AVU & SR-LPG Treatment Unit

Paradip Refinery
DATE:17.03.2023
Topic Covered:
CONSEQUENCES ON EMERGENCY SHUTDOWN OF F101/F201/F002
Faculty: MD ARIF
Training Session Attended By:
Sl. Sl.
Name Signature/Date Name Signature/Date
No. No.
BHABANI
1 8

DHEERAJ
2 9

DURGESH
3 10

ANIL
4 11

AVNISH
5 12

SASMAY
6 13

7 14

Discussion Points:

The consequences of ESD activation from field or DCS panel are checked with OPERATING MANUAL data
and PLC at DCS ESD panel and found at par .

Consequences are described at attached sheet. Field personnels (SIC/EA) TO ENSURE ACTUAL CLOSURE
OF XZV S and bypass to be closed if any in FG/FO line.

Suggestions for Improvement of the Content:

AVU & SRLPG Treatment Unit - Skill DevelopmentPage 1 of 2