrfRS
3. ACCOMPLISHMENT INSTRUCTIONS
GENERAL NOTES
a) The following procedures are applicable to left
countertorque crossbeam fitting plate assy P/N
109-0330-17 and to the right countertorque
crossbeam fitting plate assy P/N 1 09-0330-17.
b) Place an identification tag on ali components that
are re-usable, including the attaching hardware that
has been removed to gain access to the
modification area and adequately protect them until
their later re-use.
S.B. Nº109S-078
DATE: March 6, 2018
Ri=\/1~1()1\I· / D<>no 7 nf 1.4
7~LEONARDO
~ HEUCOPTfRS
S.B. Nº109S-078
DATE: March 6, 2018
n-- ..... O-.& A A ne::\ /IC'll"\11.1. /
~~LEONARDO
~ HELICOPTERS
ANNEXA
EDDY CURRENT WORK INSTRUCTIONS
S.B. Nº109S-078
DATE: March 6, 2018
R~\/l~ln1,.1- / P,:,nc Q nf 1Ll
..•
ANNEX A
-¡~LEONARDO
~ HEUCOPTfRS
THE OPERA TIVE WORK INSTRUCTION SHALL BE APPROVED IN ANY CASE BY EDDY
CURRENT LEVEL 3
SCOPE
This Work lnstruction defines the non-destructive inspection procedure by eé:tdy current (ET) in
accordance with AWPS008X, of the A109 Plates Assy, Fitting Countertorque Crossbeam PIN 109-
0330-17.
The scope of the inspection is to detect possible cracks.
EQUIPMENT
For the inspection the following equipment shall be available:
• an Eddy Current "MIZ-21SR" instrument (manufactured by Zetec lnc. in USA) (see Note);
• a 45º absolute shielded probe 100-;-500 kHz, PIN VM229F-6 (manufactured by VM Products
lnc. with adapter VM99FBN-21 for Zetec instrument) and the relevant cable VM99BM;
• a flat calibration reference block in aluminium, with notch 0,5 mm deep;
• sorne adhesive PTFE tape to protect the tip of the probe from wear damage and to simulate
the paint thickness on the reference block.
Note
Other instruments and/or probes can be used on mandatory condition that:
·a. the probe is absolute and shielded type with frequency range 100-500kHz;
b. the system "instrument plus probe" shall obtain equivalent results from the calibration;
c. the setup is at least carried out by a Level 2 in accordance with EN4179/NAS41 O and the
relevant Work lnstruction is approved by the Level 3 in accordance with EN4179/NAS410.
INSPECTION AREAS
The areas to be inspected are the connecting areas between plate and attacks, as highlighted
in the Figure 1.
SURFACES PREPARATION
The whole surfaces to be inspected shall be free from any grease, scale, conductive sealants or
other excessive contaminants that can interfere with the inspections.
The surfaces shall be inspected both painted and unpainted provided that a proper calibration
reference block is used.
EXAMINATION
WARNING!
1. THE PROBE SHALL BE KEPT AS PERPENDICULAR AS POSSIBLE TO THE
SURFACE IN ALL PHASES OF THE INSPECTION.
2. DURING THE SCANNING, IT IS VERY IMPORTANT TO MOVE THE PROBE SLOWLY
ANO UNIFORML Y.
S.B. Nº109S-078
D,:,n,:, 1() nf 1.d
DATE: March 6, 2018
Rl=\/l~l()f\l· /
ANNEXA
~~LEONRRDO
~ Hfl/COl'TERS
The calibration and the subsequent inspection shall be carried out in accordance with the
following sequence.
CALIBRA TION
The calibration shall be carried out before the inspection and rechecked after the end of the
inspection; it shall be periormed on the reference block detailed in the Par. - Equipment - in
accordance with the following sequence:
• put the sensor of the probe on the reference standard, press the compensation key and adjust
the phase of the instrument in a way that the lift-off signal results in horizontal deflection from
the centre to the left so that it is clearly distinguished from the defect indication (see trace A on
Figure 3),
• perform the scanning inspection on the reference standard to verify that, in correspondence of
the reference notch 0,5 mm deep, a deflection positioned at 45º clockwise about respect to the
lift-off signal, at least of three (3) main divisions of the screen (see trace B on Figure 3).
INSPECTION
When the instrument is calibrated, then inspect as follows:
• put the probe in a flat area far away from the edges, periorm the compensation and adjust
the phase in a way that the lift-off signal results in horizontal deflection;
• perform detailed examination scanning in order to cover the whole areas to be inspected
using circular path directions (see Figure 2) with indexing not greater than 3 mm and
covering a tilting of the sensor from 90º up to 45º;
• in case relevant linear indications are identified, periorm also a scanning perpendicular the
its main direction;
• recheck the instrument calibration as described before.
S.B. Nº109S-078
DATE: March 6, 2018
O C \ /IC'lf"\11.1- I
ANNEXA ~~LEONARDO
~ HElJCOPTERS
EVALUT ATION
Any vertical deflection equal or greater than the set threshold (see red trace on Figure 3),
unless it can be attributed to change in geometry or due to edge effect, shall be considered
relevant indication andas such processed.
In this case, it shall be verified the instrument calibration and the inspection repeated to confirm
the crack.
PERSONNEL
The inspections performed in accordance with this procedure shall be carried out by personnel
qualified at least Level 2 in the Eddy Current Method in accordance with EN4179 or NAS41 O
international standards.
S.B. N°109S-078
n--- ,f"') -.& -f A DATE: March 6, 2018
OC\ /IC'lr\1\1- /
ANNEXA
~~LEONARDO
~ HEL/COPTERS
• SIN 7208
(!•··=F=l=5CJr---JI
o
• • •
•
Figure 1 - lnspection areas connecting plate and attacks.
Figure 2 - Sean paths for the sensor to the surface, 90º and 45º. The arrows show the
scanning directions
S.B. Nº109S-078
DATE: March 6, 2018
O C \ /IC ll"\~1- /
,r,,.
ANNEX A ,~ LEONARDO HEUCOPTERS
B. .
:'-
. . ...!,
.
- .:. . : . .
. . .
A·
Figure 3.Typical signal from the calibration phase (A= lift-off, B = indication from reference notch
0,5mm deep). The red hatched-line shows the acceptance/rejection threshold.
S.B. Nº109S-078
n AA -~ A A
DATE: March 6, 2018
~~LEONARDO
~ HELICOPTERS AgustaWest/and Products
Fax:
Remarks:
lnformation:
We request your cooperation in filling this form, in arder to keep out statistical data relevan! to aircraft configuration up-to-date. The form should be filled in ali
its parts and sen! to !he above address or you can communicate the application also vía Technical Bulletin Application Communication Section placed in
Leonardo AW Customer Portal - MvCommunications Area. We thank vou beforehand for !he information aiven.
ERRATA CORRIGE
Please find here attached the page that has to be replaced in the basic Service Bulletin
n°109S-078.
Was:
lf no damages are found on the left and right countertorque crossbeam fitting plate assemblies
P/N 109-0330-17, proceed as described in step 11 and following.
Becomes:
lf no damages are found on the left and right countertorque crossbeam fitting plate assemblies
P/N 109-0330-17, proceed as described in step 5 and following.